Initial Construction Costs definition

Initial Construction Costs has the meaning assigned to such term in Section 3.1(d), below.
Initial Construction Costs means the costs expended to design, develop and construct the Ballpark through initial occupancy.
Initial Construction Costs means the costs expended to design, develop and construct the Rangers Ballpark through its initial occupancy.

Examples of Initial Construction Costs in a sentence

  • Agency Costs and Initial Construction Costs ....................................

  • Total present worth for streambank fencing $3,562,405Total Nutrient Removed:TN= 10,000 lbs/yr (required; actual removal = 72,288 lb/yr (5.4 lb/section x 13,386 sections)TP= 3,000 lbs/yr No-Till: Initial Construction Costs for TN and TP… $0 Present worth of additional operation and maintenance costs for TN and TP removal= cost of no-till BMP per acre X uniform series present worth factor for 4.875% for 20 years:.$76,275(12.558)… $957,861 for 20 years Total present worth for no-till.

  • Cost Summary Window of Net Savings in Agency Initial Construction Costs 53Figure 40.

  • Total Present Worth Calculation Streambank Fencing: Initial Construction Costs for TN and TP… $3,562,405Present worth of additional operation and maintenance costs for nutrient removal.

  • Incremental Initial Construction Costs PrototypeValue Table 4.13.

  • The impact of constructability/phasing issues and/or maintenance and protection of traffic constraints should be reflected by varying Initial Construction Costs, User Delay Costs, and/or Maintenance and Protection of Traffic Costs, and not considered separately.

  • From at least the time of Bracton a judicial balancing exercise concerning conflicting users of land evolved.

  • Surface power density is approximately 35 watts/square foot.• Initial Construction Costs – 300,000 amp-hours equates to 3600 kWh. Battery prices range around $400 to $750 per kilowatt-hour (approximately $1.4M - $2.7M) plus the cost of a building system (approximately $1,000,000) to contain and ventilate the battery system.• Environmental –1.

  • In the event the Landlord shall terminate this Lease during the current lease term or any renewal term, or if the Tenant shall terminate the Lease during any renewal term (that is, after June 30, 2029), then in that event Landlord shall pay to the Tenant the unamortized Initial Construction Costs as determined in accordance with the amortization chart attached as Exhibit C.

  • Table 8.4: Initial Construction Costs for Rail withMultimodal Options for Alternatives 5through 8rehabilitation of the existing Long Bridge was estimated at $68 million.


More Definitions of Initial Construction Costs

Initial Construction Costs means all costs incurred and amounts payable by the Interconnection Customer under the CLGIA in connection with the initial design, engineering and construction of the Interconnection Facilities, the Network Upgrades and the Distribution Upgrades (if any), but excludes any costs incurred or payable following and not related to such initial design engineering and construction (including any costs for the subsequent repair, replacement or maintenance of such facilities and upgrades).

Related to Initial Construction Costs

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Construction Costs means land costs, all costs paid to construct and complete the Improvements, as specified on Exhibit "B" attached hereto and made a part hereof.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Original construction ’ shall mean the first or initial construction

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Construction and demolition debris means and includes:

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Construction Fee means a fee or other remuneration for acting as general contractor and/or construction manager to construct improvements, supervise and coordinate projects or provide major repairs or rehabilitations on a Property.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Project Costs means all allowable costs, as set forth in the applicable Federal cost principles, incurred by a recipient and the value of the contribu- tions made by third parties in accom- plishing the objectives of the award during the project period.

  • construction site means a workplace where construction work is being performed;

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Construction Work means any work in connection with⎯

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Construction Debt means debt incurred to fund (a) all or a portion of a Capital Improvement, (b) interest payments (including periodic net payments under related interest rate swap agreements) and related fees on other Construction Debt or (c) distributions (including incremental Incentive Distributions) on Construction Equity.