Examples of Installation Cost in a sentence
Costs MUST reflect prices and rates quoted in accordance with ITT17 and Line Item No. Subsystem / ItemSupply and Installation Cost Sub-Table No.[ insert: Kenya shillings] Price[ insert: Local Currency] Price[ insert: Foreign Currency A] Price1Project Plan- - 2Subsystem 1 SUBTOTALS TOTAL (To Grand Summary Table) Note: - indicates not applicable.
Line-item number: [specify: relevant line-item number from the Supply and Installation Cost Summary Table (e.g., 1.1)] Prices, rates, and subtotals MUST be quoted in accordance with ITT 17 and ITT18.
Line Item No.Subsystem/ItemSupply and Installation Cost Sub-Table No.[insert: Kenya Shillings] Price[insert: Local Currency] Price[insert: Foreign Currency A]Price1.
Costs MUST reflect prices and rates quoted in accordance with ITT17 and Line Item No. Subsystem / ItemSupply and Installation Cost Sub-Table No.[ insert: Kenya shillings] Price[ insert: Local Currency] Price[ insert: Foreign Currency A] Price1Project Plan- - 2Subsystem 1 SUBTOTALS TOTAL (To Grand Summary Table) Note: - indicates not applicable.
Contribution Fixtures refer to Company Fixtures for which installation the customer has paid the following Contributed Installation Cost.
The in- stallation cost is calculated using the following equation: Installation Cost = ⎛ Incremental hours⎞ × $35 ⎞⎟ × ⎛ CPIR ⎞⎝ for installation ⎠⎝ hour ⎠ ⎜⎝ CPI1992 ⎟⎠ Where,CPIR is the most recent published Consumer Price Index at time of rebuild (for ‘‘all items’’ as published by the U.S. Bureau of Labor Statistics).CPI1992 is the Consumer Price Index (for ‘‘all items’’ as published by the U.S. Bureau of Labor Statistics) for 1992.
Costs MUST reflect prices and rates quoted in accordance Line Item No. Subsystem / ItemSupply and Installation Cost Sub-Table No.[ insert: Kenya shillings] Price[ insert: Local Currency] Price[ insert: Foreign Currency A] Price1Project Plan- - 2Subsystem 1 SUBTOTALS TOTAL (To Grand Summary Table) Note: - indicates not applicable.
Supply and Installation Cost Sub-Table [insert: identifying number] Line-item number: [specify: relevant line-item number from the Supply and Installation Cost Summary Table (e.g., 1.1)] Prices, rates, and subtotals MUST be quoted in accordance with ITT 17 and ITT18.
Member request for interval metering (for connected load under the threshold as defined in the Settlement System Code): $Capital and Installation Cost of meter, phone line or cell phone plus monthly phone line charges.
Installation Cost, Cost of materials not salvable and removal Cost of facilities for temporary Service shall be paid by the Customer in addition to the amounts arrived at by applying the appropriate Rate Schedule.