Major breakdown definition

Major breakdown means a stoppage of operation of an amusement ride or amusement attraction occurring from damage of a structural component.
Major breakdown means stoppage of operation from any cause that results in damage, failure, or breakage in a stress-bearing part of covered equipment.
Major breakdown means an unforeseeable mechanical or electrical failure off CNG of clean fuel dispensing equipment which cannot in the exercise of reasonable diligence be repaired in 72 hours or less.

Examples of Major breakdown in a sentence

  • They live on earth in thought And deem as truly as in heaven Both white marble stone – 4 ft 6 inches high Children: 1.

  • Major breakdown" means an unforeseeable mechanical or electrical failure off CNG of clean fuel dispensing equipment which cannot in the exercise of reasonable diligence be repaired in 72 hours or less.

  • Major breakdown calls case of attended and lift shall be brought into operation within 3 days from the date of lodging of complaint.

  • Any proposal to dissolve the district shall be subject to confirmation by the voters of the district in accordance with Government Code section 56654.

  • Major breakdown includes burning of motors, changing gearbox, changing wire ropes & changing trailing cable etc which shall be attended within four days.

  • Based on this if the breakdown occurs before which the period of Major breakdown will be computed considering half a day break on the day of complaint if this breakdown occurs in the post lunch period of major breakdown will be computed starting from the next working day.

  • As far as possible all the repairs should be carried out at site.• Bi-monthly service of unit.• BDS 2 services in a year• Breakdown call should be immediately attended to.• Major breakdown should be completed within 24 hrs.7. Contractors should inspect the premises and air-conditioners before submitting their Quotes for AMC; 8.

  • Major breakdown of the capital expenditures are investment in software of ¥5.6 billion at Sony Life, ¥2.0 billion at Sony Assurance and ¥1.4 billion at Sony Bank.For the purpose of enhancing system and operational efficiency, Sony Assurance began developing new systems in the fiscal year ended March 31, 2007.

  • Rates quoted for the tender shall be taken as applicable to all leads, lifts and taxes.

  • Name of work: Major breakdown maintenance and Repairng of existing faulty 500 KVA DG sets (Kirloskar male ) Sl.no.DV09001/1000037 at ARTTC campus....


More Definitions of Major breakdown

Major breakdown means damage, failure or breakage of a structural or stress bearing part of a device.
Major breakdown means a stoppage of operation resulting from damage, fa ilure , or breakage of a stress bearing part of a ride or device.
Major breakdown means a breakdown (such as due to switchgear failure or cable fault) which results in the interruption of electricity supply that requires substantial time to restore.
Major breakdown means a stoppage of operation from whatever cause resulting in damage, failure, or breakage of a structural or stress-bearing part of a ride.
Major breakdown means an unforeseeable mechanical or electrical failure off CNG dispensing
Major breakdown means damage, failure or breakage of a structural or stress bearing part of a device. "MAJOR MODIFICATION" means any change in either the structural or operational characteristics of the device

Related to Major breakdown

  • Breakdown /“breaks down”/“broken down” means an event during the policy period, that stops the vehicle from being driven because of a mechanical or electrical failure including as a result of battery failure, running out of fuel, flat tyres, but not as a result of a mis-fuel, road traffic collision, fire, flood, theft, acts of vandalism, any driver induced fault, or any key related issue other than keys locked in your vehicle;

  • Persistent Failure means any two (2) or more failures by the Supplier in any rolling period of twelve (12) months to comply with obligations in respect of the Contract Services under the Contract;

  • Service Failure means a failure by the Contractor to provide the Services in accordance with any individual service level described above (measured on a monthly/quarterly/annual basis)

  • Epidemic Failure means a series of repeating failures or defects resulting in at least a 0.5% failure rate for the same Product or Material during any twelve-month period.

  • Lockdown means the period between 23H59 on 26 March 2020, until 23H59 on 30 April 2020;

  • major accident means an incident involving loss of life inside or outside the site or 10 or more injuries inside and / or one or more injuries outside or release of toxic chemical or explosion or fire or spillage of hazardous chemicals resulting in ‘on-site’ or ‘off-site’ emergencies or damage to equipment leading to stoppage of process or adverse effects to the environment.

  • Persistent Breach means a Default which has occurred on three or more separate occasions with a continuous period of six (6) months.

  • Relevant Force Majeure Event means a Force Majeure Event in relation to which an Affected Party is claiming relief under this Clause 17; and

  • Outage has the meaning set forth in the CAISO Tariff.

  • Force Majeure Delay means with respect to the Servicer, any cause or event which is beyond the control and not due to the negligence of the Servicer, which delays, prevents or prohibits such Person’s delivery of the reports required to be delivered or the performance of any other duty or obligation of the Servicer under the Indenture, as the case may be, including, without limitation, computer, electrical and mechanical failures, acts of God or the elements and fire; provided, that no such cause or event shall be deemed to be a Force Majeure Delay unless the Servicer shall have given the Indenture Trustee written notice thereof as soon as practicable after the beginning of such delay.

  • Premises Total Destruction means damage or destruction to the Premises, other than Lessee Owned Alterations and Utility Installations and Trade Fixtures, which cannot reasonably be repaired in six (6) months or less from the date of the damage or destruction. Lessor shall notify Lessee in writing within thirty (30) days from the date of the damage or destruction as to whether or not the damage is Partial or Total.

  • Excused Downtime means the number of minutes in the Charging Period that the LSP is unavailable due to:

  • Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,

  • Landlord Delay means a delay in the construction of the Tenant Improvements or Compliance Work resulting directly from the acts or omissions of Landlord, Landlord’s employees, agents, or contractors including, but not limited to (i) failure of Landlord to timely approve or disapprove any plans; (ii) interference by Landlord, its employees, agents or contractors with the completion of the Tenant Improvements or Compliance Work (including the impairment of Tenant’s contractors’ or vendors’ or employees’ access to the Premises for any reason (including due to the presence of Landlord’s contractors, vendors or personnel), failure to provide reasonable access to the Building’s loading docks or other facilities necessary for the construction of the Tenant Improvements or Compliance Work and/or the movement of materials and personnel to the Premises for such purpose) and (iii) delays due to the acts or failures to act of Landlord, its agents or contractors with respect to payment of the Tenant Improvement Allowance. If Tenant contends that a Force Majeure Construction Delay or a Landlord Delay has occurred, Tenant acknowledges and agrees that it has inspected the Building and the Site and in no event shall the physical character or condition of the Building and/or Site existing as of the Effective Date constitute a basis for a Landlord Delay (this agreement does not apply to the failure of any Building component to properly operate). Further, in no event shall any delay of Landlord constitute a Landlord Delay unless such delay results in a full day of delay in the construction of the Tenant Improvements or Compliance Work. Tenant shall notify Landlord in writing (the “Delay Notice”) of the event which constitutes such Force Majeure Construction Delay or Landlord Delay; such notice may be via electronic mail to Landlord’s construction representative described above. Tenant will additionally use reasonable efforts to mitigate the effects of any Force Majeure Construction Delay or Landlord Delay through the re-sequencing or re-scheduling of work, if feasible, but this sentence will not be deemed to require Tenant to incur overtime or after-hours costs unless Landlord agrees in writing to bear such costs. If the actions or inactions or circumstances described in the Delay Notice constitute a Landlord Delay, and are not cured by Landlord within one (1) business day after Landlord’s receipt of the Delay Notice, then a Landlord Delay shall be deemed to have occurred commencing as of the expiration of such one (l)-business day period. The Lease Commencement Date and the Lease Expiration Date will each be delayed on a day for day basis for each day of Force Majeure Construction Delay or Landlord Delay.

  • Premises Building Total Destruction means if the Building of which the Premises are a part is damaged or destroyed to the extent that the cost to repair is fifty percent (50%) or more of the then Replacement Cost of the Building.

  • Service Level Failure means a failure to perform the Software Support Services fully in compliance with the Support Service Level Requirements.

  • Force Majeure Delays means any actual delay in the construction of the Tenant Improvements, which is beyond the reasonable control of Landlord or Tenant, as the case may be, as described in Paragraph 33 of the Lease.

  • Tenant Delay means an actual delay in the occurrence of the Substantial Completion Date or the Final Completion Date with respect to Landlord’s Work as the result of: (1) any unreasonable delay by Tenant in approving the Plans; (2) any request by Tenant that Landlord delay the commencement or completion of Landlord’s Work for any reason; (3) any request by Tenant to change the Plans after initial approval thereof by Tenant, or the making of any changes to Landlord’s Work requested by Tenant and agreed to by Landlord after initial approval of the Plans by Tenant; (4) any failure by Tenant to respond in writing within seven (7) business days after any written request by Landlord for clarification or interpretation of the Plans or for approval of changes in the Plans deemed necessary by Landlord; or (5) any other act or omission of Tenant or its officers, agents, employees or contractors; Notwithstanding the foregoing, no event shall be deemed to be a Tenant Delay until and unless Landlord has given Tenant written notice (the “Tenant Delay Notice”) advising Tenant (i) that a Tenant Delay is occurring, (ii) of the basis on which Landlord has determined that a Tenant Delay is occurring, and (iii) the actions which Landlord believes that Tenant must take to eliminate such Tenant Delay, and Tenant has failed to correct the Tenant Delay specified in the Tenant Delay Notice within forty-eight (48) hours following receipt thereof. No period of time prior to expiration of such 48-hour period shall be included in the period of time charged to Tenant pursuant to such Tenant Delay Notice if Tenant corrects the Tenant Delay specified in the Tenant Delay Notice within such 48-hour period.

  • Congenital Anomaly means a condition which is present since birth, and which is abnormal with reference to form, structure or position.

  • Major Work means any Work to Construct or Maintain the Distribution System that costs more than One Hundred Thousand ($100,000.00) Dollars;

  • Major Tenant means a tenant of a Loan Party under a lease of Property which entitles it to occupy 15,000 square feet or more of the net rentable area of such Property.

  • Excusable Delay means a delay due to acts of God, governmental restrictions, stays, judgments, orders, decrees, enemy actions, civil commotion, fire, casualty, strikes, work stoppages, shortages of labor or materials or other causes beyond the reasonable control of Borrower, but lack of funds in and of itself shall not be deemed a cause beyond the control of Borrower.

  • Major renovation means the renovation of a building where:

  • Price Failure means, with respect to a particular date of determination, the VWAP of the Common Stock on any Trading Day during the twenty (20) Trading Day period ending on the Trading Day immediately preceding such date of determination fails to exceed the Floor Price (as adjusted for stock splits, stock dividends, stock combinations, recapitalizations or other similar transactions occurring after the Subscription Date). All such determinations to be appropriately adjusted for any stock splits, stock dividends, stock combinations, recapitalizations or other similar transactions during any such measuring period.

  • Planned Downtime means planned downtime for upgrades and maintenance to the Services scheduled in advance of such upgrades and maintenance.

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.