Examples of Metering Procedures in a sentence
The Checked Metered Quantities shall be determined according to the respective Interconnection Agreement or according to the Metering Procedures as described in Attachment D and applicable between the TSO and the respective Adjacent TSO.
The determination of the final quantities of Natural Gas offtaken by the End User at the End User Domestic Exit Point shall be performed by the TSO on an hourly basis after the Month using Checked Metered Quantities determined according to the Connection Agreement or according to the Metering Procedures as described in Attachment D, as the case may be.
Tactical Surface Metering Procedures and Information Needs for Charlotte Douglas International Airport (SVerma, AHFE2018) This paper focuses on the procedures and information requirements associated with the tactical surface metering tool used in the CLT ramp control tower.
The installation, maintenance, testing and data transfer etc shall be as per the provisions drawn out in detailed Metering Procedures formulated and notified by the STU (now DTL) with the approval of the State Electricity Regulatory Commission.
Metering Procedures Unmetered Service The Bill Estimated Billing F.
Bunce, Cole kickoff 63 yards to the KU2, Charlot,Daylon return 16 yards to the KU18 (Olonilua, Sewo).KANSAS drive start at 12:28.1-10 KU 18 Schadler,Ryan rush for loss of 6 yards to the KU12 (Bradley, Chris).2-16 KU 12 Bender,Peyton sacked for loss of 4 yards to the KU8 (Blacklock, Ross;Bradley, Chris).
Equation (4) states the objective function to be mini- mized: the weighted sum of all the latencies.
This capability leverages improved situational awareness via data exchange (which is another key capability included in the Surface CDM concept) for accurate prediction of demand and capacity imbalances, notification of predicted imbalances to stakeholders, and implementation of Departure Metering Procedures or Programs (DMPs) to equitably allocate constrained NAS resources among stakeholders.
Unless the customer has hourly or half hourly metering as required by the Metering Procedures, load profiles must be identified for the particular customer with an assignment for energy loss s on the distribution network.
An approved list of specific metering equipment can be found within CL&P’s Metering Procedures for PA 11-80 Renewable Energy Credits (“MPREC”), which will be updated from time to time by CL&P to reflect currently approved metering technology.