NTP 2 definition

NTP 2 means a second notice to proceed with design and construction Work, except
NTP 2 means a second notice to proceed with design and construction Work, except construction and other ground disturbing Work in the Center Segment, as described in ITP Section 1.6.3.
NTP 2 means the written notice issued by the Authority to Developer authorizing Developer to proceed with Construction Work.

Examples of NTP 2 in a sentence

  • Beginning on NTP 2, Developer assumes all responsibility and liability associated with Existing Improvements, including inter alia any improvements constructed by TxDOT or by third parties, any impacts upon initial design and construction, and defects affecting operations, maintenance, renewal and replacement requirements.

  • The CQMP must be submitted by the Contractor in accordance with the Contract, included as part of the Project Management Plan (PMP), and must be reviewed and approved by SCDOT prior to Notice to Proceed #2 (NTP 2).

  • Developer shall conduct a pre-design coordination meeting no later than 1) 10 21 Business Days prior to any Design Work associated with NTP 1 or 2) issuance of NTP 2.

  • LTD Edition : 2015 Price : ` 105/- ISBN: 9789351720256 Our Online DistributorsOur Regional Offline Distributorss www.flipkart.coms Bhumi Marketing, Lucknows www.amazon.ins Jaiswal Book Shop, Allahabads www.paytm.coms Alka News Agency, Patnas www.infibeam.coms Vikas Book Agency, Hyderabads www.bookadda.coms UBSPD, Delhis Saivenkatramanna, Hyderabad s Universal, Chandigarh Note:1.All right reserved.

  • In accordance with 29 Section 7.4, preparation of the initial Transportation Management Plan and resolution of 30 all ADOT comments thereon shall be a condition precedent to issuance of NTP 2.

  • In accordance with 28 Section 7.4, preparation of the initial Transportation Management Plan and resolution of 29 all ADOT comments thereon shall be a condition precedent to issuance of NTP 2.

  • In the event the Authority authorizes Developer to perform Advance Construction Work, Developer shall satisfy and comply with the conditions and requirements imposed by the Authority in respect of such Advance Construction Work, which may include certain conditions and requirements identified in Section 7.5 (Conditions to NTP 2), prior to commencing such activities.

  • Notice to Proceed (NTP) 1 (issued on February 7, 2011) allowed STP to commence with preliminary engineering and NTP 2 (issued on August 23, 2011) allowed STP to commence with final design and construction.The instant dispute (reportedly on the order of $5 M) is related to the effect of WSDOT’s post-award transmittal of certain Alaskan Way Viaduct (AWV) settlement information to STP.

  • Prior to issuance of NTP 2, Developer 40 shall submit a Collocated Office Layout Plan to ADOT for review and comment.

  • Refer to Sections 14.4.11, 14.4.12 and 20 14.4.13 regarding Price adjustments to be made for certain delays in issuance of NTP 2 21 or NTP 3, and to Section 24.5 regarding Developer’s right to terminate and termination 22 compensation for certain delays in issuance of NTP 1 or NTP 2.


More Definitions of NTP 2

NTP 2 means a written notice issued by GDOT to Design-Build Team authorizing Design-Build Team to proceed with the portion of the Work described in Article 3.3.
NTP 2 means City’s issuance to XXXX Firm of a written notice to proceed with the Construction Phase Work.
NTP 2 shall have the meaning set forth in the D/B Road Contract. Retainage shall have the meaning set forth in the D/B Road Contract.
NTP 2 means the written notice issued by FDOT to Concessionaire authorizing Concessionaire to proceed with Construction Work and the O&M Work for the Construction Period.
NTP 2 means the Notice to Proceed with respect to Segment 2. “NTP 3” means the Notice to Proceed with respect to Segment 3.

Related to NTP 2

  • NTP means Notice to Proceed.

  • MDF means a CenturyLink distribution frame (e.g., COSMIC™ frame) used to connect CenturyLink cable pairs and line and trunk equipment terminals on a CenturyLink switching system. "Maintenance and Repair" involves the exchange of information between Carriers where one initiates a request for maintenance or repair of existing products and services or Unbundled Network Elements or combinations thereof from the other with attendant acknowledgments and status reports in order to ensure proper operation and functionality of facilities. "Maintenance of Service charge" is a Miscellaneous Charge that relates to trouble isolation work performed by CenturyLink. Basic Maintenance of Service charges apply when the CenturyLink technician performs work during standard business hours. Overtime Maintenance of Service charges apply when the CenturyLink technician performs work on a business day, but outside standard business hours, or on a Saturday. Premium Maintenance of Service charges apply when the CenturyLink technician performs work on either a Sunday or CenturyLink recognized holiday.

  • Class I renewable energy means electric energy produced from

  • Class II renewable energy means electric energy produced at a

  • Wind Turbine means a mechanical/electrical system that converts the kinetic energy of blowing wind into mechanical or electric power.

  • Backflow preventer means any device or means to prevent backflow;

  • Backflow means the backflow of water or other liquids, mixtures, or substances into the distribution pipes of a potable water system from any source other than the intended source of the potable water supply.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Asynchronous means not simultaneous or concurrent in time. For the purpose of this general rule, asynchronous telecommunication technologies for telemedicine or telehealth services may include audio and video, audio without video, client or member portal and may include remote monitoring. "Asynchronous" does not include voice messages, facsimile, electronic mail or text messages.¶

  • Solar renewable energy certificate or "SREC" means a

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Renewable Energy Certificates or “RECs” shall mean all of the Certificates and any and all other Environmental Attributes associated with the Products or otherwise produced by the Facility which satisfy the RPS for a RPS Class I Renewable Generation Unit, and shall represent title to and claim over all Environmental Attributes associated with the specified MWh of generation from such RPS Class I Renewable Generation Unit.

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.

  • Renewable Energy Certificate or "REC" means a certificate

  • Small cell facility means a wireless facility that meets both of the following qualifications: (i) each antenna is located inside an enclosure of no more than six cubic feet in volume, or, in the case of an antenna that has exposed elements, the antenna and all of its exposed elements could fit within an imaginary enclosure of no more than six cubic feet and (ii) all other wireless equipment associated with the facility has a cumulative volume of no more than 28 cubic feet, or such higher limit as is established by the Federal Communications Commission. The following types of associated equipment are not included in the calculation of equipment volume: electric meter, concealment, telecommunications demarcation boxes, back-up power systems, grounding equipment, power transfer switches, cut-off switches, and vertical cable runs for the connection of power and other services.

  • IVR means Interactive Voice Response.

  • NOC means National Olympic Committee.

  • Backflow prevention device means a safety device used to prevent pollution or contamination of the water supply due to the reverse flow of water from the irrigation system.

  • Gasification means the substoichiometric oxidation or steam reformation of a substance to produce a gaseous mixture containing two or more of the following: (i) oxides of carbon; (ii) methane; and (iii) hydrogen;

  • PM10 means particulate matter with an aerodynamic diameter less than or equal to a nominal 10 micrometers as measured by an EPA reference or equivalent method.

  • RFT means Request for Tender.

  • Level 2 Support means, with the use of technical support specialists: (i) performing Defect isolation, Defect replication and interoperability testing; (ii) performing remote diagnostic services and on-site troubleshooting, if required; (iii) identifying the source of Defects; (iv) developing a reproducible test case for any Defect and documenting the details of such Defect for escalation to Level 3 Support; and (v) developing and implementing Workarounds where reasonably possible.

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • Interconnector means equipment used to link the electricity system of the State to electricity systems outside of the State;

  • L1. L2 etc means First or second Lowest Offer etc."L1. L2 etc" means First or second Lowest Offer etc. "LC" means Letter of Credit"LC" means Letter of Credit

  • MVAR means megavolt ampere of reactive power.