Rolling Forecast has the meaning set forth in Section 4.2.
Forecast means the hourly forecast of (a) the total electric energy production of the Generating Facility (in MWh) when the Generating Facility is not PIRP-eligible or Buyer is not Scheduling Coordinator net of the Site Host Load and Station Use, or (b) the available total generation capacity of the Generating Facility (in MW) when the Generating Facility is PIRP-eligible and Buyer is Scheduling Coordinator net of the Site Host Load and Station Use.
Forecast GDP means the average forecast for British Columbia’s real GDP growth made by the Economic Forecast Council and as reported in the annual February budget of the government;
PJM Region Peak Load Forecast means the peak load forecast used by the Office of the Interconnection in determining the PJM Region Reliability Requirement, and shall be determined on both a preliminary and final basis as set forth in Tariff, Attachment DD, section 5.
Cash Flow Forecast means a 13-week cash flow forecast for the then applicable period, which shall include, among other things, anticipated cash collections and receipts and anticipated disbursements for each calendar week covered thereby.
Marketing Plan has the meaning set forth in Section 4.3(a).
Contract Year means each period of twelve (12) consecutive months during the Initial Term of this Agreement, with the first Contract Year commencing on the Effective Date, and with each subsequent Contract Year commencing on the anniversary of the Effective Date.
Manufacturing Services means the manufacturing, quality control, quality assurance, stability testing, packaging, and related services, as set forth in this Agreement, required to manufacture Product or Products using the Active Materials, Components, and Xxxx Back Items;
Firm Order shall have the meaning set forth in Section 5.2.
Development Plan has the meaning set forth in Section 3.2.
System Impact Study means an assessment by the Transmission Provider of (i) the adequacy of the Transmission System to accommodate a Completed Application, an Interconnection Request or an Upgrade Request, (ii) whether any additional costs may be incurred in order to provide such transmission service or to accommodate an Interconnection Request, and (iii) with respect to an Interconnection Request, an estimated date that an Interconnection Customer’s Customer Facility can be interconnected with the Transmission System and an estimate of the Interconnection Customer’s cost responsibility for the interconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested system upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to provide the requested incremental rights. “System Protection Facilities” shall refer to the equipment required to protect (i) the Transmission System, other delivery systems and/or other generating systems connected to the Transmission System from faults or other electrical disturbance occurring at or on the Customer Facility, and (ii) the Customer Facility from faults or other electrical system disturbance occurring on the Transmission System or on other delivery systems and/or other generating systems to which the Transmission System is directly or indirectly connected. System Protection Facilities shall include such protective and regulating devices as are identified in the Applicable Technical Requirements and Standards or that are required by Applicable Laws and Regulations or other Applicable Standards, or as are otherwise necessary to protect personnel and equipment and to minimize deleterious effects to the Transmission System arising from the Customer Facility.
reasonable forecast means a forecast prepared by the Borrower not earlier than twelve months prior to the incurrence of the debt in question, which both the Bank and the Borrower accept as reasonable and as to which the Bank has notified the Borrower of its acceptability, provided that no event has occurred since such notification which has, or may reasonably be expected in the future to have, a material adverse effect on the financial condition or future operating results of the Borrower.
service delivery and budget implementation plan means a detailed plan approved by the mayor of a municipality in terms of section 53(1) (c) (ii) for implementing the municipality’s delivery of municipal services and its annual budget.
Product Schedule means the “Product Schedule” that forms part of the Contract.
Supply Plan has the meaning set forth in the CAISO Tariff.
Project Year means the twelve-month period beginning from the Effective Date and ending twelve months thereafter (the First Project Year), and any twelve-month period beginning at the end of the First Project Year, or the end of subsequent Project Years;
Finished Services means complete end-to-end services offered by Qwest to wholesale customers or retail End User Customers. Finished Services do not include Unbundled Network Elements or combinations of Unbundled Network Elements. Finished Services include Access Services, private lines, retail services, and resold services.
Manufacturing operation means a process in which materials are changed, converted, or transformed into a different state or form from which they previously existed and includes refining materials, assembling parts, and preparing raw materials and parts by mixing, measuring, blending, or otherwise committing such materials or parts to the manufacturing process. "Manufacturing operation" does not include packaging.
Economic Forecast Council means the Economic Forecast Council appointed under s. 4 of the Budget Transparency and Accountability Act, [S.B.C. 2000] c. 23;
Quality Assurance means a systematic procedure for assessing the effectiveness, efficiency, and appropriateness of services.
Engineering Services means infrastructure for –
Timeline means the list of critical dates and actions included in the Introductory Materials.
Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.
Project Plan means the document to be developed by the Contractor and approved by WTL, based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalised Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by WTL. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.
Development Phase means the period before a vehicle type is type approved.
Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.