Stage 10 definition

Stage 10. Monitoring (Oct 25 Indicative))
Stage 10 means construction of TSF Cell 1 raise to 414 mRL;
Stage 10 means construction of the fourth 2.5 metre embankment raise to RL 439 m at TSF2;

Examples of Stage 10 in a sentence

  • To meet the requirements of the Environmental Statement1, BBPT&D prepared a Contaminated Land and Groundwater Strategy2, on behalf of National Grid plc, for the North and Avonmouth Section of the new OHL line between Hinkley Power Station and Seabank Power Station (Stage 10 of the authorised development).

  • Given the site is dry, wash water will be provided by a water truck.

  • The works will be undertaken in Stage 1, Stage 2, Stage 3, Stage 4, Stage 5, Stage 6, Stage 7, Stage 9 and Stage 10 between the hours of 06:00 local time and 18:00 local time Monday until Sunday.Stage 8, Stage 11 and Stage 12 will be conducted as night works (hours to be advised) or such other hours as agreed by Melbourne Airport.

  • Filling in Stage 10 (overfill of Stage 9) began operation in 2012.

  • Signed for and on behalf of /s/ Xxxxxx Xxxxxx LONZA SALES XX Xxxxxx Gander Senior Legal Counsel TITLE /s/ Xxxxxxxxx Xxxxxxxxxxx XXXXXXXXX XXXXXXXXXXX KEY ACCOUNT MANAGER TITLE Signed for and on behalf of /s/ Xxxxxx XxXxxxx KOLLTAN PHARMACEUTICALS, INC President & CEO TITLE Dated 30th March 2012 Re: Schedule 2 Stage 10 - Development Pilot Batch (non-cGMP) at [**] Scale Schedule 3 Price and Payment THIS AMENDMENT No. 4 is made the 13th day of December 2013.

  • The Student Senate may review and discuss a Stage 1.0 budget to the 2007/08 ASCSM Student Senate.

  • Stage 10 shall be complete upon issue of the report of activities.

  • The works will be undertaken in Stage 1, Stage 2, Stage 3, Stage 4, Stage 5, Stage 6, Stage 7, Stage 9 and Stage 10 between the hours of 06:00 local time and 18:00 local time Monday until Sunday.Stage 8 will be conducted as both day and night works (hours to be advised).

  • Stage 10: Analyze risks and costsThis stage calculates and eliminates unnecessary risks and costs.

  • Stage 10: Agreement closeout.The process begins with preliminary discussions between the non-Federal sponsor and DOE/NNSA contractor personnel about the work requested by the sponsor.


More Definitions of Stage 10

Stage 10. Development (some overlap with stage 9) a) Run machine b) Evaluate c) Re-design as required to achieve reliable phase 1 machine d) FMECA review Deliverables; Successful completion of Phase 1 FAT Firm quotation for stages 11 & 12 and 13 - 15

Related to Stage 10

  • Stage 1 means the area at Port Xxxxxxx which is the subject of this Agreement and of the ERMP and which is shown bordered in purple as “stage 1” on Department of Land Administration 4 Miscellaneous Plan No. 1743;

  • Stage 2 means the construction of the second hotel and other developments facilities and amenities referred to in the Development Proposals;

  • Phase 2 means the phase of the ATP comprised of: (1) improvements to the State Street Substation to receive Rebuilt Line 972; (2) the rebuilding of NYSEG’s existing Line 972 not performed in Phase 1; (3) construction of Relocated Line 15; (4) the construction of Bused Line 5; (5) improvements to the Elbridge Substation to receive Relocated Line 15; and (6) improvements to the Elbridge Substation to receive Bused Line 5.

  • Development Phase means the period before a vehicle type is type approved.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Spacecraft (9) means active and passive satellites and space probes.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Subproject means a specific project to be carried out by an existing BE utilizing the proceeds of a Sub-loan or Investment, as hereinafter defined, fulfilling the conditions set forth in Part A of Schedule 4 to this Agreement;

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Phase 3 means the period commencing on the day after the Phase 2 implementation date and ending on the Phase 3 implementation date (as defined below).

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • PSR means the European Union (Payment Services) Regulations 2018 and any law that amends or replaces them. Some Terms and Conditions are written to make clear they apply only if PSR applies to the Account. For example, PSR applies to accounts where the customer uses the account for payment transactions and can place, transfer or withdraw funds without any restriction. We call such accounts PSR regulated;

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Cannabis testing facility means an entity registered by

  • Process weight means the total weight of all materials introduced into any source operation. Solid fuels charged will be considered as part of the process weight, but liquid and gaseous fuels and combustion air will not.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Tare Weight means the weight of an empty shipping container, excluding all materials used for wrapping, cushioning, banding, waterproofing, packaging, blocking and bracing articles within the exterior container.

  • Milestone Schedule means Seller’s milestone schedule, the form of which is attached to this Agreement as Exhibit Q.

  • Completion Period means the period starting from the date of issue of "Order" and required to complete the work in all respect.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Testson Completion means the tests which are specified in the Contractor agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Development Program means the implementation of the development plan.