Examples of Structural Stormwater Control in a sentence
Prior to issuing approval for final occupancy each Permittee shall require that Regulated Projects subject to these Post-Construction Requirements provide verification of ongoing maintenance provisions for Structural Stormwater Control Measures, including but not limited to legal agreements, covenants, CEQA mitigation requirements, and or conditional use permits.
A description of the prioritization process, procedures and criteria used to select the Structural Stormwater Control projects.
The Structural Stormwater Control Program may also include a program designed to implement small-scale projects that are not planned in advance.
Prior to issuing approval for final occupancy the City will require that projects subject to these Post-Construction Requirements provide verification of ongoing maintenance provisions for Structural Stormwater Control Measures, including but not limited to legal agreements, covenants, CEQA mitigation requirements, and or conditional use permits.
Highlight the Property APN which contains the shared Structural Stormwater Control Measures (SCMs), such as a basin.
The Structural Stormwater Control program may also include a program designed to implement small scale projects that are not planned in advance.
Inspections of Structural Stormwater Control MeasuresTo ensure that all stormwater control measures meet the permittee’s performance standards and are being maintained pursuant to the maintenance agreement, the permittee shall develop and implement a written inspection program for structural stormwater controls installed pursuant to the permittee’s post-construction program.
Structural Stormwater Control Measures – Where it has been demonstrated in the Stormwater Control Plans, that the use of Site Design measures listed above, Runoff Reduction measures listed in Performance Requirement No.1, and undisturbed and natural landscape has been maximized to the extent feasible, Structural Stormwater Control Measures designed for water quality treatment and/or flow control shall be used to comply with Performance Requirement No. 3.
Maintenance Agreement and Transfer of Responsibility for SCMs: Prior to issuing approval for final occupancy the owner of the Regulated Project subject to these Post-Construction Requirements shall provide verification of ongoing maintenance provisions for Structural Stormwater Control Measures, including but not limited to legal agreements, covenants, CEQA mitigation requirements, and or conditional use permits.
Information about the Structural Stormwater Control Program shall be updated with each annual report.