Unforeseen Conditions definition

Unforeseen Conditions means any and all covered or otherwise latent or hidden and materially adverse conditions of every kind whatsoever existing on or in the Project Site or on or in any building or structure on the Project Site which were not known to Contractor and were not disclosed in any Scope Documents, or other documents previously furnished to Contractor by HTFC or any other Person. For the avoidance of doubt, and supplementing other provisions of the Contract Documents which make similar reference, Contactor has agreed to assume, and does assume, the risk of all Unforeseen Conditions within the Work Order Price except for Extraordinary Conditions.
Unforeseen Conditions means unanticipated or unexpected circumstances or situations that affect the final price and/or completion time of a contract or project.
Unforeseen Conditions means unanticipated or unexpected circumstances or situations

Examples of Unforeseen Conditions in a sentence

  • Final costs and duration for remediation of the Unforeseen Conditions shall be negotiated and formalized by way of amendment to the Contract.

  • Changes due to Subsurface or Other Unforeseen Conditions, Article 3.4.12.

  • Unforeseen Conditions discovered during the project that affect the negotiated project cost or duration shall be addressed by HHSC in the form of an interim change authorization.

  • Unforeseen Conditions may change the Scope of Work, resulting in a Change Order and an increase cost in time and material.

  • In the event that SRL requests that City approve an amendment to the maximum guaranteed price set forth in said construction contract proposed as a result of Unforeseen Conditions, Force Majeure (as hereinafter defined), a change in market conditions (as validated by Means Guide to Construction Costs), or special conditions required by City that would constitute a change in the scope of work of said construction contract, the parties shall negotiate such amendment in good faith.


More Definitions of Unforeseen Conditions

Unforeseen Conditions means those conditions encountered at the site which are (1) subsurface or otherwise concealed physical conditions which differ materially from those indicated in the contract documents or (2) unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the contract documents.
Unforeseen Conditions means conditions encountered at the Site which are: (1) subsurface or otherwise concealed physical conditions which differ materially from those indicated in the Contract Documents and the reports described in Article 3 and were otherwise unknown or not detected by the Contractor prior to performance of the Work; or (2) unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in the Northeast Ohio area.
Unforeseen Conditions means those conditions which differ materially from what was represented in the Contract Documents or from conditions that would normally be expected to exist and be inherent to the construction activities defined in the Contract Documents.
Unforeseen Conditions is defined in Section 25.4.
Unforeseen Conditions means any and all covered or otherwise latent or hidden and materially adverse conditions existing at, in, on or under the Real Property or any building or structure located on the Real Property before the commencement of the Rehabilitation which: (i) are not actually Known to Seller and (ii) would not have been reasonably foreseeable by a Person experienced in undertaking work of the type involved in the particular location, circumstances, and conditions during the pre-Rehabilitation phase using all appropriate due diligence.
Unforeseen Conditions means concealed or unknown conditions described in § 4.3.4 of the General Conditions to the Construction Contract.
Unforeseen Conditions. Should the CM encounter unforeseen conditions at the Project site materially differing from those shown on the Drawings or indicated in the Specifications or differing materially from those that are reasonably foreseeable or ordinarily encountered and generally recognized as inherent in work of the character provided for in this Agreement, the CM shall immediately, and in no event more than three (3) days later, give notice to the Owner of such conditions before they are disturbed. The Owner and the Designer shall thereupon promptly investigate the conditions and if they find that they materially differ from those shown on the Drawings or indicated in the Specifications, they shall at once make such changes in the Drawings and/or Specifications as they may find necessary. Any increase or decrease in the GMP resulting from such changes shall be adjusted in the manner provided herein for adjustments as to extra and/or additional Work and changes. However, neither the Owner nor the Designer shall be liable or responsible for additional work, costs, or changes to the Work that could have been reasonably determined from any reports, surveys, and analyses made by the CM or made available for the CM’s review or that could have been discovered by the CM through the performance of its obligations pursuant to the Contract Documents.