Unloading Slot definition

Unloading Slot means the period of time during which an LNG Tanker is scheduled to arrive, Unload and leave the berth, which period shall in all cases commence at 12:00 hours and end (a) seventy-eight (78) consecutive hours later for LNG Tankers that load LNG at a port located outside the Mediterranean Sea or (b) fifty-four (54) consecutive hours later for LNG Tankers that load LNG at a port located within the Mediterranean Sea or (c) for Spot Capacity, at the time specified by the Operating Company pursuant to clause 2.3 (e) of chapter II. [“Slot di Discarica” in the Italian text]
Unloading Slot means a slot allocated to a User for the unloading of a Cargo at the Terminal.
Unloading Slot means the period of time during which an LNG Tanker is scheduled to arrive, unload and leave the berth, which period shall in all cases except for to the provision of article II.2.3, commence at 6:00 or 18.00 hours and end (a) eighty-four (84) consecutive hours later for LNG Tankers with a quantity of LNG to be discharged between 65.000 and 152.000 m3 or, (b) after a period lapse between eighty-four (84) and ninety-six (96) consecutive hours, for LNG Tankers with a quantity of LNG to be discharged higher that 152.000 m3 and up to 175.000 m3 or, (c) after a period lapse between ninety-six (96) and one-hundred and twenty (120) consecutive hours for LNG Tankers with an LNG quantity to be discharged higher than 175.000 m3 or, (d) for Spot Capacity at the time specified by the Operating Company pursuant to clause II.2.3(e). The start time of the Unloading Slot and the maximum period within these limits will be published and updated promptly by the Operating Company on the Electronic Communication System.[“Slot di Discarica” in the Italian text]

Examples of Unloading Slot in a sentence

  • Regarding each Unloading Slot on which the Participant intends to make an Offer, the Bid Bond guarantees the signing of the related Capacity Agreement and the delivery of the guarantees referred to in Article 10 of Chapter III of the Regasification Code by the Participant to which Capacity is allocated at the outcome of the auction, in accordance with the provisions of article 2.4.2. of Chapter II of the Regasification Code.

  • The time at the unloading facility is inclusive of unloading time and time taken for pre and post unload activities (Port Unloading Slot) Port Unloading Slots are determined by the Port Operator, and are based on the sustainable capability of the unloading facility.

  • Port Unloading Slot The time at an unloading facility for a Train Service is contained in the relevant Access Agreement.

  • Practically, a System Path includes a Mainline Path that is aligned with a Port Unloading Slot, plus dwells.

  • Aurizon Network will determine the availability of a Port Unloading Slot as part of the process of reviewing a submitted Change Request.

  • Each Annual Unloading Schedule for the Months of April through December is indicative only, and subject to modification pursuant to clause II.3.3. The indication of the Unloading Slot duration, is binding for the User, without prejudice to the provisions of article 2.3.3 below.

  • Notwithstanding the foregoing, in the event that, after Laytime has commenced, Operating Company cancels the corresponding Unloading Slot pursuant to clause 3.7.1 of chapter II, Completion of Unloading, solely for the purpose of determining Demurrage, shall be deemed to have occurred forty-eight (48) hours after such notice has been provided.

  • In order to participate to the auction procedure, the Participant shall provide to the Operating Company at the latest at the time of submission of the Form, a bank guarantee issued by an Approved Guarantor in original and in the form available on the Electronic Communication System or, alternatively, a non-interest bearing security deposit for an amount equal to Euro 250,000.00 (two hundred and fifty thousand) (the "Bid Bond") for each Unloading Slot on which the Participant intends to make the Offer.

  • In the event that the Users who have expressed irreconcilable preferences with respect to the scheduling of the Unloading Slots use the Service for the same total quantity of LNG, expressed in cubic meters, with reference to the entire duration of the relevant Capacity Contract, the Operating Company will schedule the Unloading Slot giving priority to the Users who have been allocated capacity through an Annual Subscription Procedure by draw.

  • The Three (3) Month Schedule shall indicate, for each Month, the number and the duration of Unloading Slots allocated to each User, together with the volume of LNG expected to be Unloaded, and the date of each Unloading Slot scheduled.


More Definitions of Unloading Slot

Unloading Slot means the period of time during which an LNG Tanker is scheduled to arrive,

Related to Unloading Slot

  • Loading Port means the port of Port Hedland or if iron ore is not shipped, or is not shipped from that port, then such port (which may include the port of Port Hedland) as the Minister may determine for the purpose of this definition;

  • Receipt Point means the receipt/inception point(s) where Crude Oil is received into the Gathering System, as such points are specified in Section II of this tariff.

  • Receipt Point(s means the receipt points set forth in Section 6 of this Toll Schedule.

  • Heating oil means petroleum that is No. 1, No. 2, No. 4-light, No. 4-heavy, No. 5-light, No. 5-heavy, and No. 6 technical grades of fuel oil; other residual fuel oils (including Navy Special Fuel Oil and Bunker C); and other fuels when used as substitutes for one of these fuel oils. Heating oil is typically used in the operation of heating equipment, boilers, or furnaces.

  • Wastewater collection system means the sewer and pumping system used for the collection and conveyance of domestic, commercial and industrial wastewater; and

  • Transportation Service means a service for moving people and goods, such as intercity bus service and passenger rail service.

  • Sewage sludge weight means the weight of sewage sludge, in dry U.S. tons, including admixtures such as liming materials or bulking agents. Monitoring frequencies for sewage sludge parameters are based on the reported sludge weight generated in a calendar year (use the most recent calendar year data when the NPDES permit is up for renewal).

  • Storage means any keeping or retention of tangible personal property for use, consumption or

  • Tank means an enclosed space which is formed by the permanent structure of a ship and which is designed for the carriage of liquid in bulk.

  • Building sewer means the extension from the building drain to the public sewer or other place of disposal.