Project Completion Date means the date on which the Completion Certificate is issued;
Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.
Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.
Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;
Substantial Completion Date means the date on which Substantial Completion occurs.
Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:
project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;
Construction Completion Certificate means a certificate of the I-Bank to the effect that the construction of the Project is complete.
Final Completion Date means the date on which Final Completion occurs.
Final Completion Certificate has the meaning set forth in Section 11.6.
Improvement completion assurance means a surety bond, letter of credit,
Inspection Report means the report delivered by the Master Servicer or the Special Servicer, as the case may be, substantially in the form of Exhibit L hereto.
Condition Report means a condition report with respect to a Program Vehicle, signed and dated by the Servicer and a Manufacturer or its agent in accordance with the applicable Manufacturer Program.
Construction Completion means physical construction of a cleanup action component is complete.
Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;
Substantial Completion Certificate means the certificate issued and approved by the Authority indicating the date upon which the Trade Contractor Work (or a designated portion thereof) is Substantially Complete.
Environmental impact statement means a detailed written statement as required by section 102(2)(C) of the Act.
Target Completion Date has the meaning given such term in Section 3.3(b).
Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".
Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:
Project Report means a summary statement of the likely environmental effects of a proposed development referred to in section 58;
Progress Report means the report similar in form and content to that attached hereto as Appendix III.
Root Cause Analysis Report means a report addressing a problem or non-conformance, in order to get to the ‘root cause’ of the problem, which thereby assists in correcting or eliminating the cause, and prevent the problem from recurring.
CMSA Operating Statement Analysis Report means a report substantially in the form of, and containing the information called for in, the downloadable form of the "Operating Statement Analysis Report" available as of the Closing Date on the CMSA Website or in such other form for the presentation of such information and containing such additional information as may from time to time be approved by the CMSA for commercial mortgage-backed securities transactions generally.
Substantial compliance means a level of compliance with these rules where any deficiencies pose no greater risk to resident health or safety than the potential for causing minor harm.
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.