Adjunct / Overload Faculty Sample Clauses

Adjunct / Overload Faculty. A. Regular (overload) faculty will advance at the rate of one (1) step on the Adjunct/ Overload schedules per year of FT experience, with a maximum advancement rate of 1 step per year.
AutoNDA by SimpleDocs

Related to Adjunct / Overload Faculty

  • Overload Teaching Paragraph 1: Overload teaching is that teaching conducted by a full-time classroom teacher teaching daily in a vacant position during his/her planning period.

  • Adjunct Faculty Adjunct faculty shall be eligible for benefits as follows:

  • Overload A regular employee who works an overload in a given year shall receive no less than either:

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Emergency Situations If the condition is an emergency, this will be communicated to the Contractor with the request that corrections are to be accomplished immediately. The Contractor shall respond to the notice in emergency situations within twenty-four hours. If the Contractor fails to respond within this time limit, the Owner may correct the defect and charge the Contractor for the Work. If it is determined the complaint is not the responsibility of the Contractor, the Contractor shall be promptly paid for the cost of the corrective work. The Contractor shall give notice in writing to the Owner when corrections have been completed.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Emergency Situation In the event of an emergency situation beyond our reasonable control, such as an "act of God," war, fire, or natural disaster, services involving your account could be available only in a modified or reduced form or could be entirely unavailable. Unless expressly prohibited by applicable law, you agree that we will have no liability to you for such modification, reduction, or unavailability of services caused by an emergency situation.

  • Seat Belt Use The Recipient agrees to implement Executive Order No. 13043, “Increasing Seat Belt Use in the United States,” April 16, 1997, 23 U.S.C. § 402 note, (62 Fed. Reg. 19217), by:

  • Electrical Provide drawings for the following systems:

Time is Money Join Law Insider Premium to draft better contracts faster.