Air System Dryer. Oil shall be prevented from entering the air dryer desiccant. through dual coalescing filters. A dual air dryer shall be utilized to prevent accumulation of moisture and oil in the air system. The air dryer system shall include a replaceable desiccant bed, electrically heated drain, and activation device. The air dryer heater shall function only below 40°F ambient temperatures. A 2M/3M mechanic shall replace the desiccant in less than 15 minutes. A provision shall be included to collect/remove oil from the air system to prevent affecting function and/or damaging pneumatic system components. Discharge compressed air temperature entering the dryer may not exceed the maximum temperature allowed by the air dryer manufacturer at ambient temperatures up to 100°F.

Related to Air System Dryer

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • System Use (a) An electronic site access system may be used on site, subject to the requirements of this statement. (b) The system operates via: (i) a facial recognition device; and (ii) an electronic gate. (c) The system will be installed at the access and egress point/s of the site and will only be utilised to identify presence on site. (d) The purpose for which the electronic site access system will be implemented is to ensure: (i) avoiding unauthorised access to site; (ii) confirmation and co-ordination of effort in emergency situations; and (iii) confirmation that all entrants to site have received a site specific induction; (e) The only personal data collected by the system is a site entrant’s: (i) image; (ii) first & last name; (iii) mobile phone number; (iv) email address; and (v) employer’s name. (the Collected Data) (f) The Collected Data will only be held or used for the purposes specified above, unless otherwise by consent or required by law. (g) The Employer will not use the electronic site access control system to verify who was on a site at a particular time for the purpose of: (i) evaluating whether a variation claim regarding labour costs made by a subcontractor can be substantiated; (ii) taking disciplinary action against an Employee, or assisting a subcontractor to take disciplinary action against its own employees, regarding their start and finish times; or (iii) otherwise generally tracking a worker’s movements whilst on the site.

  • System Access CUSTOMER agrees to provide to PROVIDER, at CUSTOMER’S expense, necessary access to the mainframe computer and related information technology systems (the “System”) on which CUSTOMER data is processed during the times (the “Service Hours”) specified in the PSAs, subject to reasonable downtime for utility outages, maintenance, performance difficulties and the like. In the event of a change in the Service Hours, CUSTOMER will provide PROVIDER with at least fifteen (15) calendar days written notice of such change.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.