Airport Layout Plan Drawing Sample Clauses

Airport Layout Plan Drawing. The engineer will update the electronic versions of the Airport Layout Plan drawing which is identified as Sheet 3 of the Airport Layout Plan drawing set. The engineer will update the drawing to reflect the actual work accomplished by the project.
AutoNDA by SimpleDocs
Airport Layout Plan Drawing. Description: Following the Recommended Airport Master Plan Concept developed under the preceding elements and FAA AC 150/5070‐6B, an ALP drawing for the airport will be prepared. The ALP will reflect updated physical features, location of airfield facilities (runways, taxiways, navigational aids), and existing landside development. Development of recommended landside and airfield facilities, including runways and taxiways; property and runway protection zone boundaries; and revenue support areas will also be shown. Guidelines for the preparation of an airport layout plan as defined by the FAA Airports ARP SOP 2.00 Standard Procedure for FAA Review and Approval of Airport Layout Plans (October 1, 2013) will be followed. A Title Sheet and Airport Data Sheet will also be prepared and included with the full Airport Layout Plan set. Responsibilities: Consultant: Prepare a new ALP for the airport. Sponsor: Review and comment. Product: A new ALP drawing for the airport which meets federal guidelines. Task 9.2 Terminal Area Drawing(s) Description: Prepare Terminal Area Drawing(s) reflecting development resulting from the recommenda‐ tions of this study. Depending on the future recommended development for the general aviation areas, more than one drawing may be required to adequately reflect the detail of development within the area. The drawing(s) will include detailed planning level information such as access taxiways, apron areas, hangar layouts, aircraft tie‐down areas, customer and employee parking areas, and vehicular circulation and access for the short, intermediate, and long‐term planning periods. Responsibilities: Consultant: Prepare Terminal Area Drawing(s). Sponsor: Review and comment. Product: Terminal Area Drawing(s) reflecting the selected development alternative for these facilities at the airport. Task 9.3 Part 77, Approach and Inner Approach Surface Plans Description: Prepare Part 77, Approach and Inner Approach Surface plans in conformance with FAR Part 77 and FAA Airports ARP SOP 2.00 Standard Procedure for FAA Review and Approval of Airport Layout Plans (October 1, 2013). As necessary, height of potential obstructions will be researched and identified on the drawing along with an obstruction chart/table indicating the obstruction description, their top elevation, affected Part 77 surface, the penetration, and disposition or corrective action to eliminate or mitigate the obstruction. Responsibilities:

Related to Airport Layout Plan Drawing

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!