Applications for EASA Design Approval Sample Clauses

Applications for EASA Design Approval. (a) All applications for EASA design approval from applicants in the United States shall follow the following procedure. (1) The applicant shall: (i) Complete the EASA form appropriate to the design approval requested (see EASA website) and, (ii) Forward the EASA form for each individual design approval to the FAA plus the applicable technical data package (See paragraphs 2.1.2, 2.2.3, and 2.5.2). (2) EASA shall: (i) Review the application package to determine if it is within the scope of these Implementation Procedures.
AutoNDA by SimpleDocs
Applications for EASA Design Approval. (a) All applications for EASA design approval from applicants in the United States shall follow the following procedure. (1) The applicant shall: (i) Complete the EASA form appropriate to the design approval requested (see EASA website) and, (ii) Forward the EASA form for each individual design approval to the FAA plus the applicable technical data package (See paragraphs 2.1.2, 2.2.3, and 2.5.2). (2) EASA shall: (2) The FAA shall: (i) Review the application package to determine if it is within the scope of these Implementation Procedures. (i) Review the application package to determine if it is within the scope of these Implementation Procedures. (ii) Forward the application plus the applicable data along with an EASA cover letter to the appropriate FAA office (See Appendix A). Where electronic data is submitted, it must be in a format that is compatible with FAA’s information (ii) Forward the application plus the applicable data along with an FAA cover letter to EASA via email. (See Appendix A or EASA website for applicable EASA office). Where electronic data is submitted, it must be in a format that is compatible with EASA’s information systems and there must be an systems and there must be an arrangement between the applicant and the EASA under arrangement between the applicant and the FAA under paragraph 2.10.1. paragraph 2.10.2. (3) Upon receipt of the FAA cover letter and application form, EASA shall: (i) Notify the applicant of acceptance and identify a technical focal point contact for further communication.
Applications for EASA Design Approval. (a) All applications for EASA design approval from applicants in the United States shall follow the following procedure. (1) The applicant shall: (i) Complete the EASA form appropriate to the design approval requested (see EASA website) and, (ii) Forward the EASA form for each individual design approval to the FAA plus the applicable technical data package (See paragraphs 2.1.2, 2.2.3, and 2.5.2). (2) EASA shall: (i) Review the application package to determine if it is within the scope of these Implementation Procedures. (ii) Forward the application plus the applicable data along with an EASA cover letter to the appropriate FAA office (See Appendix A). Where electronic data is submitted, it must be in a format that is compatible with FAA’s information systems and there must be an arrangement between the applicant and the EASA under paragraph 2.10.2.

Related to Applications for EASA Design Approval

  • Application for approval 3.1. The application for approval of a vehicle type with regard to the AEBS shall be submitted by the vehicle manufacturer or by his authorised representative. 3.2. It shall be accompanied by the documents mentioned below in triplicate: 3.2.1. A description of the vehicle type with regard to the items mentioned in paragraph 2.4., together with a documentation package which gives access to the basic design of the AEBS and the means by which it is linked to other vehicle systems or by which it directly controls output variables. The numbers and/or symbols identifying the vehicle type shall be specified. 3.3. A vehicle representative of the vehicle type to be approved shall be submitted to the Technical Service conducting the approval tests.

  • Solicitations for Subcontracts, Including Procurement of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the Local Government for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential subcontractor or supplier will be notified by the Local Government of the Local Government’s obligations under this Agreement and the Acts and Regulations relative to Nondiscrimination on the grounds of race, color, or national origin.

  • New Application for Licensure Any time after the three-month period has lapsed from the Effective Date of this Agreement and Respondent has paid the Administrative Penalty set forth in Section III, Paragraph 1 of this Order, Respondent may apply for a new mortgage loan originator license or, as applicable, petition for the reinstatement of an MLO Activity Endorsement in any or all of the Participating States with the understanding that each State Mortgage Regulator reserves the rights to fully investigate such application for licensure or petition for reinstatement of an MLO Activity Endorsement and may either approve or deny such application or petition pursuant to the normal process for such licensing or endorsement investigations. No license application or petition described in this paragraph will be denied solely based on the facts, circumstances, or consensual resolution provided for in this Agreement. Respondent further agrees that Respondent must satisfy the Administrative Penalty provision prior to submitting an application for a new mortgage loan originator license or, as applicable, petition for the reinstatement of an MLO Activity Endorsement.

  • Applications for Payment 9.3.1 At least ten days before the date for each progress payment established in the State- Contractor Agreement, the Contractor shall submit to the Architect an itemized Application for Payment, notarized if required, supported by such data substantiating the Contractor's right to payment as the State or the Architect may require. The application for payment must, at a minimum, reflect retainage and the required waivers of lien and any other support documentation enumerated elsewhere in the Contract Documents. 9.3.2 Unless otherwise provided in the Contract Documents, payments will be made on account of materials or equipment not incorporated in the Work but delivered and suitably stored at the site and, if approved in advance by the State, payments may similarly be made for materials or equipment suitably stored at some other location agreed upon in writing. Payments for materials or equipment stored on or off the site shall be conditioned upon submission by the Contractor of bills of sale or such other procedures satisfactory to the State to establish the State's title to such materials or equipment or otherwise protect the State's interest, including applicable insurance and transportation to the site for those materials and equipment stored off the site. 9.3.3 The Contractor warrants that title to all Work, materials and equipment covered by an Application for Payment will pass to the State either by incorporation in the construction or upon the receipt of payment by the Contractor, whichever occurs first, free and clear of all liens, claims, security interests or encumbrances, hereinafter referred to in this Article 9 as "liens"; and that no Work, materials or equipment covered by an Application for Payment will have been acquired by the Contractor, or by any other person performing Work at the site or furnishing materials and equipment for the Project, subject to an agreement under which an interest therein or an encumbrance thereon is retained by the seller or otherwise imposed by the Contractor or such other person.

  • Solicitations for Subcontracts, Including Procurements of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the Engineer for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Engineer of the Engineer's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.

  • Requirements for E- Bidders 3.1. For Individual/ Joint E-Bidders, the following documents shall be uploaded during online registration; 3.1.1. Copy of Identification Documents (both sides) 3.1.2. Evidence of deposit payment 3.2. For Agent acting for Individual/ Joint Online Bidders, the following documents shall be uploaded during online registration; 3.2.1. Copy of Identification Documents (both sides) of Individual/ Joint Online Bidder 3.2.2. Copy of Identification Documents (both sides) of Agent 3.2.3. Copy of letter of authorization to bid 3.2.4. Evidence of deposit payment 3.3. For Company, the following documents shall be uploaded during online registration: 3.3.1. Copy of Identification Documents (both sides) of the representative. 3.3.2. Copy of letter of authorization to bid under the Company’s Letter Head 3.3.3. Form 24; Form 44; Form 49 (or their equivalent forms under the Companies Act 2016)

  • Solicitations for Subcontracts Including Procurements of Materials and Equipment. In all solicitations either by competitive bidding or negotiation made by the Engineer for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor/subconsultant or supplier shall be notified by the Engineer of the Engineer's obligations under this Contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.

  • Motions for Directions (1) Class Counsel or the Settling Defendants may apply to the Ontario Court and/or such other courts as may be required by the Courts for directions in respect of the interpretation, implementation and administration of this Settlement Agreement. Unless the Courts order otherwise, motions for directions that do not relate specifically to the matters affecting the Quebec Action shall be determined by the Ontario Court. (2) All motions contemplated by this Settlement Agreement shall be on notice to the Parties.

  • REQUESTS FOR FLEXIBLE WORKING ARRANGEMENTS 49.1 Employee may request change in working arrangements s.65 of the Act. Note 1: Section 65 of the Act provides for certain Employees to request a change in their working arrangements because of their circumstances, as set out in s.65(1A).

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!