Grading The coarse aggregate as delivered to the mixer, shall be well graded as per IS specifications. Maximum size of aggregate used for the work shall be 20mm or 40mm or as specified in items in the bill of quantities and it shall confirm to IS: 383-1970, clause 4.2 (Table-2) However, the exact gradation required to produce a dense concrete of specified strength and desired workability shall be decided as per laboratory test by the Engineer. Coarse aggregate for use in concrete shall be well graded and shall conform to IS: 383-1970 requirements (as per Table-II) given below: IS sieve Designation Percentage Passing by weight for graded aggregate of nominal size. 40mm 20mm 16mm 12.5mm 63mm 100 - - - 40mm 00-000 000 - - 20mm 00-00 00-000 100 - 16mm - - 00-000 000 12.5 - - - 90-100 10.00 00-00 00-00 00-00 00-00 4.75mm 0-5 0-10 0-10 0-10
System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.
Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.
No Installing Generator Not to install or keep or run any generator in the Said Apartment.
FABRICATION Making up data or results and recording or reporting them.
Illumination The Engineer shall refer to TxDOT’s Highway Illumination Manual and other deemed necessary State approved manuals for design of continuous lighting and safety lighting for all conventional, high-mast, and underpass lighting. The Engineer shall include safety lighting as part of each design on each flashing beacon and traffic signal. The Engineer shall provide a preliminary layout for initial review and approval by the State. The Engineer shall prepare circuit wiring diagrams showing the number of luminaries on each circuit, electrical conductors, length of runs, service pole assemblies. Underpass lighting must be used on all structures within each project. The Engineer shall integrate existing illumination within the project limits into the proposed design. The Engineer shall coordinate with the State to determine the location of proposed high- mast, conventional, and underpass lighting.
CONTRACTOR PORTABLE DEVICES Contractor shall not place Data on any portable Device unless Device is located and remains within Contractor’s CONUS Data Center. For Authorized Users subject to ITS policies, the Data, and/or the portable device containing the Data, shall be destroyed in accordance with applicable ITS destruction policies (ITS Policy S13-003 Sanitization/Secure Disposal and S14-003 Information Security Controls or successor) when the Contractor is no longer contractually required to store the Data. TRANSFERRING OF DATA General Except as required for reliability, performance, security, or availability of the services, the Contractor will not transfer Data unless directed to do so in writing by the Authorized User. All Data shall remain in CONUS. At the request of the Authorized User, the Contractor will provide the services required to transfer Data from existing Databases to physical storage devices, to facilitate movement of large volumes of Data. The Authorized User may require several Cloud providers to share or transfer Data for a period of time. This will be provided for in the Authorized User Agreement or shall be assumed to be limited to a six month duration. Transfer of Data at End of Contract and/or Authorized User Agreement Term At the end of the Contract and/or Authorized User Agreement term, Contractor may be required to facilitate transfer of Data to a new Contractor. This transfer must be carried out as specified by the Authorized User in the Authorized User Agreement. Transfer of Data; Charges Contractor cannot charge for the transfer of Data unless the charges are provided for in response to an Authorized User RFQ. Transfer of Data; Contract Breach or Termination Notwithstanding Section 3.6.3, in the case of Contract breach or termination for cause of the Contract, all expenses for the transfer of Data shall be the responsibility of the Contractor.
Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:
Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.
Reactivation To reactivate suspended Service, you must bring your account current through the month of reactivation by making payment in full of any outstanding balance, fees and other applicable charges. In addition, we may require a deposit before reactivating your Service. The amount of the deposit will not exceed one year of monthly fees. Any amounts deposited by you will appear on your statement as a credit, and service charges and other fees will be invoiced as described above. If you fail to pay any amount on a subsequent xxxx, the unpaid amount will be deducted each billing cycle from the credit amount. Credit amounts will not earn or accrue interest.