Capacity Management Requirements Sample Clauses

Capacity Management Requirements. Requirement 259 The Contractor shall manage System capacity and performance as described in the System Capacity Management Plan. 260 The Contractor shall perform capacity testing using the capacity test environment with a full copy of current production Data when changes are made to the System that could affect System capacity. 261 At a minimum, the Contractor shall perform annual capacity testing using the capacity test environment with a full copy of current production Data. 262 The System shall include at least one (1) Food and Cash EBT capacity test System loaded with the current version of the production Software and with the capability to accommodate all production Data. 263 The Contractor shall provide the State with read access to the Food and Cash EBT capacity test System through the Food and Cash EBT administrative application. 264 The System shall include at least one (1) eWIC EBT capacity test System loaded with the current version of the production Software and with the capability to accommodate all production Data. 265 The Contractor shall provide the State with read access to the eWIC EBT capacity test System through the eWIC EBT administrative application. 266 The Contractor shall complete capacity testing of the Food and Cash EBT Subsystem prior to Cutover. 267 The Contractor shall complete capacity testing of the eWIC EBT Subsystem using simulated data that represents estimated statewide volumes prior to the start of the eWIC EBT Pilot Operations. 268 At a minimum, the Contractor shall perform capacity testing of the eWIC EBT Subsystem using production and simulated data every six (6) months, or more often as required by the State, during statewide rollout of eWIC EBT to Local Agencies. 269 The Contractor shall provide System Capacity Test Results within ten (10) Business Days following the completion of capacity testing in accordance with the Deliverable Specification.
AutoNDA by SimpleDocs

Related to Capacity Management Requirements

  • Management Requirements Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements:

  • Procurement Requirements The below listed provisions of State Procurement requirements shall be complied with throughout the contract period:

  • Agreement Requirements This agreement will be issued to cover the Janitorial Service requirements for all State Agencies and shall be accessible to any School District, Political Subdivision, or Volunteer Fire Company.

  • Equipment Requirements No Equipment is provided to Customer as part of this Service.

  • Project Requirements Failure to comply with the following requirements will result in a suspension of all other operations:

  • Development Requirements The exterior wall standards set forth in this section shall apply to the structures located on the Property. At least ninety percent (90%) of the combined exterior surface area of all walls, including all stories of buildings / structures, shall consist of stone, brick, painted or tinted stucco, and factory tinted (not painted) split faced concrete masonry unit or similar material approved by the Director of Planning.

  • Divestment Requirements 34.1.1 Upon Termination, the Concessionaire shall comply with and conform to the following Divestment Requirements:

  • PJM Requirements The DS Supplier acknowledges and agrees that, as a member of PJM, the Company is bound by all PJM operating instructions, policies and procedures as are currently set forth in the PJM Operating Manual, which are available through the Internet on the PJM Home Page (xxxx://xxx.xxx.xxx), as may be revised from time to time, which are needed to maintain the integrity of the PJM system. The DS Supplier acknowledges and agrees that it will cooperate with the Company so that the Company will be in compliance with all PJM Emergency Operations Procedures, which include, but are not limited to, those procedures pertaining to minimum and maximum generation Emergencies, and measures requiring involuntary Customer participation, such as supply voltage reduction or full interruption of Customer load by either manual or automatic means.

  • Maintenance Requirements The Contractor shall ensure and procure that at all times during the Maintenance Period, the Project Highway conforms to the maintenance requirements set forth in Schedule-E (the “Maintenance Requirements”).

  • Space Requirements The Construction Administrator will conduct a review of the adequacy of space allotments for maintenance of mechanical, telephone, and fire protection equipment.

Time is Money Join Law Insider Premium to draft better contracts faster.