CLEANING AND DISPOSAL OF MATERIALS FROM WASH BAY GRIT TRAPS Sample Clauses

CLEANING AND DISPOSAL OF MATERIALS FROM WASH BAY GRIT TRAPS. 3C.7.1 Contractor shall provide, monthly as part of Basic Services, a complete evacuation of solids and liquids from grit traps located in wash bays, or more as needed, in accordance with applicable laws and regulations. SUBSECTION 3D - FUEL MANAGEMENT SYSTEM
AutoNDA by SimpleDocs

Related to CLEANING AND DISPOSAL OF MATERIALS FROM WASH BAY GRIT TRAPS

  • GARBAGE DISPOSAL, RECYCLING, AND BIODEGRADABLE MATERIALS A. Concessionaire shall be responsible for maintaining the cleanliness of the Concession Premises. Concessionaire shall ensure placement of all garbage and trash generated by the Concession Operation in designated containers and that said containers are emptied daily, or as more frequently required by Department, at a location within the Area designated by Department. Disposal costs from this latter location shall be borne by Department. Concessionaire shall provide such additional trash containers as may be required to keep the immediate Concession Premises clean at all times. The type of trash containers provided by Concessionaire shall be approved by Department prior to use.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • DISPOSAL OF WASTE MATERIAL Purchaser may sidecast waste material on side slopes up to 45% if the waste material is compacted and free of organic debris. On side slopes greater than 45%, all waste material must be end hauled or pushed to the designated embankment sites and waste areas identified in Clause 0-00 XXXXX XXXX XXXXXXXX.

  • LIMITATIONS ON REVERSE ENGINEERING, DECOMPILATION AND DISASSEMBLY You may not reverse engineer, decompile, or disassemble the Software, except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation.

  • Slash Disposal Purchaser’s timing of product removal and preparatory work shall not unnecessarily xx- xxx slash disposal. Specific slash disposal measures to be employed by Purchaser are stated in C6.7 and are in ad- dition to Required Deposits for slash disposal.

  • Archival Back-Up and Disaster Recovery Licensee may use and copy the Product and related Documentation in connection with: i) reproducing a reasonable number of copies of the Product for archival backup and disaster recovery procedures in the event of destruction or corruption of the Product or disasters or emergencies which require Licensee to restore backup(s) or to initiate disaster recovery procedures for its platform or operating systems; ii) reproducing a reasonable number of copies of the Product and related Documentation for cold site storage. “Cold Site” storage shall be defined as a restorable back-up copy of the Product not to be installed until and after the declaration by the Licensee of a disaster; iii) reproducing a back-up copy of the Product to run for a reasonable period of time in conjunction with a documented consolidation or transfer otherwise allowed herein. “Disaster Recovery” shall be defined as the installation and storage of Product in ready-to-execute, back-up computer systems prior to disaster or breakdown which is not used for active production or development.

  • Garbage Disposal You are responsible for ensuring Your and Your guests’ rubbish is removed from the Room, Building and Common Property in a timely manner and properly deposited in the communal rubbish areas allocated by Us for collection. You must use all garbage chutes according to pasted instructions near chutes.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Retention and disposal 9.5.1. Information shared under this Agreement will be securely stored and disposed by secure means when no longer required for the purpose for which it is provided as per each parties’ Information Security Policy, unless otherwise agreed in a specific case, and legally permitted. Each party will determine and maintain their own retention schedule.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

Time is Money Join Law Insider Premium to draft better contracts faster.