Compaction and Rutting Sample Clauses

Compaction and Rutting. A. Unless the Landowner opts to do the restoration work, after the topsoil has been replaced, all areas that were traversed by vehicles and Construction and/or Deconstruction equipment will be ripped at least 18 inches deep, and all pasture and woodland will be ripped at least 12 inches deep to the extent practicable. The existence of tile lines or underground utilities may necessitate less depth. The disturbed area will then be disked. Decompaction shall be conducted according to the guidelines provided in Appendices A and B.
AutoNDA by SimpleDocs
Compaction and Rutting. The Company will rip or pay to rip all areas within the ROW that were traversed by vehicles and/or construction equipment according to the following, unless otherwise stated in an Underlying Agreement between the Company and the Landowner: cropland shall be ripped to a depth of 18-inches, pasture land shall be ripped at least 16-inches deep, and woodland shall be ripped at least 12-inches deep if stumps were removed from the ROW during clearing/grading activities. The existence of tile lines, underground utilities, or shallow topsoil and subsoil horizons may necessitate less depth. Decompaction shall be conducted according to the guidelines provided in Appendices A and B. When done correctly, with the proper equipment and soil conditions, ripping across any Agricultural Land should only take one pass. Additional passes should only be conducted with Landowner’s approval and if the previous pass did not sufficiently shatter the soil and is not precluded by the Landowner’s Underlying Agreement. Decompaction of compacted ROW topsoil shall occur after the replacement of topsoil, importing of topsoil (if needed), and land leveling to return the ROW to pre-construction contours. The entire ripped area may then be disced in preparation for seeding, if necessary; however, any additional tracking/driving on the ROW after decompaction activities risks re-compacting or rutting the area. The Company shall use its Best Efforts to restore all compacted or rutted land as a result of the Pipeline Project to its pre-construction condition, in compliance with local, state, and federal regulations. All ripping and discing shall be done at a time when the soil is dry enough for normal tillage operations to occur on undisturbed farmland adjacent to the areas to be ripped or disced. If there is a dispute between the Landowner and the Company with regard to compaction, rutting, which areas need to be ripped, or the depth at which ripping should occur, the Landowner and the Company shall consult the local SWCD.

Related to Compaction and Rutting

  • Compaction 11.1 Concrete shall be thoroughly compacted and fully worked around the reinforcement, around embedded fixtures and into corners of the formwork.

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • SUBGRADE COMPACTION Purchaser shall compact constructed and reconstructed subgrades in accordance with the Compaction List by routing equipment over the entire width, except ditch. Purchaser shall obtain written approval from the Contract Administrator for subgrade compaction before placement of rock.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Compaction of surfaces 5 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density. m2 96

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Fencing The SPD shall Fence the demarcated boundary of the Demised Premises at the SPD’s own expense in every respect.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!