Conduct Topographic Survey Sample Clauses

Conduct Topographic Survey. BKF will complete topographic field surveying as part of this task to support the development of the design and to confirm the elevation of existing grades at the Project site. Field survey will also collect monument information that will be used to accurately map out existing right-of-way. Topographic survey will be used to create a base existing aerial mapping that will be used as a base for the project design BKF will compile field survey and obtained information in order to prepare a base sheet that will be used for the Project. The base sheets will be coordinated with the entire Project team.
AutoNDA by SimpleDocs
Conduct Topographic Survey i. Design Topography Survey for the project will include field location of all topographic elements determined critical to the design. Low opening and garage floor elevations will be included. Utilities will be shown as marked by Missouri One- Call locators, and supplemented with available mapping. ii. Flow lines and pipe size and material on all storm and sanitary sewer pipes and structures located within the survey limits. iii. Survey limits will be along the existing channel from 500 feet upstream of Xxxx Road to 500 feet downstream of Xxxx Road. On the east side of Xxxx Road, survey will generally extend from the residences along the north side of the channel to approximately 50 feet south of the channel. On the west side of Ward Road, survey will extend from the north bank of the channel south to the rear lot lines of existing residential lots. Xxxx Road will be surveyed to connect to the limits on each end, and survey limits will be widened adjacent to Xxxx Road to ensure adequate survey to tie in grading at Xxxx Road. The enclosed system will be surveyed from the outfall north approximately 350 feet to an existing open channel, including a 30’ ground strip centered on the enclosed pipe along the entire length.

Related to Conduct Topographic Survey

  • Adverse Weather Shall be only weather that satisfies all of the following conditions: (1) unusually severe precipitation, sleet, snow, hail, or extreme temperature or air conditions in excess of the norm for the location and time of year it occurred based on the closest weather station data averaged over the past five years, (2) that is unanticipated and would cause unsafe work conditions and/or is unsuitable for scheduled work that should not be performed during inclement weather (i.e., exterior finishes), and (3) at the Project.

  • Survey Buyer may obtain a survey of the Property before the Closing to assure that there are no defects, encroachments, overlaps, boundary line or acreage disputes, or other such matters, that would be disclosed by a survey ("Survey Problems"). The cost of the survey shall be paid by the Buyer. Not later than business days prior to the Closing, Buyer shall notify Seller of any Survey Problems which shall be deemed to be a defect in the title to the Property. Seller shall be required to remedy such defects within business days and prior to the Closing. If Seller does not or cannot remedy any such defect(s), Buyer shall have the option of canceling this Agreement, in which case the Xxxxxxx Money shall be returned to Buyer.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!