Construction Waste Management Plan Sample Clauses

Construction Waste Management Plan. Spill Prevention, Control and Countermeasures Plan (SPCC); and
AutoNDA by SimpleDocs
Construction Waste Management Plan. This section of the Construction Waste Management Plan shall include the following:
Construction Waste Management Plan. This section of the Construction Waste Management Plan shall include the following: 3.2.1. Introduction 3.2.2. Waste types 3.2.3. Waste management requirements 3.2.4. Waste disposal requirements 3.2.5. Waste minimization 3.2.6. Required tables and appendices
Construction Waste Management Plan. The Demolition Contractor shall develop a Construction Waste Management Plan consistent with the requirements of the Contract Documents and within the requirements of the U.S. Green Building Council; such Construction Waste Management Plan to include (1) all waste separation, preservation, recycling, and containment tasks, methods and procedures, (2) identification of the types and quantities of demolition, site-clearing and construction waste generated by the Demolition Work, (3) determination of whether such waste materials will be salvaged, recycled or disposed of in a landfill or incinerator, and, (4) all required demolition plan documents, credentials, licenses and permits, as set forth in the plans and specifications. The Construction Waste Management Plan shall be provided prior to issuance of a notice to Proceed to the Demolition Contractor by the Owner.
Construction Waste Management Plan. Periodic and final summary report of waste materials recycled, salvaged and sent to the landfill
Construction Waste Management Plan. A. Draft Waste Management Plan: Prior to the Pre-Construction Conference, or prior to any waste removal, whichever occurs sooner, the Contractor shall meet with the Owner designated representative(s) and Architect to discuss preparation of a Draft Waste Management Plan. The Draft Plan shall contain the following: 1. Analysis of the proposed jobsite waste to be generated. Include the types of material to be generated and estimated quantity of each material (in tons).

Related to Construction Waste Management Plan

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Waste Management o Participate in recycling using the Harvard Recycles receptacles provided. Recyclable materials include paper, cardboard, glass bottles, cans, plastics 1-7, as well as fluorescent light bulbs, batteries, chemicals, cartridges and electronics. o Designate a space for employees to leave surplus or shared office supplies to reduce redundant purchases. o Arrange for surplus furniture and other large office items to be delivered to Harvard’s Recycling and Surplus Center for reuse. Occupant Education and Engagement o Install or enable software that powers down computers when not in use, and ensure that all computer monitors have a “sleep mode” enabled. o Ensure that every employee has a power strip and turns the strip with an “off” switch for electronic devices. o Encourage staff to use task lighting that accommodates fluorescent bulbs, rather than halogen lamps. o Provide mugs or encourage staff to bring their own reusable mugs, plates, and utensils for the kitchen area. Keep the kitchen area stocked with dish cleaning supplies if a dishwasher is not available. o Start a physical or electronic bulletin board for “green tips”, news, and ideas. o Ask the Property Manager for training to properly operate controls, including shades, lights, thermostats, etc. o Advise employees to dress appropriately for the weather as building temperatures will be set at the lowest or highest end of the ASHRAE standard range depending on the outside temperature.

  • SITE MANAGEMENT We reserve the right, but not the obligation, to: (1) monitor the Site for violations of these Terms of Use; (2) take appropriate legal action against anyone who, in our sole discretion, violates the law or these Terms of Use, including without limitation, reporting such user to law enforcement authorities; (3) in our sole discretion and without limitation, refuse, restrict access to, limit the availability of, or disable (to the extent technologically feasible) any of your Contributions or any portion thereof; (4) in our sole discretion and without limitation, notice, or liability, to remove from the Site or otherwise disable all files and content that are excessive in size or are in any way burdensome to our systems; and (5) otherwise manage the Site in a manner designed to protect our rights and property and to facilitate the proper functioning of the Site.

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Construction Plans Tenant shall prepare final plans and specifications for the Tenant Improvements that (a) are consistent with and are logical evolutions of the Approved Schematic Plans and (b) incorporate any other Tenant-requested (and Landlord-approved) Changes (as defined below). As soon as such final plans and specifications ("Construction Plans") are completed, Tenant shall deliver the same to Landlord for Landlord's approval, which approval shall not be unreasonably withheld, conditioned or delayed. All such Construction Plans shall be submitted by Tenant to Landlord in electronic .pdf, CADD and full-size hard copy formats, and shall be approved or disapproved by Landlord within ten (10) business days after delivery to Landlord. Landlord's failure to respond within such ten (10) business day period shall be deemed approval by Landlord. If the Construction Plans are disapproved by Landlord, then Landlord shall notify Tenant in writing of its objections to such Construction Plans, and the parties shall confer and negotiate in good faith to reach agreement on the Construction Plans. Promptly after the Construction Plans are approved by Landlord and Tenant, two (2) copies of such Construction Plans shall be initialed and dated by Landlord and Tenant, and Tenant shall promptly submit such Construction Plans to all appropriate Governmental Authorities for approval. The Construction Plans so approved, and all change orders approved (to the extent required) by Landlord, are referred to herein as the "Approved Plans."

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5

  • Health and Safety Plan Consultant shall prepare and submit a Health and Safety Plan (“HASP”) for the portion of Consultant’s work that will involve field work, assessments, or investigations of certain Project elements. The HASP shall describe how Consultant plans to complete field work, assessments, and/or investigations at the RWF. Consultant’s HASP must comply with the CIP HASP and shall be updated as new conditions are encountered.

  • Transportation Management Tenant shall fully comply with all present or future programs intended to manage parking, transportation or traffic in and around the Building, and in connection therewith, Tenant shall take responsible action for the transportation planning and management of all employees located at the Premises by working directly with Landlord, any governmental transportation management organization or any other transportation-related committees or entities.

  • Patch Management All workstations, laptops and other systems that process and/or 20 store PHI COUNTY discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or 21 transmits on behalf of COUNTY must have critical security patches applied, with system reboot if 22 necessary. There must be a documented patch management process which determines installation 23 timeframe based on risk assessment and vendor recommendations. At a maximum, all applicable 24 patches must be installed within thirty (30) calendar or business days of vendor release. Applications 25 and systems that cannot be patched due to operational reasons must have compensatory controls 26 implemented to minimize risk, where possible.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!