Criterion Scoring Rubrics. The Summative score, including the student growth impact rating, must be determined by an analysis of evidence and artifacts. This analysis will be based on a holistic assessment of the teacher’s performance over the course of the year. A preponderance of the evidence will be used to develop the overall criterion scores. No scores will be given to individual components. Employees will be encouraged to use the Evidence Menu as a guide. Criterion scores will be added to reach a Summative score. The OSPI approved Summative scoring band is shown below. OSPI Approved Summative Scoring Band 1 Unsatisfactory 2 Basic 3 Proficient 4 Distinguished
AutoNDA by SimpleDocs
Criterion Scoring Rubrics. The Summative score, including the student growth impact rating, must be determined by an analysis of evidence and artifacts. This analysis will be based on a holistic assessment of the teacher’s performance over the course of the year. A preponderance of the evidence will be used to develop the overall criterion scores. Criterion scores will be added to reach a Summative score.

Related to Criterion Scoring Rubrics

  • Trunk Forecasting Requirements 14.2.1 Initial trunk forecast requirements. At least ninety (90) days before initiating interconnection in a LATA, Alltel shall provide Verizon a two (2)-year traffic forecast that complies with the Verizon Interconnection Trunking Forecast Guide, as revised from time to time. This initial traffic forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Interconnection Trunk groups in the LATA over the next eight (8) quarters.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.