Define Project Limits and Analysis Methodology Sample Clauses

Define Project Limits and Analysis Methodology. KAI shall collaborate with County staff to determine the ultimate study area and facilities to be analyzed, and develop the methodology for the traffic analysis. The study shall evaluate the roadways and intersections along Missouri Flat between the El Xxxxxx Xxxx xxx Xxxxxxxx Xxxxxx Xxxx, Xxxxx Xxxxx 00 between Lockie Road and Pleasant Valley Road, Mother Lode Drive between Missouri Flat and Pleasant Valley Road, Xxxxx Road between Missouri Flat and Pleasant Valley Road, and El Dorado Road interchange with US Highway 50. Consultant shall also analyze operations and safety along US Highway 50 between El Dorado Road and Xxxxx Road/Placerville Drive. KAI shall prepare an analysis methodology memorandum outlining the study area, analysis methodology, procedures and assumptions. The traffic analysis shall primarily be based on the most recent version of County’s Transportation Impact Study Guidelines. The purpose of this memorandum is to gain consensus prior to performing traffic forecasting and analysis. The methodology memorandum shall serve as a blueprint for the traffic related tasks and shall serve to eliminate the possibility of surprises or costly do-overs.
AutoNDA by SimpleDocs
Define Project Limits and Analysis Methodology. If deemed necessary, KAI shall incorporate analysis methodologies for the Business Parks in the same document as prepared in Task 1.4. The Project limit will include a one (1) mile radius from the Business Park in question as well as primary routes to/from US Highway 50. XXX recommends that the study locations should be selected based on the list of known over-capacity roadways and findings of the XXX Fee study. Existing Traffic Conditions, Deficiencies and Needed Improvements Operational Assessment KAI shall gather and analyze the most recent available traffic data (peak hour and ADT) at up to five (5) roadways for each Business Park. The traffic count information assembled shall be used to compare roadway segment AM and PM peak hour traffic volume to peak hour thresholds and/or volume-to-capacity ratio that exceed County’s design standards and/or LOS policy. KAI shall prepare a description of roadway, transit, bicycle and pedestrian systems within the study area of each Business Park.

Related to Define Project Limits and Analysis Methodology

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Constructability Review Prepare detailed interdisciplinary constructability review within Fourteen (14) days of receipt of the plans from the District that:

  • Project Plan Development of Project Plan Upon the Authorized User’s request, the Contractor must develop a Project Plan. This Project Plan may include Implementation personnel, installation timeframes, escalation procedures and an acceptance plan as appropriate for the Services requested. Specific requirements of the plan will be defined in the RFQ. In response to the RFQ, the Contractor must agree to furnish all labor and supervision necessary to successfully perform Services procured from this Lot. Project Plan Document The Contractor will provide to the Authorized User, a Project Plan that may contain the following items: • Name of the Project Manager, Contact Phone Numbers and E-Mail Address; • Names of the Project Team Members, Contact Phone Numbers and E-Mail Address; • A list of Implementation milestones based on the Authorized User’s desired installation date; • A list of responsibilities of the Authorized User during system Implementation; • A list of designated Contractor Authorized Personnel; • Escalation procedures including management personnel contact numbers; • Full and complete documentation of all Implementation work; • Samples of knowledge transfer documentation; and • When applicable, a list of all materials and supplies required to complete the Implementation described in the RFQ. Materials and Supplies Required to Complete Implementation In the event that there are items required to complete an Implementation, the Contractor may request the items be added to its Contract if the items meet the scope of the Contract. Negotiation of Final Project Plan If the Authorized User chooses to require a full Project Plan, the State further reserves the right for Authorized Users to negotiate the final Project Plan with the apparent RFQ awardee. Such negotiation must not substantively change the scope of the RFQ plan, but can alter timeframes or other incidental factors of the final Project Plan. The Authorized User will provide the Contractor a minimum of five (5) business days’ notice of the final negotiation date. The Authorized User reserves the right to move to the next responsible and responsive bidder if Contractor negotiations are unsuccessful.

  • Project Background 6.1.1. Brief description of Contracting Agency’s project background and/or situation leading to this Project

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.

  • Program Evaluation The School District and the College will develop a plan for the evaluation of the Dual Credit program to be completed each year. The evaluation will include, but is not limited to, disaggregated attendance and retention rates, GPA of high-school-credit-only courses and college courses, satisfactory progress in college courses, state assessment results, SAT/ACT, as applicable, TSIA readiness by grade level, and adequate progress toward the college-readiness of the students in the program. The School District commits to collecting longitudinal data as specified by the College, and making data and performance outcomes available to the College upon request. HB 1638 and SACSCOC require the collection of data points to be longitudinally captured by the School District, in collaboration with the College, will include, at minimum: student enrollment, GPA, retention, persistence, completion, transfer and scholarships. School District will provide parent contact and demographic information to the College upon request for targeted marketing of degree completion or workforce development information to parents of Students. School District agrees to obtain valid FERPA releases drafted to support the supply of such data if deemed required by counsel to either School District or the College. The College conducts and reports regular and ongoing evaluations of the Dual Credit program effectiveness and uses the results for continuous improvement.

  • Project Implementation 2. The Borrower shall: