DELIVERYPRESSURE Sample Clauses

DELIVERYPRESSURE. Xxxxxx agrees to use due care and diligence to furnish gas hereunder at such uniform pressure as Seller may elect up to, but not exceeding 35 pounds per square inch gauge, and not less than 20 pounds per square inch gauge, at the "Point of Delivery". Buyer shall be responsible for the installation and operation of adequate safety equipment downstream of the Point of Delivery so as to relieve or control pressure variations within the limits described above that may, for any reason through malfunction of Seller's equipment or otherwise, occur on Buyer's side ofthe "Delivery Point". retoSdprrlolivivveieciudressyuaspgteprmelpyer.sanInbtseeororlfeuwheneve(Nb)OMIN dvSpatontaoeadeogrgobonyalticanrabulraotuftstBceie5dahsuasomrlpnegern0yieiuersdponsaeisxyestslpsceik.,, T(dSaaORSe)fCSgdrulElFAErioOolpepveRmRbNitlftsPerpoitrVBetvsV1oSEaerleyeunIolPIir tcovhoanlugme e Xxxxx's responsibility to notify producers and connecting pipelines regarding any change in transpmiation volumes. Seller will accept changes in daily volumes dispatched from an upstream pipeline; however, Seller reserves the right to limit or restrict the volumes accepted and transpo1ied at any time whenever, in Seller's sole opinion, operating conditions warrant a limitation or restriction on the acceptance or delivery of transportation gas. Limitations or restrictions may be because of, but not limited to, the utilization of deliverability capacity of Seller for Seller's system supply requirements.
AutoNDA by SimpleDocs
DELIVERYPRESSURE. Seller agrees to use due care and diligence to furnish gas hereunder at such uniform pressure as Seller may elect up to, but not exceeding 60 pounds per square inch gauge, and not less than pounds per square inch gauge, at the "Point of Delive1y". Buyer shall be responsible for the installation and operation of adequate safety equipment downstream of the Point of Delivery so as to relieve or control pressure variations within the limits described above that may, for any reason through malfunction of Seller's equipment or otherwise, occur on Buyer's side of the "Delivery Point". T(dSaaOpRStef)eCSag odrlEFlcAEroiOliecvegeRnmRlNePeraitVvpasVrsSESyetI vdSpaotontoaedogrobhofnaydlimaruaeulontsueieuspmlroereyirinsaxentlcs

Related to DELIVERYPRESSURE

  • DELIVERY PRESSURE Xxxxxx agrees to use due care and diligence to furnish gas hereunder at such uniform pressure as Seller may elect up to, but not exceeding 20 pounds per square inch gauge, and not less than 5 pounds per square inch gauge, at the "Point of Delivery". Buyer shall be responsible for the installation and operation of adequate safety equipment downstream of the Point of Delivery so as to relieve or control pressure variations within the limits described above that may, for any reason through malfunction of Seller's equipment or otherwise, occur on Buyer's side of the "Delivery Point".

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Receipt Points The Points of Receipt are listed in Appendix 2.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Load A term that refers to either a consumer of Energy or the amount of demand (MW) or Energy (MWh) consumed by certain customers. Load Serving Entity (“LSE”). Any entity, including a Municipal Electric System and a Cooperatively Owned Electric System, authorized or required by law, regulatory authorization or requirement, agreement, or contractual obligation to supply Energy, Capacity and/or Ancillary Services to retail customers located within the NYCA, including an entity that takes service from the ISO to supply its own Load within the NYCA; provided, however, that such entity has obtained all governmental authorizations necessary to serve Load in the NYCA.

  • Delivery Location All Goods shall be delivered to the address specified in this Order (the "Delivery Location") during Buyer's normal business hours or as otherwise instructed by Buyer.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

Time is Money Join Law Insider Premium to draft better contracts faster.