DEMONSTRATION SYSTEM INTEGRATION AND TEST Sample Clauses

DEMONSTRATION SYSTEM INTEGRATION AND TEST. After the final design review, H Power shall construct a breadboard system to allow for any required bench testing of the hybrid power source components, sub-systems, and system. Concurrently, H Power shall develop and submit a test plan to assess the ability of the Xxxx I system to meet all of the general requirements contained herein and the technical requirements generated as a result of the Task 1 effort (including requirements for EMI, Noise, and Shock and Vibration). Testing shall include but not be limited to Bench testing and Performance testing at various ambient conditions of the breadboard unit; and EMI, Noise, Shock and Vibration and Performance at various ambient temperatures of the Xxxx I unit. The Government will review the test plan within 10 business days and either approve or have the contractor adjust the test plan. The contractor shall complete all adjustments to the test plan within 10 days after receipt of written notification from the Government of any adjustments. H Power shall construct and package the components to make the Xxxx I prototype hybrid power source. The contractor shall provide, as deliverables, the Xxxx I prototype hybrid power source, a final report including all test data and any comments or recommendations for system improvements, and written instructions for the safe operation and maintenance of the Xxxx I hybrid power source. GENERAL REQUIREMENTS FOR THE FUEL CELL/BATTERY HYBRID POWER SOURCE: The fuel cell/battery hybrid power source shall meet the following general requirements: 1. The hybrid power source shall be of modular design and shall include as a minimum a hydrogen-air proton exchange membrane fuel cell, a rechargeable battery, a hydrogen fuel source, power conditioning, and a control system. 2. The fuel cell shall provide nominal mission power plus sufficient power to recharge the battery. 3. The battery shall be capable of handling intermittent short power bursts of a magnitude at least twice the nominal power. 4. The hybrid power source shall be refuelable. 5. The design shall incorporate all safety and human factors features required for the safe operation and maintenance of the hybrid power source. 6. The hybrid power source shall have commercial and military applications. SCHEDULE: The schedule shall be identical to that which is attached to this document.

Related to DEMONSTRATION SYSTEM INTEGRATION AND TEST

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards. 2. Grantee agrees to cooperate fully and provide the System Agency and its representatives timely access to Products, records, and other items and information needed to conduct such review, evaluation, testing, and monitoring.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

  • Trunk Group Architecture and Traffic Routing 5.2.1 The Parties shall jointly establish Access Toll Connecting Trunks between CLEC and CBT by which they will jointly provide Tandem-transported Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic from and to CLEC's Customers. 5.2.2 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access and non-translated Toll Free traffic (e.g., 800/888) to allow CLEC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier that is connected to the CBT access Tandem. 5.2.3 The Access Toll Connecting Trunks shall be one-way or two-way trunks, as mutually agreed, connecting an End Office Switch that CLEC utilizes to provide Telephone Exchange Service and Switched Exchange Access Service in the given LATA to an access Tandem Switch CBT utilizes to provide Exchange Access in the LATA.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Connectivity User is solely responsible for providing and maintaining all necessary electronic communications with Exchange, including, wiring, computer hardware, software, communication line access, and networking devices.

  • Program Monitoring and Evaluation The Recipient shall prepare, or cause to be prepared, and furnish to the Association not later than six months after the Closing Date, a report of such scope and in such detail as the Association shall reasonably request, on the execution of the Program, the performance by the Recipient and the Association of their respective obligations under the Legal Agreements and the accomplishment of the purposes of the Financing.”

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§00-000-000, 00-000-000, 00-000-000, and 00- 000-000, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.

  • Implementation and Review The Parties shall consult annually, or as otherwise agreed, to review the implementation of this Chapter and consider other matters of mutual interest affecting trade in services. (10) 10 Such consultations will be addressed under Article 170 (Free Trade Commission) of Chapter 14 (Administration of the Agreement).