Design Building Block approach5 Sample Clauses

Design Building Block approach5. Building Block methodology is integrated in software denominated Paramarine. Paramarine is an integrated design environment that is based on an object-orientated framework which allows the parametric connection of all aspects of both the product model and the analysis together. In addition to this, development and investigation of a concept design is streamlined by the Early Stage Design (ESD) module This innovative approach is based on UCL's (university College London) Building Block methodology, collating design requirements, product model definition and analysis together to establish the form, function and layout of design. Source: xxx.xxx.xxxxxxx.xxx Figure 27: A frigate represented by its functional Building Blocks. 5 Xxxxxxx, X.X._0000_Xxxxxxxxxx and the design building block approach in the design of ships and other complex systems. doi: 10.1098/rspa.2006.1728 The design is broken down hierarchically in terms of functions (Building Blocks). The building block approach proceeds by refining the top-level functional headings into ever greater detail maintaining a function-based approach throughout Alongside the refining of the functional definition. The designer can develop a 3D vessel layout and allocate the functional definitions to physical spaces in the ship. It is emphasised that the building block is a functional entity. Source: xxx.xxx.xxxxxxx.xxx Figure 28: A support vessel design layout In the archetypal initial functional breakdown, below the design are the functional areas 'float', 'move', 'fight' and 'infrastructure'. For vessels other than warships, one might substitute functional headings for ‘mission’ or payload for 'fight'. Other desired top level functions such as adaptability, or maintainability can also be used. This software has different Modules which are:  Surface Modeler  Solid Modeler  Stability Calculator (Launching& docking)  Stability Criteria - Submarines  Powering  Structural Definition (Ships & Submarines)  Structural Analysis - Submarines  Submarine Early Stage Design  Hull Generation  Design for Production  Submarine Manoeuvering The Design Building Block approach provides an integrated model that allows the designer to explore both the configuration and numerical aspects of a design. This model allows the designer to explore innovative design solutions.
AutoNDA by SimpleDocs

Related to Design Building Block approach5

  • Design-Builder The person or entity responsible for the proper completion of the activities described in the Contract Documents and who executes the Contract.

  • SCOPE OF ARCHITECT’S BASIC SERVICES 3.1 The Architect’s Basic Services consist of those described in this Article 3 and include usual and customary structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental or Additional Services.

  • Project Approach € Project schedules and budgets are reviewed by the Project Manager on a weekly basis during our company-wide Project Managers Meeting using project status reports generated by our control software (Deltek Vision). Progress is compared to the schedule and budget to ensure adequate resources are available and that necessary coordination is occurring. Costs are reported real time, with actual labor based on time sheet entry and actual expense costs based on invoices. The reporting system can be customized to track specific tasks or efforts in multiple categories, making it flexible enough to adapt to any project specific requirements. We hold regular project coordination meetings to facilitate communication and information transfer among the design team. These meetings are held weekly and are supplemented with e-mail communication, as well as telephone conversations. We hold monthly project status meetings with your project manager to update project status, discuss priorities, and receive direction from City staff. This provides an opportunity for communication and information to flow openly between the City and the design team. These meetings are supplemented by communications that will occur via e-mail and telephone. We conduct meetings with other agencies and stakeholders impacted by the work as needed. E-mail and telephone communication work well for quick questions or minor issues, but we have found that the most effective means of communication with other agencies and stakeholders is the “old-fashioned” face- to-face mexxxxx. Xxbble’s record of providing quality civil engineering services to our clients reflects our ability to manage multiple projects effectively and efficiently. Our philosophy is that each project is personally overseen by one of our principal officers, thereby providing immediate attention to all project aspects (i.e. negotiations, communications, schedule, budgets).

  • Work Loads If an employee believes the amount of work he or she is required to perform is excessive over what is required from the rest of the staff and it will result in an occupational accident or occupational injury to him or her, the question shall be referred to Section 17 of this Agreement.

  • PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Site Work An expansion of the Connecting Transmission Owner’s Boonville Station is required to accommodate the CTOIFs. The southern corner of the fence line will be expanded out by approximately 3,200 square feet. The Connecting Transmission Owner already owns the property required for the expansion. Approximately 120 feet of the existing fencing will need to be removed and approximately 150 feet of new fencing added.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Site Improvements The City may require a Developer to undertake site improvements upon completion of construction. Site improvements include, but are not limited to, seeding or sodding of front yards, and 4' chain-link fencing. Said site improvements must be undertaken when seasonally appropriate. The City reserves the right to make an exception on a case-by-case basis.