Design Document Conflicts Sample Clauses

Design Document Conflicts. In the event of a difference, conflict, or discrepancy between or among the requirements or practices of the Design Documents and SMEU Distribution Construction Standard, the Design Documents shall govern. In the event Licensee believes a Design Document or SMEU Distribution Construction Standard is inconsistent with Electrical Code or applicable law, Licensee shall refer the matter to SMEU for determination.
AutoNDA by SimpleDocs

Related to Design Document Conflicts

  • Design Documents Prepare and submit the following documents to the DAS - Records Management Office with a copy of the transmittal letter submitted to the respective Project Manager: 1. City/State Approved Drawings (1) Original set 2. Bid Set Drawings (1) Set BOND PAPER (marked as “ORIGINAL”) (1) Set electronic file (DWG & PDF) 3. Project Manual (1) Set hard copy & Detail Manual (1) Set electronic file

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • CONTRACT DOCUMENTS AND CONFLICT OF TERMS This Centralized Contract is composed of the documents set forth below. In the case of any conflict among these documents, conflicts shall be resolved in the order of precedence indicated below.

  • Potential Conflicts 7.1. The Board will monitor the Fund for the existence of any material irreconcilable conflict between the interests of the contract owners of all separate accounts investing in the Fund. An irreconcilable material conflict may arise for a variety of reasons, including: (a) an action by any state insurance regulatory authority; (b) a change in applicable federal or state insurance, tax, or securities laws or regulations, or a public ruling, private letter ruling, no-action or interpretative letter, or any similar action by insurance, tax, or securities regulatory authorities; (c) an administrative or judicial decision in any relevant proceeding; (d) the manner in which the investments of any Portfolio are being managed; (e) a difference in voting instructions given by variable annuity contract owners and variable life insurance contract owners; or (f) a decision by a Participating Insurance Company to disregard the voting instructions of contract owners. The Board shall promptly inform the Company if it determines that an irreconcilable material conflict exists and the implications thereof. 7.2. The Company will report any potential or existing material irreconcilable conflict of which it is aware to the Board. The Company will assist the Board in carrying out its responsibilities under the Shared Funding Exemptive Order, by providing the Board with all information reasonably necessary for the Board to consider any issues raised. This includes, but is not limited to, an obligation by the Company to inform the Board whenever contract owner voting instructions are disregarded. 7.3. If it is determined by a majority of the Board, or a majority of its disinterested trustees, that a material irreconcilable conflict exists, the Company and other Participating Insurance Companies shall, at their expense and to the extent reasonably practicable (as determined by a majority of the disinterested trustees), take whatever steps are necessary to remedy or eliminate the irreconcilable material conflict, up to and including: (1) withdrawing the assets allocable to some or all of the separate accounts from the Fund or any Portfolio and reinvesting such assets in a different investment medium, including (but not limited to) another Portfolio of the Fund, or submitting the question whether such segregation should be implemented to a vote of all affected Contract owners and, as appropriate, segregating the assets of any appropriate group (i.e., annuity contract owners, life insurance policy owners, or variable contract owners of one or more Participating Insurance Companies) that votes in favor of such segregation, or offering to the affected contract owners the option of making such a change; and (2) establishing a new registered management investment company or managed separate account. No charge or penalty will be imposed as a result of such withdrawal. The Company agrees that it bears the responsibility to take remedial action in the event of a Board determination of an irreconcilable material conflict and the cost of such remedial action, and these responsibilities will be carried out with a view only to the interests of Contract owners. 7.4. If a material irreconcilable conflict arises because of a decision by the Company to disregard contract owner voting instructions and that decision represents a minority position or would preclude a majority vote, the Company may be required, at the Fund's election, to withdraw the affected Account's investment in the Fund and terminate this Agreement with respect to such Account (at the Company's expense); provided, however that such withdrawal and termination shall be limited to the extent required by the foregoing material irreconcilable conflict as determined by a majority of the disinterested members of the Board. No charge or penalty will be imposed as a result of such withdrawal. The Company agrees that it bears the responsibility to take remedial action in the event of a Board determination of an irreconcilable material conflict and the cost of such remedial action, and these responsibilities will be carried out with a view only to the interests of Contract owners. 7.5. For purposes of Sections 7.3 through 7.4 of this Agreement, a majority of the disinterested members of the Board shall determine whether any proposed action adequately remedies any irreconcilable material conflict, but in no event will the Fund be required to establish a new funding medium for the Contracts. The Company shall not be required by Section 7.3 through 7.4 to establish a new funding medium for the Contracts if an offer to do so has been declined by vote of a majority of Contract owners materially adversely affected by the irreconcilable material conflict. 7.6. If and to the extent that Rule 6e-2 and Rule 6e-3(T) are amended, or Rule 6e-3 is adopted, to provide exemptive relief from any provision of the 1940 Act or the rules promulgated thereunder with respect to mixed or shared funding (as defined in the Shared Funding Exemptive Order) on terms and conditions materially different from those contained in the Shared Funding Exemptive Order, then the Fund and/or the Participating Insurance Companies, as appropriate, shall take such steps as may be necessary to comply with Rules 6e-2 and 6e-3(T), as amended, and Rule 6e-3, as adopted, to the extent such rules are applicable.

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall demonstrate and provide written assurance to Owner that all conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.

  • MONITORING FOR MATERIAL IRRECONCILABLE CONFLICTS AVIF agrees that its Board of Directors will monitor for the existence of any material irreconcilable conflict between the interests of the Participants in all separate accounts of life insurance companies utilizing AVIF ("Participating Insurance Companies"), including each Account, and participants in all qualified retirement and pension plans investing in AVIF ("Participating Plans"). LIFE COMPANY agrees to inform the Board of Directors of AVIF of the existence of or any potential for any such material irreconcilable conflict of which it is aware. The concept of a "material irreconcilable conflict" is not defined by the 1940 Act or the rules thereunder, but the Parties recognize that such a conflict may arise for a variety of reasons, including, without limitation: (a) an action by any state insurance or other regulatory authority; (b) a change in applicable federal or state insurance, tax or securities laws or regulations, or a public ruling, private letter ruling, no-action or interpretative letter, or any similar action by insurance, tax or securities regulatory authorities; (c) an administrative or judicial decision in any relevant proceeding; (d) the manner in which the investments of any Fund are being managed; (e) a difference in voting instructions given by variable annuity contract and variable life insurance contract Participants or by Participants of different Participating Insurance Companies; (f) a decision by a Participating Insurance Company to disregard the voting instructions of Participants; or (g) a decision by a Participating Plan to disregard the voting instructions of Plan participants. Consistent with the SEC's requirements in connection with exemptive orders of the type referred to in Section 5.1 hereof, LIFE COMPANY will assist the Board of Directors in carrying out its responsibilities by providing the Board of Directors with all information reasonably necessary for the Board of Directors to consider any issue raised, including information as to a decision by LIFE COMPANY to disregard voting instructions of Participants. LIFE COMPANY's responsibilities in connection with the foregoing shall be carried out with a view only to the interests of Participants.

  • Client Conflicts If this Agreement is with more than one client, our Services shall be based upon the joint goals as communicated to us by the Clients, collectively. We shall be permitted to rely upon instructions and/or information we receive from either party, unless and until such reliance is revoked in writing to us. We shall not be responsible for any claims or damages resulting from such reliance or from any change in the status of the relationship between Clients.

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Project Documentation All documentation provided to the City other than Project drawings shall be furnished on a Microsoft compatible compact disc.

  • Construction Documents Phase Bidding or Negotiation Phase: