Design Phase Change Order Report Sample Clauses

Design Phase Change Order Report. The CM shall prepare and distribute Design Phase change order reports that shall list all Owner-approved change orders as of the date of the report and shall state the effect of the change orders on the Project and Construction Budget and the Master Schedule.
AutoNDA by SimpleDocs
Design Phase Change Order Report. The Construction Manager shall prepare and distribute Design Phase Change Order Reports that shall list all Owner- approved Change Orders as of the date of the report and shall state the effect of the Change Orders on the Project and Construction Budget and the Master Schedule.

Related to Design Phase Change Order Report

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Final Project Report Prepare a Final Project Report that addresses, to the extent feasible, comments made by the Grant Manager on the Draft Final Project Report. Submit one (1) reproducible master and an electronic copy of the final. Upload an electronic copy of the final report in pdf format to the FAAST system.

  • Progress Report By March 1 of each year, ***** will submit a written annual report to Stanford covering the preceding calendar year. The report will include information sufficient to enable Stanford to satisfy reporting requirements of the U.S. Government and for Stanford to ascertain progress by ***** toward meeting this Agreement’s diligence requirements. Each report will describe, where relevant: *****’s progress toward commercialization of Licensed Product, including work completed, key scientific discoveries, summary of work-in-progress, current schedule of anticipated events or milestones, market plans for introduction of Licensed Product, and significant corporate transactions involving Licensed Product. ***** will specifically describe how each Licensed Product is related to each Licensed Patent.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Project Review A. Programmatic Allowances 1. If FEMA determines that the entire scope of an Undertaking conforms to one or more allowances in Appendix B of this Agreement, with determinations for Tier II Allowances being made by SOI-qualified staff, FEMA shall complete the Section 106 review process by documenting this determination in the project file, without SHPO review or notification. 2. If the Undertaking involves a National Historic Landmark (NHL), FEMA shall notify the SHPO, participating Tribe(s), and the NPS NHL Program Manager of the NPS Midwest Regional Office that the Undertaking conforms to one or more allowances. FEMA shall provide information about the proposed scope of work for the Undertaking and the allowance(s) enabling FEMA’s determination. 3. If FEMA determines any portion of an Undertaking’s scope of work does not conform to one or more allowances listed in Appendix B, FEMA shall conduct expedited or standard Section 106 review, as appropriate, for the entire Undertaking in accordance with Stipulation II.B, Expedited Review for Emergency Undertakings, or Stipulation II.C, Standard Project Review. 4. Allowances may be revised and new allowances may be added to this Agreement in accordance with Stipulation IV.A.3, Amendments. B. Expedited Review for Emergency Undertakings

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents. 9.2 Materials or Work described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to recognized standards, unless noted otherwise. 9.3 Trade Name or Trade Term It is not the intention of the Contract Documents to go into detailed descriptions of any materials and/or methods commonly known to the trade under “trade name” or “trade term.” The mere mention or notation of “trade name” or “trade term” shall be considered a sufficient notice to Developer that it will be required to complete the work so named, complete, finished, and operable, with all its appurtenances, according to the best practices of the trade. 9.4 The naming of any material and/or equipment shall mean furnishing and installing of same, including all incidental and accessory items thereto and/or labor therefor, as per best practices of the trade(s) involved, unless specifically noted otherwise. 9.5 Contract Documents are complementary, and what is called for by one shall be binding as if called for by all. As such, Drawings and Specifications are intended to be fully cooperative and to agree. However, if Developer observes that Drawings and Specifications are in conflict with the Contract Documents, Developer shall promptly notify District and Architect in writing, and any necessary changes shall be made as provided in the Contract Documents. 9.6 Figured dimensions shall be followed in preference to scaled dimensions, and Developer shall make all additional measurements necessary for the work and shall be responsible for their accuracy. Before ordering any material or doing any work, each Developer shall verify all measurements at the building and shall be responsible for the correctness of same. 9.7 Should any question arise concerning the intent or meaning of the Contract Documents, including the Plans and Specifications, the question shall be submitted to the District for interpretation. If a conflict exists in the Contract Documents, these Construction Provisions shall control over the Facilities Lease, which shall control over the Site Lease, which shall control over Division 1 Documents, which shall control over Division 2 through Division 49 documents, which shall control over figured dimensions, which shall control over large-scale drawings, which shall control over small-scale drawings. In no case shall a document calling for lower quality and/or quantity of material or workmanship control. However, in the case of discrepancy or ambiguity solely between and among the Drawings and Specifications, the discrepancy or ambiguity shall be resolved in favor of the interpretation that will provide District with the functionally complete and operable Project described in the Drawings and Specifications. 9.8 Drawings and Specifications are intended to comply with all laws, ordinances, rules, and regulations of constituted authorities having jurisdiction, and where referred to in the Contract Documents, the laws, ordinances, rules, and regulations shall be considered as a part of the Contract Documents within the limits specified. 9.9 As required by Section 4-317(c), Part 1, Title 24, CCR: “Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the DSA-approved documents wherein the finished work will not comply with Title 24, California Code of Regulations, a construction change document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by DSA before proceeding with the repair work.”

  • Design Review ‌ (a) Where so specified in Schedule A (Scope of Goods and Services) or as otherwise instructed by the City, the Supplier shall submit design-related Documentation for review by the City, and shall not proceed with work on the basis of such design Documentation until the City’s approval of such Documentation has been received in writing. (b) None of: (i) the submission of Documentation to the City by the Supplier; (ii) its examination by or on behalf of the City; or (iii) the making of any comment thereon (including any approval thereof) shall in any way relieve the Supplier of any of its obligations under this Agreement or of its duty to take reasonable steps to ensure the accuracy and correctness of such Documentation, and its suitability to the matter to which it relates.

  • Progress Reports The Recipient shall submit to the OPWC, at the OPWC's request, summary reports detailing the progress of the Project pursuant to this Agreement and any additional reports containing such information as the OPWC may reasonably require.

  • Implementation Report Within 150 days after the Effective Date, Ensign Group shall submit a written report to OIG summarizing the status of its implementation of the requirements of this CIA (Implementation Report). The Implementation Report shall, at a minimum, include: 1. the name, address, phone number, and position description of the Compliance Officer required by Section III.A, and a summary of other noncompliance job responsibilities the Compliance Officer may have; 2. the names and positions of the members of the Compliance Committee required by Section III.A; 3. the names and positions of the members of the Board of Directors who are responsible for satisfying the Board of Directors compliance obligations described in Section III.A.3; 4. a copy of Ensign Group’s Code of Conduct required by Section III.B.1; 5. the number of individuals required to complete the Code of Conduct certification required by Section III.B.1, the percentage of individuals who have completed such certification, and an explanation of any exceptions (the documentation supporting this information shall be available to OIG upon request); 6. a summary of all Policies and Procedures required by Section III.B (copies of the Policies and Procedures shall be made available to OIG upon request); 7. the following information regarding each type of training required by Section III.C: a. a description of such training, including a summary of the topics covered, the length of sessions, and a schedule of training sessions; b. the number of individuals required to be trained, percentage of individuals actually trained, and an explanation of any exceptions. A copy of all training materials and the documentation supporting this information shall be made available to OIG upon request. 8. a description of the Disclosure Program required by Section III.E; 9. the following information regarding the IRO(s): (a) identity, address, and phone number; (b) a copy of the engagement letter; (c) information to demonstrate that the IRO has the qualifications outlined in Appendix A to this CIA; (d) a summary and description of any and all current and prior engagements and agreements between Ensign Group and the IRO; and (e) a certification from the IRO regarding its professional independence and objectivity with respect to Ensign Group; 10. a description of the process by which Ensign Group fulfills the requirements of Section III.F regarding Ineligible Persons; 11. a list of all of Ensign Group’s locations (including locations and mailing addresses); the corresponding name under which each location is doing business; the corresponding phone numbers and fax numbers; each location’s Medicare and state Medicaid program provider number and/or supplier number(s); and the name and address of each Medicare and state Medicaid program contractor to which Ensign Group currently submits claims; 12. a description of Ensign Group’s corporate structure, including identification of any parent and sister companies, subsidiaries, and their respective lines of business; and

  • Statement of Work The Statement of Work to which Grantee is bound is incorporated into and made a part of this Grant Agreement for all purposes and included as Attachment A.