Design Phase Responsibilities Sample Clauses

Design Phase Responsibilities. The Design Phase includes the preparation of the design and construction Documents for the project including, but not limited, to all necessary architectural design, specialty consultant services, civil engineering, structural engineering, mechanical engineering, plumbing and HVAC design, fire protection system engineering, landscape architecture, electrical engineering, security system design, telecommunications, data and low-voltage signaling design, geotechnical engineering, topographic and boundary surveying, interior design, space planning and modular furniture systems & fixtures, furniture & equipment coordination, acoustical engineering. The work shall also include all relevant plan checks and permitting activities required for construction activities.
AutoNDA by SimpleDocs
Design Phase Responsibilities. The Contractor or designee will serve as architect-of- record, obtain all necessary permits, including but not limited to building permits and earth change or CZM permits, provide all necessary information for GMP packages, including packages for alternates, and bidding out work to subcontractors, and construction administration and the following: 1) Participation in program development and/or refinement of existing programming including coordination with the BOC design review architect and the BOC correctional facility master plan. 2) Cost estimating to determine budgets. 3) Schematic and design development incorporating BOC’s bridging documentplans and specifications. 4) Preparation of construction documents, including specifications. 5) Development of contractor notices and schedule. 6) Direction and coordination of pre-bid construction conferences. 7) Assisting the BOC in bid openings and analysis of bid documents, preparation of results and GMP. 8) Making application for and securing all necessary permits and approvals. 9) Providing necessary drawings and specifications as requested by utility companies. 10) Administration of the contract for construction, including site inspection and observation. 11) Review and recommendation for approval of pay requests, change orders, and time extensions in compliance with the FEMA Public Assistance Program and Preparation of all closeout materials, including transfer of maintenance manuals and record drawings for submittal to BOC. 12) Attendance at BOC meetings related to the project, as needed. 13) Providing warranty evaluation during the two-year warranty period. 14) Other services as required by statute, regulations, contract, standards of the practice, or mutually agreeable to the owner and architect.

Related to Design Phase Responsibilities

  • Engineer Responsibilities No subcontract relieves the Engineer of any responsibilities under this contract.

  • Customer Responsibilities Notwithstanding the above, Customer agrees that except as provided by this DPA, Customer is responsible for its secure use of the Services, including securing its account authentication credentials, protecting the security of Customer Data when in transit to and from the Services and taking any appropriate steps to securely encrypt or backup any Customer Data uploaded to the Services.

  • Construction Responsibilities The party named in Article 1, Responsible Parties, under AGREEMENT is responsible for the following: A. Advertise for construction bids, issue bid proposals, receive and tabulate the bids, and award and administer the contract for construction of the Project. Administration of the contract includes the responsibility for construction engineering and for issuance of any change orders, supplemental agreements, amendments, or additional work orders that may become necessary subsequent to the award of the construction contract. In order to ensure federal funding eligibility, projects must be authorized by the State prior to advertising for construction. B. If the State is the responsible party, the State will use its approved contract letting and award procedures to let and award the construction contract. C. If the Local Government is the responsible party, the Local Government shall submit its contract letting and award procedures to the State for review and approval prior to letting. D. If the Local Government is the responsible party, the State must concur with the low bidder selection before the Local Government can enter into a contract with the vendor. E. If the Local Government is the responsible party, the State must review and approve change orders. F. Upon completion of the Project, the party responsible for constructing the Project will issue and sign a “Notification of Completion” acknowledging the Project’s construction completion and submit certification(s) sealed by a professional engineer(s) licensed in the State of Texas. G. For federally funded contracts, the parties to this Agreement will comply with federal construction requirements cited in 23 CFR Part 635 and with requirements cited in 23 CFR Part 633, and shall include the latest version of Form “FHWA-1273” in the contract bidding documents. If force account work will be performed, a finding of cost effectiveness shall be made in compliance with 23 CFR 635, Subpart B.