Transportation Management Tenant shall fully comply with all present or future programs intended to manage parking, transportation or traffic in and around the Building, and in connection therewith, Tenant shall take responsible action for the transportation planning and management of all employees located at the Premises by working directly with Landlord, any governmental transportation management organization or any other transportation-related committees or entities.
Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.
Radiation Therapy/Chemotherapy Services This plan covers chemotherapy and radiation services. This plan covers respiratory therapy services. When respiratory services are provided in your home, as part of a home care program, durable medical equipment, supplies, and oxygen are covered as a durable medical equipment service.
Environmental Services 1. Preparation of Environmental Documentation (CEQA/NEPA) including but not limited to the following: a. Initial Study b. Categorical Exemption (CE) c. Notice of Exemption (XXX) d. Negative Declaration (ND) e. Mitigated Negative Declaration (MND) f. Notice of Preparation (NOP) g. Environmental Impact Report (EIR) i. Initial Document (Screen Check/Administrative Draft) ii. Addendum iii. Supplemental
Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.
Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:
Surgery Services This plan covers surgery services to treat a disease or injury when: • the operation is not experimental or investigational, or cosmetic in nature; • the operation is being performed at the appropriate place of service; and • the physician is licensed to perform the surgery. This plan covers reconstructive surgery and procedures when the services are performed to relieve pain, or to correct or improve bodily function that is impaired as a result of: • a birth defect; • an accidental injury; • a disease; or • a previous covered surgical procedure. Functional indications for surgical correction do not include psychological, psychiatric or emotional reasons. This plan covers the procedures listed below to treat functional impairments. • abdominal wall surgery including panniculectomy (other than an abdominoplasty); • blepharoplasty and ptosis repair; • gastric bypass or gastric banding; • nasal reconstruction and septorhinoplasty; • orthognathic surgery including mandibular and maxillary osteotomy; • reduction mammoplasty; • removal of breast implants; • removal or treatment of proliferative vascular lesions and hemangiomas; • treatment of varicose veins; or • gynecomastia.
Patch Management All workstations, laptops and other systems that process and/or 20 store PHI COUNTY discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or 21 transmits on behalf of COUNTY must have critical security patches applied, with system reboot if 22 necessary. There must be a documented patch management process which determines installation 23 timeframe based on risk assessment and vendor recommendations. At a maximum, all applicable 24 patches must be installed within thirty (30) calendar or business days of vendor release. Applications 25 and systems that cannot be patched due to operational reasons must have compensatory controls 26 implemented to minimize risk, where possible.
Energy Cooperation shall focus on: (a) renewable energy; (b) promoting the saving of energy; (c) applied research relating to networks of databases linking the two Parties' economic and social operators; (d) backing efforts to modernise and develop energy networks and the interconnection of such networks with Community networks.
Virus Management DST shall maintain a malware protection program designed to deter malware infections, detect the presence of malware within DST environment.