Disputes between the Contracting Parties concerning the interpretation Sample Clauses

Disputes between the Contracting Parties concerning the interpretation or Application of this Agreement 1. Any dispute concerning the interpretation or application of this Agreement shall, if possible, be settled through diplomatic channels. 2. In the absence of rules through diplomatic channels, the dispute shall be submitted to a joint commission composed of representatives of both sides, which shall meet at the request of either party diligent and without undue delay. 3. If the Joint Commission cannot settle the dispute shall be submitted, at the request of either contracting party to an arbitral tribunal constituted for each individual case in the following way: Each Contracting Party shall appoint an arbitrator within two months from the date on which either Contracting Party has informed the other of its intention to submit the dispute to arbitration. Within two months after their appointment, the two arbitrators shall appoint by mutual agreement a national of a third State who will serve as the Chairman of the arbitral tribunal. If the time limits have not been made, either Contracting Party may invite the President of the International Court of Justice to make the appointment or the necessary appointments (s). If the President of the International Court of Justice is a national of either Contracting Party or of a State with which either Contracting Party does not maintain diplomatic relations or if he is otherwise prevented from exercising this function, the Vice-President of the International Court of Justice shall be invited to make the necessary appointments or appointment (s). 4. The Court thus constituted shall determine its own rules of procedure. Its decisions shall be taken by a majority of the votes; they shall be final and binding on the contracting parties. 5. Each Contracting Party shall bear the costs of its appointed arbitrator. The costs resulting from the appointment of the third arbitrator and costs of the Tribunal shall be borne in equal parts by the Contracting Parties.
AutoNDA by SimpleDocs
Disputes between the Contracting Parties concerning the interpretation or application of this Agreement shall, if possible, be settled through consultation or negotiation.
Disputes between the Contracting Parties concerning the interpretation or application of this Agreement shall be resolved by the Parties by negotiation through diplomatic channels.
Disputes between the Contracting Parties concerning the interpretation or Application of this Agreement 1. Disputes between the contracting parties concerning the interpretation or application of this Agreement shall be settled as far as possible through consultations or negotiations. 2. In the absence of a settlement through negotiations or consultations within a period of three months, the dispute shall be submitted to the Tribunal established under this article. 3. The arbitral tribunal shall be constituted for each individual case in the following way. Within three months of the receipt of the request for arbitration, each Contracting Party shall appoint one member of the Tribunal. Those two arbitrators shall select a citizen by mutual agreement of a third State who, approved by the Contracting Parties shall be appointed as Chairman of the Tribunal (hereinafter referred to as "President"). The Chairman shall be appointed within 40 days from the date of appointment of the last two of the members of the Tribunal. 4. If the necessary appointments have not been made within the periods specified in paragraph 3 of this article, either Contracting Party may request the President of the International Court of Justice to make the necessary appointment(s). If the President of the International Court of Justice is a citizen of either Contracting Party or of a State with which one of the Contracting Parties has no diplomatic relations or for any other reason, cannot discharge the said function, it shall request the Vice-President of the International Court of Justice to make the appointment(s). If the Vice-President of the International Court of Justice is also prevented from exercising the function it shall ask the next most senior member who is not a citizen of either Contracting Party, the concerned designation(s). 5. The tribunal shall determine its own rules of procedure. Its decisions shall be taken by a majority of votes. The Tribunal shall decide the dispute according to this Agreement interpreted and applied in accordance with the applicable rules of International Law. The decisions of the Tribunal shall be final and binding to the contracting parties. 6. Each Contracting Party shall bear the costs of its representation in the arbitral proceedings. The fees of the tribunal will be proportionately paid by the contracting parties. However, the Tribunal shall decide that a higher proportion of the costs be arranged by one of the Contracting Parties.
Disputes between the Contracting Parties concerning the interpretation or application of this Agreement shall be settled as far as possible by negotiations.
Disputes between the Contracting Parties concerning the interpretation or application of this Agreement shall, as far as possible, be settled amicably or through consultations, mediation or conciliation. Should the Contracting Parties agree on a controversial issue, a written understanding shall be drafted and approved by the Contracting Parties.
Disputes between the Contracting Parties concerning the interpretation or application of this Agreement shall, as far as possible, be settled through diplomatic channels.
AutoNDA by SimpleDocs

Related to Disputes between the Contracting Parties concerning the interpretation

  • Disputes between the Contracting Parties (1) Disputes between the Contracting Parties concerning the interpretation or application of this I Agreement should, as far as possible, be settled through negotiation. (2) If a dispute between the Contracting Parties cannot thus be settled within six months from the ist time the dispute arose, it shall upon the request of either Contracting Party be submitted to an arbitral tribunal. (3) Such an arbitral tribunal shall be constituted for each individual case in the following way. by Within two months of the receipt of the request for arbitration, each Contracting Party shall appoint one its member of the tribunal. Those two members shall then select a national of a third State who on approval by the two Contracting Parties shall be appointed Chairman of the tribunal. The Chairman shall be appointed within two months from the date of appointment of the other two members. (4) If within the periods specified in paragraph (3) of this Article the necessary appointments have in not been made, either Contracting Party may, in the absence of any other agreement, invite the President of the International Court of Justice to make any necessary appointments. If the President is a national of either Contracting Party or if he is otherwise prevented from discharging the said function, the Vice President shall be invited to make the necessary appointments. If the Vice President is a national of either Contracting Party or if he too is prevented from discharging the said function, the Member of the International Court of Justice next in seniority who is not a national of either Contracting Party shall be invited to make the necessary appointments. (5) The arbitral tribunal shall reach its decision by a majority of votes. Such decisions shall be binding on both Contracting Parties. Each Contracting Party shall bear the cost of its own member of the tribunal and of its representation in the arbitral proceedings; the cost of the Chairman and the remaining costs shall be borne in equal parts by the Contracting Parties. The tribunal may, however, in its decision direct that a higher proportion of costs shall be borne by one of the two Contracting Parties, and this award shall be binding on both Contracting Parties. The tribunal shall determine its own procedures.

  • Settlement of Disputes between the Contracting Parties 1. Disputes between the Contracting Parties concerning the interpretation or application of this Agreement should, if possible, be settled through diplomatic channels. 2. If a dispute between the contracting Parties cannot thus be settled, it shall upon the request of either Contracting Party be submitted to an arbitral tribunal. 3. Such as arbitral tribunal shall be constituted for each individual case in the following way. Within two months of the receipt of the request for arbitration, each Contracting Party shall appoint one member of the tribunal. Those two members shall then select a national of a third State who an approval by the two Contracting Parties shall be appointed Chairman of the tribunal. The Chairman shall be appointed within two months from the date of appointment of the other two members. 4. If within the periods specified in paragraph 3 of this Article the necessary appointments have not been made either Contracting Party may, in the absence of any other agreement, invite the President of the International Court of Justice to make any necessary appointments. If the President is a national of either Contracting Party or if he is otherwise prevented from discharging the said function, the Vice-President shall be invited to make the necessary appointments. If the vice- President is a national of either Contracting Party or if he too is prevented form discharging the said function, the members of the International Court of Justice next in seniority who is not a national of either Contracting Party Shall be invited to make the necessary appointments. 5. The arbitral tribunal shall reach its decision by a majority of votes. Such decision shall be binding on both Contracting Parties. Each Contracting Party shall bear the cost of its own member of the tribunal and of its representation in the arbitral proceedings; the cost of the Chairman and the remaining cost shall be borne in equal parts by the Contracting Parties. The tribunal may, however, in its decision direct that a higher proportion of costs shall be borne by one of the two Contracting Parties, and this award shall be binding on both Contracting Parties. The tribunal shall determine its won procedure.

  • Disputes between a Contracting Party and an Investor (1) Any dispute which may arise between an investor of one Contracting Party and the other Contracting Party in connection with an investment on the territory of that other Contracting Party shall be subject to negotiations between the parties in dispute. (2) If any dispute between an investor of one Contracting Party and the other Contracting Party continues to exist after a period of three months, investor shall be entitled to submit the case either to: (a) The International Centre for Settlement of Investment Disputes having regard to the applicable provisions of the Convention on the Settlement of Investment Disputes between States and Nationals of other States opened for signature at Washington D.C. on 18 March 1965, or in case both Contracting Parties have not become parties to this Convention, (b) An arbitrator or international ad hoc arb1 tral tribunal established under the Arbitration Rules of the United Nations Commission on International Trade Law. The parties to the dispute may agree in writing to modify these Rules. The arbitral awards shall be final and binding on both Parties to the dispute.Arbitration Rules of the United Nations Commission on International Trade Law. The parties to the dispute may agree in writing to modify these Rules. The arbitral awards shall be final and binding on both Parties to the dispute.

  • LAW GOVERNING THIS AGREEMENT This Agreement shall be governed by and construed in accordance with the laws of the State of Nevada without regard to principles of conflicts of laws. Any action brought by either party against the other concerning the transactions contemplated by this Agreement shall be brought only in the state or federal courts located in New York City, New York. The parties to this Agreement hereby irrevocably waive any objection to jurisdiction and venue of any action instituted hereunder and shall not assert any defense based on lack of jurisdiction or venue or based upon forum non conveniens. The parties executing this Agreement and other agreements referred to herein or delivered in connection herewith on behalf of the Company agree to submit to the in personam jurisdiction of such courts and hereby irrevocably waive trial by jury. The prevailing party shall be entitled to recover from the other party its reasonable attorney’s fees and costs. In the event that any provision of this Agreement or any other agreement delivered in connection herewith is invalid or unenforceable under any applicable statute or rule of law, then such provision shall be deemed inoperative to the extent that it may conflict therewith and shall be deemed modified to conform with such statute or rule of law. Any such provision which may prove invalid or unenforceable under any law shall not affect the validity or enforceability of any other provision of any agreement. Each party hereby irrevocably waives personal service of process and consents to process being served in any suit, action or proceeding in connection with this Agreement or any other Registered Offering Transaction Documents by mailing a copy thereof via registered or certified mail or overnight delivery (with evidence of delivery) to such party at the address in effect for notices to it under this Agreement and agrees that such service shall constitute good and sufficient service of process and notice thereof. Nothing contained herein shall be deemed to limit in any way any right to serve process in any other manner permitted by law.

  • Disputes between the Parties (1) Disputes between the Parties concerning the interpretation or application of this Agreement shall, if possible, be amicably settled through consultation. (2) If a dispute between the Parties cannot thus be settled within a period of six months, it shall upon the request of either Party be submitted to an arbitral tribunal. (3) Such an arbitral tribunal shall be constituted for each individual case in the following way. Within two months of the receipt of the request for arbitration, each Party shall appoint one member of the tribunal. Those two members shall then select a national of a third State who on approval by the Parties shall be appointed Chairman of the tribunal. The Chairman shall be appointed within two months from the date of appointment of the other two members. (4) If within the periods specified in paragraph (3) of this article the necessary appointments have not been made, either Party may, in the absence of any other agreement, invite the Chairman of the International Court of Arbitration of the International Chamber of Commerce to make any necessary appointments. If the Chairman is a national of either Party or if he is otherwise prevented from discharging the said function, the Vice-Chairman shall be invited to make the necessary appointments. If the Vice-Chairman is a national of either Party or if he too is prevented from discharging the said function, the Member of the International Court of Arbitration of the International Chamber of Commerce next in seniority who is not a national of either Party shall be invited to make the necessary appointments. (5) The arbitral tribunal shall reach its award by a majority of votes. Each Party shall bear the costs of its own member of the tribunal and of its representation in the arbitral proceedings; the costs of the Chairman and remaining costs shall be borne in equal parts by the Parties. The tribunal may, however, in its award direct that a highter proportion of this costs shall be borne by one of the two Parties. The tribunal shall determine its own procedure. This award shall be final and binding on the Parties.

  • Information Concerning the Company i. The undersigned has reviewed a copy of the Form C. With respect to information provided by the Company, the undersigned has relied solely on the information contained in the Form C to make the decision to purchase the Shares. ii. The undersigned understands and accepts that the purchase of the Shares involves various risks, including the risks outlined in the Form C and in this Subscription Agreement. The undersigned represents that it is able to bear any and all loss associated with an investment in the Shares. iii. The undersigned confirms that it is not relying and will not rely on any communication (written or oral) of the Company, Wefunder, or any of their respective affiliates, as investment advice or as a recommendation to purchase the Shares. The undersigned understands that information and explanations related to the terms and conditions of the Shares provided in the Form C or otherwise by the Company, Wefunder or any of their respective affiliates shall not be considered investment advice or a recommendation to purchase the Shares, and that neither the Company, Wefunder nor any of their respective affiliates is acting or has acted as an advisor to the undersigned in deciding to invest in the Shares. The undersigned acknowledges that neither the Company, Wefunder nor any of their respective affiliates have made any representation regarding the proper characterization of the Shares for purposes of determining the undersigned's authority or suitability to invest in the Shares. iv. The undersigned is familiar with the business and financial condition and operations of the Company, all as generally described in the Form C. The undersigned has had access to such information concerning the Company and the Shares as it deems necessary to enable it to make an informed investment decision concerning the purchase of the Shares. v. The undersigned understands that, unless the undersigned notifies the Company in writing to the contrary at or before the Closing, each of the undersigned's representations and warranties contained in this Subscription Agreement will be deemed to have been reaffirmed and confirmed as of the Closing, taking into account all information received by the undersigned. vi. The undersigned acknowledges that the Company has the right in its sole and absolute discretion to abandon this offering at any time prior to the completion of the offering. This Subscription Agreement shall thereafter have no force or effect and the Company shall return any previously paid subscription price of the Shares, without interest thereon, to the undersigned. vii. The undersigned understands that no federal or state agency has passed upon the merits or risks of an investment in the Shares or made any finding or determination concerning the fairness or advisability of this investment. viii. The Undersigned has up to 48 hours before the campaign end date to cancel the purchase and get a full refund.

  • Settlement of Disputes between Contracting Parties 1. Should any dispute arise concerning the interpretation or application of this Agreement the Contracting Parties shall try to settle the dispute amicably. 2. If the dispute cannot be settled in a such manner it shall, upon the request of either Contracting Party, be submitted to an ad hoc Arbitral Tribunal in accordance with the provisions of this Article. 3. The Arbitral Tribunal shall be constituted in the following way: within two months of the receipt of the request for arbitration, each Contracting Party shall appoint one arbitrator. The two arbitrators will choose a national of a third State who, on the approval by the two Contracting Parties, shall act as chairman of the Tribunal (hereinafter referred to as "the Chairman"). The Chairman shall be appointed within two months from the date of appointment of the other two arbitrators. 4. If within the period specified in paragraph 3 of this Article either Contracting Party shall not have appointed its arbitrator or the two arbitrators shall not have agreed on the chairman, a request may be made to the President of the International Court of Justice to make the appointment. If he is a national of either Contracting Party or if he is otherwise prevented from discharging the said function, the Vice-President shall be invited to make the appointment. If the Vice-President also is a national of either Contracting Party or is prevented from discharging the said function, the member of the International Court of Justice next in seniority who is not a national of either Contracting Party shall be invited to make the appointment. 5. The Arbitral Tribunal shall reach its decision by a majority of votes, such decision shall be final and binding. Each contracting Party shall bear the costs of its own arbitrator and its counsel in the arbitral proceedings, the costs of the chairman and the remaining costs shall be borne in equal parts by both Contracting Parties. The Tribunal may, however, in its decision direct that a higher proportion of costs shall be borne by one of the two Contracting Parties. The Arbitral Tribunal shall determine its own procedure.

  • Interpretation of This Agreement All decisions and interpretations made by the Committee with regard to any question arising hereunder or under the Plans shall be binding and conclusive upon the Company and the Employee. If there is any inconsistency between the provisions of this Agreement and the Plans, the provisions of the Plans shall govern.

  • Matters Involving Third Parties (i) If any third party shall notify any Party (the “Indemnified Party”) with respect to any matter (a “Third Party Claim”) which may give rise to a claim for indemnification against any other Party (the “Indemnifying Party”) under this Article VIII, then the Indemnified Party shall promptly notify each Indemnifying Party thereof in writing; provided, however, that no delay on the part of the Indemnified Party in notifying any Indemnifying Party shall relieve the Indemnifying Party from any obligation hereunder unless (and then solely to the extent) the Indemnifying Party thereby is prejudiced. (ii) Any Indemnifying Party will have the right to defend the Indemnified Party against the Third Party Claim with counsel of its choice satisfactory to the Indemnified Party so long as (A) the Indemnifying Party notifies the Indemnified Party in writing within ten (10) days after the Indemnified Party has given notice of the Third Party Claim that the Indemnifying Party will indemnify the Indemnified Party from and against the entirety of any Adverse Consequences the Indemnified Party may suffer resulting from, arising out of, relating to, in the nature of, or caused by the Third Party Claim, (B) the Indemnifying Party provides the Indemnified Party with evidence acceptable to the Indemnified Party that the Indemnifying Party will have the financial resources to defend against the Third Party Claim and fulfill its indemnification obligations hereunder, (C) the Third Party Claim involves only money damages and does not seek an injunction or other equitable relief, (D) settlement of, or an adverse judgment with respect to, the Third Party Claim is not, in the good faith judgment of the Indemnified Party, likely to establish a precedential custom or practice adverse to the continuing business interests of the Indemnified Party, and (E) the Indemnifying Party conducts the defense of the Third Party Claim actively and diligently. (iii) So long as the Indemnifying Party is conducting the defense of the Third Party Claim in accordance with Section 8.4(ii) hereof, (A) the Indemnified Party may retain separate co-counsel at its sole cost and expense and participate in the defense of the Third Party Claim, (B) the Indemnified Party will not consent to the entry of any judgment or enter into any settlement with respect to the Third Party Claim without the prior written consent of the Indemnifying Party, and (C) the Indemnifying Party will not consent to the entry of any judgment or enter into any settlement with respect to the Third Party Claim without the prior written consent of the Indemnified Party. (iv) In the event any of the conditions in Section 8.4(ii) hereof is or becomes unsatisfied, however, (A) the Indemnified Party may defend against, and consent to the entry of any judgment or enter into any settlement with respect to, the Third Party Claim in any manner it may deem appropriate (and the Indemnified Party need not consult with, or obtain any consent from, any Indemnifying Party in connection therewith), (B) the Indemnifying Parties will reimburse the Indemnified Party promptly and periodically for the costs of defending against the Third Party Claim (including reasonable attorneys’ fees and expenses), and (C) the Indemnifying Parties will remain responsible for any Adverse Consequences the Indemnified Party may suffer resulting from, arising out of, relating to, in the nature of, or caused by the Third Party Claim to the fullest extent provided in this Article VIII.

  • Vendor’s Resellers as Related to This Agreement Vendor’s Named Resellers (“Resellers”) under this Agreement shall comply with all terms and conditions of this agreement and all addenda or incorporated documents. All actions related to sales by Authorized Vendor’s Resellers under this Agreement are the responsibility of the awarded Vendor. If Resellers fail to report sales to TIPS under your Agreement, the awarded Vendor is responsible for their contractual failures and shall be billed for the fees. The awarded Vendor may then recover the fees from their named reseller. If there is a dispute between the awarded Vendor and TIPS Member, TIPS or its representatives may, at TIPS sole discretion, assist in conflict resolution if requested by either party. TIPS, or its representatives, reserves the right to inspect any project and audit the awarded Vendor’s TIPS project files, documentation and correspondence related to the requesting TIPS Member’s order. If there are confidentiality requirements by either party, TIPS shall comply to the extent permitted by law. The TIPS Solicitation which resulted in this Vendor Agreement, whether a Request for Proposals, the Request for Competitive Sealed Proposals or Request for Qualifications solicitation, or other, the Vendor’s response to same and all associated documents and forms made part of the solicitation process, including any addenda, are hereby incorporated by reference into this Agreement as if copied verbatim. THE SECTON HEADERS OR TITLES WITHIN THIS DOCUMENT ARE MERELY GUIDES FOR CONVENIENCE AND ARE NOT FOR CLASSIFICATION OR LIMITING OF THE RESPONSIBILITES OF THE PARTIES TO THIS DOCUMENT. Texas governmental entities are prohibited from doing business with companies that fail to certify to this condition as required by Texas Government Code Sec. 2270. By executing this agreement, you certify that you are authorized to bind the undersigned Vendor and that your company (1) does not boycott Israel; and (2) will not boycott Israel during the term of the Agreement. You certify that your company is not listed on and does not and will not do business with companies that are on the Texas Comptroller of Public Accounts list of Designated Foreign Terrorists Organizations per Texas Gov't Code 2270.0153 found at xxxxx://xxxxxxxxxxx.xxxxx.xxx/purchasing/docs/foreign-terrorist.pdf You certify that if the certified statements above become untrue at any time during the life of this Agreement that the Vendor will notify TIPS within three (3) business day of the change by a letter on Vendor’s letterhead from and signed by an authorized representative of the Vendor stating the non-compliance decision and the TIPS Agreement number and description at: Attention: General Counsel ESC Region 8/The Interlocal Purchasing System (TIPS) 0000 Xxxxxxx 000 Xxxxx Xxxxxxxxx, XX,00000 And by an email sent to xxxx@xxxx-xxx.xxx The undersigned Vendor agrees to maintain the below minimum insurance requirements for TIPS Contract Holders: When the Vendor or its subcontractors are liable for any damages or claims, the Vendor’s policy, when the Vendor is responsible for the claim, must be primary over any other valid and collectible insurance carried by the Member. Any immunity available to TIPS or TIPS Members shall not be used as a defense by the contractor's insurance policy. The coverages and limits are to be considered minimum requirements and in no way limit the liability of the Vendor(s). Insurance shall be written by a carrier with an A-; VII or better rating in accordance with current A.M. Best Key Rating Guide. Only deductibles applicable to property damage are acceptable, unless proof of retention funds to cover said deductibles is provided. "Claims made" policies will not be accepted. Vendor’s required minimum coverage shall not be suspended, voided, cancelled, non-renewed or reduced in coverage or in limits unless replaced by a policy that provides the minimum required coverage except after thirty (30) days prior written notice by certified mail, return receipt requested has been given to TIPS or the TIPS Member if a project or pending delivery of an order is ongoing. Upon request, certified copies of all insurance policies shall be furnished to the TIPS or the TIPS Member. • Orders: All Vendor orders received from TIPS Members must be emailed to TIPS at tipspo@tips- xxx.xxx. Should a TIPS Member send an order directly to the Vendor, it is the Vendor’s responsibility to forward a copy of the order to TIPS at the email above within 3 business days and confirm its receipt with TIPS. • Vendor Encouraging Members to bypass TIPS agreement: Encouraging TIPS Members to purchase directly from the Vendor or through another agreement, when the Member has requested using the TIPS cooperative Agreement or price, and thereby bypassing the TIPS Agreement is a violation of the terms and conditions of this Agreement and will result in removal of the Vendor from the TIPS Program. • Order Confirmation: All TIPS Member Agreement orders are approved daily by TIPS and sent to the Vendor. The Vendor should confirm receipt of orders to the TIPS Member (customer) within 3 business days. • Vendor custom website for TIPS: If Vendor is hosting a custom TIPS website, updated pricing when effective. TIPS shall be notified when prices change in accordance with the award.