Electrical elevators allowance Sample Clauses

Electrical elevators allowance. Electrical mechanics engaged on the erection of electrical elevators shall be paid 30c per hour in addition to their ordinary rates whilst so engaged.
AutoNDA by SimpleDocs

Related to Electrical elevators allowance

  • Site Allowance All new construction and extension/refurbishment work having a project value in excess of $2.0m will attract the then current City of Melbourne Site Allowance.

  • Electrical Provide drawings for the following systems:

  • Uniform Maintenance Allowance 22.1 The City provides uniforms or uniform allowance for employees represented by the Association. The City will continue to replace, repair and maintain uniforms worn in the line of duty. The average cost of the uniforms/uniform allowances are reported as special compensation (for those employees defined as “classic employees” by the Public Employees’ Pension Reform Act of 2013 for retirement calculation purposes and is currently reported as $17 per pay period.

  • Electrical Service Electrical service for new construction or a renovated existing building shall be 480/277-volt, 3-phase, 4-wire or approved equal. Service shall be sized for HVAC and other mechanical system(s) loads, lighting, general building services, and dedicated computer based office equipment loads. 5 xxxxx per square foot shall be provided for lighting and general service receptacles. Size of neutral conductor of 3- phase circuits shall be twice that of phase conductor to accommodate potential harmonic currents associated with computer system electronic power supplies and fluorescent lighting fixtures electronic ballasts. An adequately sized 3 phase “wye” wound step down transformer shall be provided to supply 208/120-volt, 3 phase power, for lighting, general service receptacles and dedicated computer based office equipment. Dedicated, isolated ground circuits shall be supplied from separate isolated ground power distribution panel(s). Lighting circuits shall be supplied from separate lighting panel(s). Panels shall have 20% spare capacity and be complete with 10% spare breakers of each size, but no less than 1 spare. No more than 4 duplex receptacles shall be connected to any single 20-amp dedicated isolated ground circuit or general service circuit.

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Mileage Allowance The state agrees to seek continued funding to provide for the payment of a mileage allowance for the use of privately owned vehicles for official travel at the rate provided in section 112.061(7)(d)1., F.S.

  • Cleaning Allowance The University will pay for the cleaning of Department issued uniforms and necessary work clothing requiring cleaning worn by employees assigned to non-uniformed positions.

  • Janitorial Services or Building Maintenance Services If this Agreement is for janitorial or building maintenance services, this section is applicable. If this Agreement requires Contractor to perform Services at a new site, Contractor shall retain for sixty (60) days all employees currently employed at that site by any previous contractor that performed the same services at the site. Contractor shall provide upon request information sufficient to identify employees providing janitorial or building maintenance services at each site and to make the necessary notifications required under Labor Code section 1060 et seq.

  • Maintenance and Repair – Line Sharing 3.6.1 C.M. shall have access for repair and maintenance purposes to any Loop for which it has access to the High Frequency Spectrum. If C.M. is using a BellSouth owned splitter, C.M. may access the Loop at the point where the combined voice and data signal exits the central office splitter via a bantam test jack. If C.M. provides its own splitter, it may test from the collocation space or the Termination Point.

Time is Money Join Law Insider Premium to draft better contracts faster.