CAISO ACA Charge The CAISO ACA Charge is the product of the Unitβs Billable MWh for the Billing Month and the applicable annual charge for short-term sales under 18 CFR Section 382.201 of the FERC Regulations. Schedule C Variable Cost Payment for All Conditions Part 5 for Biomass Generation Units For each month and each Unit, the Variable Cost Payment for Billable MWH from the Unit pursuant to Nonmarket Transaction during that Month shall be the amount calculated in accordance with the following formula: Variable Cost Payment = A.
Equipment Usage The equipment must remain in use for the specific project for which it was obtained in accordance with 2 CFR Β§ 200.313(c)(1), unless the provision in 2 CFR Β§ 200.313(c)(4) applies.
CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh π Steam Price ($/MWh) Where: β’ Steam Price is $16.34/MWh. β’ For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity π 8760 hours π 0.4) - (A+B+C) Where: β’ Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. β’ A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. β’ B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unitβs Availability remaining at zero after a period of ten Months during which the Unitβs Availability has been zero. β’ C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unitβs Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unitβs Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. β’ The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.
REPORT OF CONTRACT USAGE All fields of information shall be accurate and complete. The report is to be submitted electronically via electronic mail utilizing the template provided in Microsoft Excel 2003, or newer (or as otherwise directed by OGS), to the attention of the individual shown on the front page of the Contract Award Notification and shall reference the Group Number, Award Number, Contract Number, Sales Period, and Contractor's (or other authorized agent) Name, and all other fields required. OGS reserves the right to amend the report template without acquiring the approval of the Office of the State Comptroller or the Attorney General.
Utility Charges Tenant shall pay or cause to be paid all charges for electricity, power, gas, oil, water and other utilities used in connection with the Leased Property.
Monthly Charges Purchaser shall pay Seller monthly for the electric energy generated by the System and delivered to the Delivery Point at the $/kWh rate shown in Exhibit 1 (the βContract Priceβ). The monthly payment for such energy will be equal to the applicable $/kWh rate multiplied by the number of kWh of energy generated during the applicable month, as measured by the System meter.