ESAP 3 Project Description Sample Clauses

ESAP 3 Project Description. The Project Development Objective of ESAP3 is to support strengthening the SA system and mechanisms for enhanced service delivery in Ethiopia. ESAP3 is composed of three major project components: • Component 1 is the operational core of the project and includes the implementation and expansion of the SA tools and approach in kebeles and woredas. Component 1 includes 2 sub-components: o Grants to SAIPs to expand the uptake of SA to more woredas and kebeles. o Grants or technical assistance to SAIPs or other government or non- government organizations to undertake innovative activities including testing social accountability tools in new sub-sectors, linking non-basic service issues to other citizen engagement initiatives, or addressing social accountability issues at the regional level. • Component 2 is the area that this phase of the program places more emphasis on compared to previous phases of ESAP. It this phase based on the recognition that for SA to be sustainable it must be embedded within the overall institutions and systems of government through a longer-term process. Component 2 includes strengthening of the capacity of the SA system in Ethiopia including building capacity and strengthening structures for service delivery actors (including in the health, education, agriculture, rural roads, and water and sanitation sectors and in regional and woreda administrations), building links with Financial Transparency and Accountability (FTA) and Grievance Redress Mechanism (GRM) systems and mainstreaming SA in government and non-government institutions. • Component 3 is composed of the elements that support the management, the monitoring and evaluation, and the overall functioning of the project. ESAP3 will be rolled out over an overall 10-year strategy divided into two 5-year funding cycles. These ToRs cover the next 5-year cycle of the program and bidders are bidding only for the first 5 years of services.1 The timing and detailed activities are outlined further in the following sections. During this period, ESAP3 will extend and broaden the scope of ESAP2 by:
AutoNDA by SimpleDocs

Related to ESAP 3 Project Description

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • General Project Description 2. Substation location.

  • Contract Description The Description and Location of the Contract and related project(s) are as follows.

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 76L Single Lane / Level 2 76 0.00 Ending 0.48

  • Property Description A document prepared as an exhibit for the conveyance of a property interest, reflecting a boundary survey, signed and sealed by a Registered Professional Land Surveyor (RPLS), attached to an acquisition deed as Exhibit A, and consists of the following two (2) parts:

  • Project Location & Description The Project, for which the provision of financial assistance is the subject of this Agreement, is hereby described as follows:

  • Task Description This task includes activities associated with permit-required monitoring conducted in accordance with the conditions specified by state or federal regulatory agencies. All monitoring tasks must be located within or adjacent to the Project area and follow the Department’s Regional Coastal Monitoring Program and FWC's marine turtle and shorebird monitoring programs. Guidance for monitoring of nearshore resources is available in the Department's Standard Operation Procedures For Nearshore Hardbottom Monitoring Of Beach Nourishment Projects. The Local Sponsor must submit work products directly to the appropriate state or federal regulatory agencies in accordance with permit conditions to be eligible for reimbursement under this task, unless otherwise directed.

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Product Description The lead products covered by this Settlement Agreement is limited to following Amazon Identification Number (ASIN) B0BBMRLNV9, with the description, "Lesnow 63-37 Tin Lead Rosin Core Solder Wire for Electrical Soldering 0.8mm Soldering Wire Electronics Solder Content Solder Flux 1.8% (0.8mm, 50g)," which was offered for sale by the Settling Entity on xxxxxx.xxx, hereinafter the “Product” or “Products.”

Time is Money Join Law Insider Premium to draft better contracts faster.