Excavation Stability Sample Clauses

Excavation Stability. If the temporary construction embankments are to be maintained during the rainy season (November 1 through April 15), berms shall be installed along the top of the embankments where necessary to prevent runoff from entering the excavation and eroding the excavation faces. The soils exposed in the excavations shall be inspected during excavation by qualified personnel from Geotechnologies, Inc. so that modifications could can be made if variations in the soil conditions occur. All excavations shall be stabilized for 30 days from the initial excavation. Water shall not be allowed to pond on top of the excavation or allowed to flow towards the excavation.
AutoNDA by SimpleDocs

Related to Excavation Stability

  • Construction Staking Contractor shall avoid careless or negligent damage to construction stakes, flags, or marks. If such damage occurs, Contractor shall be required to replace stakes necessary to construc- tion. Contractor’s replacement staking shall be approved by Forest Service. Alternatively, upon Contractor’s request, Contracting Officer may agree to perform such work under E.2.1.8. When A.7 shows that construction stakes are to be set by Forest Service after clearing, Contractor shall submit to Forest Service a written schedule for clearing, construction staking, and construction that will provide Forest Service a reasonable period for setting construction stakes. Time for setting construction stakes may be modified by written agreement. If Forest Service performs construction staking for Specified Roads, timing of such staking shall permit Contrac- tor’s clearing and other construction activity to proceed without hindrance or delay, provided Contractor’s construction activity is reasonably consistent with needs identified in Contractor’s Operating Schedule or amendments thereto. Should Forest Service be unable to perform construction staking in such reasonable period, upon written agree- ment, Contractor shall assume the responsibility for construction staking for agreed upon portions of Specified Roads. In such event, Contracting Officer shall revise:

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Construction Standards The Subrecipient and Developer shall ensure that all Approved Projects comply with the following requirements:

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Grading The coarse aggregate as delivered to the mixer, shall be well graded as per IS specifications. Maximum size of aggregate used for the work shall be 20mm or 40mm or as specified in items in the bill of quantities and it shall confirm to IS: 383-1970, clause 4.2 (Table-2) However, the exact gradation required to produce a dense concrete of specified strength and desired workability shall be decided as per laboratory test by the Engineer. Coarse aggregate for use in concrete shall be well graded and shall conform to IS: 383-1970 requirements (as per Table-II) given below: IS sieve Designation Percentage Passing by weight for graded aggregate of nominal size. 40mm 20mm 16mm 12.5mm 63mm 100 - - - 40mm 00-000 000 - - 20mm 00-00 00-000 100 - 16mm - - 00-000 000 12.5 - - - 90-100 10.00 00-00 00-00 00-00 00-00 4.75mm 0-5 0-10 0-10 0-10

  • PRODUCTION STANDARDS The Company may establish minimum production standards applicable to Representative.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.