Final Plan Review and Construction Monitoring Sample Clauses

Final Plan Review and Construction Monitoring. ▪ The Radio Tower Project Team geotechnical engineer should review final plans and specifications ▪ A qualified geotechnical engineer or construction engineer should observe: - Foundation subgrade prior to placement of footing form work - Rock anchor installation and performance testing if rock anchors are used, and - Placement and compaction of backfill soils around the perimeter and/or the top of the tower foundation ▪ The radio tower shop drawings should be reviewed by the Maine Department of Transportation (MaineDOT) structures group to verify that loading criteria, load conditions, anchorage, performance criteria, and required factors of safety (FS) conform to current radio tower structural standards.
AutoNDA by SimpleDocs
Final Plan Review and Construction Monitoring. We recommend that the Radio Tower Project Team geotechnical engineer review the final drawings and specifications to confirm that the earthwork and foundation recommendations are properly interpreted and implemented in the design and specifications. We also recommend that a qualified geotechnical engineer or construction engineer observe and evaluate the following tower foundation construction phases: ▪ Foundation subgrade prior to placement of footing formwork ▪ Rock anchor installation and performance testing, if applicable, and ▪ Placement and compaction of backfill soils around the perimeter and/or the top of the tower foundation Finally, we recommend that the radio tower shop drawings be reviewed by the Maine Department of Transportation structures group to verify that loading criteria, load conditions, anchorage, performance criteria, and required FS conform to current radio tower structural standards.

Related to Final Plan Review and Construction Monitoring

  • SUPERVISION AND CONSTRUCTION PROCEDURES 4.3.1 The Contractor shall supervise and direct the Work, using his / her best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. All aspects of the Project shall be subject to the inspection and approval of the State. Contractor guarantees to repair, replace, re-execute or otherwise correct any defect in workmanship, materials, or the like that fails to conform to the requirements of this Contract or that appears during the progress of the Work or within one year of final acceptance by the State.

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • COMPENSATION FOR CONSTRUCTION PHASE SERVICES 5.1 For the Construction Manager’s performance of the Work as described in Section 2.3, the Owner shall pay the Construction Manager the Contract Sum in current funds. The Contract Sum is the Cost of the Work as defined in Section 6.1.1 plus the Construction Manager’s Fee.

  • Review and Selection Process The Project Narratives of SAMHSA applications are peer-reviewed according to the evaluation criteria listed above. Decisions to fund a grant are based on the strengths and weaknesses of the application as identified by peer reviewers. The results of the peer review are advisory in nature. The program office and approving official make the final determination for funding based on the following: • Individual awards over $250,000 are approved by the Center for Mental Health Services National Advisory Council; • Availability of funds; • Equitable distribution of awards in terms of geography (including urban, rural, and remote settings) and balance among populations of focus and program size; • Submission of any required documentation that must be submitted prior to making an award; and • SAMHSA is required to review and consider any information about your organization that is in the Federal Award Performance and Integrity Information System (FAPIIS). In accordance with 45 CFR 75.212, SAMHSA reserves the right not to make an award to an entity if that entity does not meet the minimum qualification standards as described in section 75.205(a)(2). If SAMHSA chooses not to award a fundable application in accordance with 45 CFR 75.205(a)(2), SAMHSA must report that determination to the designated integrity and performance system accessible through the System for Award Management (XXX) [currently, FAPIIS]. You may review and comment on any information about your organization that a federal awarding agency previously entered. XXXXXX will consider your comments, in addition to other information in FAPIIS in making a judgment about your organization’s integrity, business ethics, and record of performance under federal awards when completing the review of risk posed as described in 45 CFR 75.205 HHS Awarding Agency Review of Risk by Applicants.

  • Ongoing Review and Revisions As set forth in Section 35.7, the Parties have agreed to the coordination and exchange of data and information under this Agreement to enhance system reliability and efficient market operations as systems exist and are contemplated as of the Effective Date. The Parties expect that these systems and the technology applicable to these systems and to the collection and exchange of data will change from time to time throughout the term of this Agreement. The Parties agree that the objectives of this Agreement can be fulfilled efficiently and economically only if the Parties, from time to time, review and, as appropriate, revise the requirements stated herein in response to such changes, including deleting, adding, or revising requirements and protocols. Each Party will negotiate in good faith in response to such revisions the other Party may propose from time to time. Nothing in this Agreement, however, shall require any Party to reach agreement with respect to any such changes, or to purchase, install, or otherwise implement new equipment, software, or devices, or functions, except as required to perform this Agreement.

  • Project Review A. Programmatic Allowances

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.