Fuel cell vehicles Sample Clauses

Fuel cell vehicles. If the minimum isolation resistance requirement cannot be maintained over time, then protection shall be achieved by any of the following: (a) Double or more layers of solid insulators, barriers or enclosures that meet the requirement in paragraph 5. 1.1. independently; (b) On-board isolation resistance monitoring system together with a warning to the driver if the isolation resistance drops below the minimum required value. The isolation resistance between the high voltage bus of the coupling system for charging the REESS, which is not energized besides during charging the REESS, and the electrical chassis need not be monitored. The function of the on-board isolation resistance monitoring system shall be confirmed as described in Annex 5.
Fuel cell vehicles. If the minimum isolation resistance requirement cannot be maintained over time, then protection shall be achieved by any of the following: (a) Double or more layers of solid insulators, barriers or enclosures that meet the requirement in paragraph 5.1.1. independently; Public Comment Only (b) On-board isolation resistance monitoring system together with a warning to the driver if the isolation resistance drops below the minimum required value. The isolation resistance between the high voltage bus of the coupling system for charging the REESS and the electrical chassis need not be monitored, because the coupling system for charging is only energized during charging of the REESS. The function of the on-board isolation resistance monitoring system shall be confirmed as described in Annex 5.

Related to Fuel cell vehicles

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Vehicles If an employee is required to use their own automobile in the performance of their duties, the Employer shall ensure that the position posting or advertisement shall include this requirement.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.

  • Stored equipment We accept no responsibility for any stored equipment or other property brought on to or left at the premises, and all liability for loss or damage is hereby excluded. All equipment and other property (other than stored equipment) must be removed at the end of each hiring or we will charge fees each day or part of a day at the hire fee per hiring until the same is removed. We may, in our discretion, dispose of any items referred to below by sale or otherwise on such terms and conditions as we think fit, and charge you any costs we incur in storing and selling or otherwise disposing of the same, in any of the following circumstances: (i) your failure either to pay any charges in respect of stored equipment due and payable or to remove the same within seven days after the agreed storage period has ended (ii) your failure to dispose of any property brought on to the premises for the purposes of the hiring.

  • Aircraft This peril includes self-propelled missiles and spacecraft.