Isolation resistance Sample Clauses

Isolation resistance. This paragraph shall not apply to electrical circuits that are galvanically connected to each other, where the DC part of these circuits is connected to the electrical chassis and the specific voltage condition is fulfilled. 5.1.3.1. Electric power train consisting of separate Direct Current- or Alternating Current-buses If AC high voltage buses and DC high voltage buses are galvanically isolated from each other, isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/volt of the working voltage for DC buses, and a minimum value of 500 Ω/volt of the working voltage for AC buses. The measurement shall be conducted according to Annex 5A "Isolation resistance measurement method for vehicle based tests". 5.1.3.2. Electric power train consisting of combined DC- and AC-buses If AC high voltage buses and DC high voltage buses are galvanically connected, isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 500 Ω/volt of the working voltage. However, if all AC high voltage buses are protected by one of the two following measures, isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/V of the working voltage: (a) At least two or more layers of solid insulators, electrical protection barriers or enclosures that meet the requirement in paragraph 5. 1.1. independently, for example wiring harness; (b) Mechanically robust protections that have sufficient durability over vehicle service life such as motor housings, electronic converter cases or connectors; The isolation resistance between the high voltage bus and the electrical chassis may be demonstrated by calculation, measurement or a combination of both. The measurement shall be conducted according to Annex 5A "Isolation resistance measurement method for vehicle based tests". 5.1.3.3. Fuel cell vehicles In fuel cell vehicles, DC high voltage buses shall have an on-board isolation resistance monitoring system together with a warning to the driver if the isolation resistance drops below the minimum required value of 100 Ω/V. The function of the on-board isolation resistance monitoring system shall be confirmed as described in Annex 6. The isolation resistance between the high voltage bus of the coupling system for charging the REESS, which is not energized in conditions other than that during the charging of the REESS, and the electrical chassis need no...
AutoNDA by SimpleDocs
Isolation resistance. If the electrical circuit divided by the disconnect function includes AC circuit, this part of the high voltage bus shall be considered as an AC high voltage bus. If the electrical circuit divided by the disconnect function doesn't include AC circuit, this part of the high voltage bus shall be considered as a DC high voltage bus. For AC high voltage buses, isolation resistance between the high voltage bus and the electrical chassis shall have minimum value of 500 ohms/volt of working voltage. If the protection degree IPXXB is satisfied for AC portion of the high voltage buses after crash, isolation resistance between the high voltage bus and the electrical chassis shall have minimum value of 100 ohms/volt of working voltage. For DC high voltage buses, isolation resistance between any high voltage bus and the electrical chassis shall have minimum value of 100 ohms/volt of working voltage.
Isolation resistance. 5.1.3.1. Electric power train consisting of separate Direct Current- or Alternating Current-buses If AC high voltage buses and DC high voltage buses are galvanically isolated from each other, isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/volt of the working voltage for DC buses, and a minimum value of 500 Ω/volt of the working voltage for AC buses. The measurement shall be conducted according to Annex 4A "Isolation resistance measurement method for vehicle based tests". 5.1.3.2. Electric power train consisting of combined DC- and AC-buses If AC high voltage buses and DC high voltage buses are galvanically connected isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 500 Ω/volt of the working voltage. However, if all AC high voltage buses are protected by one of the 2 following measures, isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/V of the working voltage: (a) Double or more layers of solid insulators, barriers or enclosures that meet the requirement in paragraph 5.1.1. independently, for example wiring harness; (b) Mechanically robust protections that have sufficient durability over vehicle service life such as motor housings, electronic converter cases or connectors; The isolation resistance between the high voltage bus and the electrical chassis may be demonstrated by calculation, measurement or a combination of both. The measurement shall be conducted according to Annex 4A "Isolation resistance measurement method for vehicle based tests".
Isolation resistance. This paragraph shall not apply to electrical circuits that are galvanically connected to each other, where the DC part of these circuits is connected to the electrical chassis and the specific voltage condition is fulfilled."
Isolation resistance. 5.5.1.4.1 Electric power train consisting of separate DC- or AC-buses If AC high voltage buses and DC high voltage buses are galvanically isolated from each other, isolation resistance 5.5.1.4.2 Electric power train consisting of combined DC- and AC-buses If AC high voltage buses and DC high voltage buses are galvanically connected isolation resistance between the high
Isolation resistance. This paragraph shall not apply to chassis connected electrical circuits where the maximum voltage between any live part and the electrical chassis or any exposed conductive part does not exceed 30 V AC (rms) or 60 V DC. 5.1.3.1. Electric power train consisting of separate Direct Current- or Alternating Current-buses Public Comment If AC buses and DC buses are galvanically isolated from each other, the isolation resistance between the high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/V of the working voltage for DC buses, and a minimum value of 500 Ω/V of the working voltage for AC buses. The measurement shall be conducted according to Annex 4A "Isolation resistance measurement method for vehicle based tests". 5.1.3.2. Electric power train consisting of combined DC- and AC-buses If AC buses and DC buses are galvanically connected, isolation resistance between any high voltage bus and the electrical chassis shall have a minimum value of 500 Ω/volt of the working voltage. However, if all AC high voltage buses are protected by one of the two following measures, isolation resistance between any high voltage bus and the electrical chassis shall have a minimum value of 100 Ω/V of the working voltage:
Isolation resistance. The isolation resistance between the high voltage bus and the electrical chassis may be demonstrated either by measurement or by a combination of measurement and calculation. The following instructions should be used if the isolation resistance is demonstrated by measurement. Measure and record the voltage (Vb) between the negative and the positive side of the high voltage bus (see figure 1); Measure and record the voltage (V1) between the negative side of the high voltage bus and the electrical chassis (see figure 1); Measure and record the voltage (V2) between the positive side of the high voltage bus and the electrical chassis (see figure 1); If V1 is greater than or equal to V2, insert a standard known resistance (Ro) between the negative side of the high voltage bus and the electrical chassis. With Ro installed, measure the voltage (V1’) between the negative side of the high voltage bus and the vehicle electrical chassis (see figure 3). Calculate the isolation resistance (Ri) according to the formula shown below. Ri = Ro*(Vb/V1’ – Vb/V1) or Ri = Ro*Vb*(1/V1’ – 1/V1) Divide the result Ri, which is the electrical isolation resistance value in ohm (Ω), by the working voltage of the high voltage bus in volt (V). Ri (Ω / V) = Ri (Ω) / Working voltage (V) Figure 3 Measurement of V1' If V2 is greater than V1, insert a standard known resistance (Ro) between the positive side of the high voltage bus and the electrical chassis. With Ro installed, measure the voltage (V2’) between the positive side of the high voltage bus and the electrical chassis (see figure 4). Calculate the isolation resistance (Ri) according to the formula shown below. Ri = Ro*(Vb/V2’ – Vb/V2) or Ri = Ro*Vb*(1/V2’ – 1/V2) Divide the result Ri, which is the electrical isolation resistance value in ohm (Ω), by the working voltage of the high voltage bus in volt (V). Ri (Ω / V) = Ri (Ω) / Working voltage (V) Figure 4 Measurement of V2' Note 1: The standard known resistance Ro (in Ω) should be the value of the minimum required isolation resistance (Ω/V) multiplied by the working voltage (V) of the vehicle plus/minus 20 per cent. Ro is not required to be precisely this value since the equations are valid for any Ro; however, a Ro value in this range should provide a good resolution for the voltage measurements.
AutoNDA by SimpleDocs

Related to Isolation resistance

  • Screening After you sign and date the consent document, you will begin screening. The purpose of the screening is to find out if you meet all of the requirements to take part in the study. Procedures that will be completed during the study (including screening) are described below. If you do not meet the requirements, you will not be able to take part in the study. The study investigator or study staff will explain why. As part of screening, you must complete all of the items listed below: • Give your race, age, gender, and ethnicity • Give your medical history o You must review and confirm the information in your medical history questionnaire • Give your drug, alcohol, and tobacco use history • Give your past and current medication and treatment history. This includes any over-the-counter or prescription drugs, such as vitamins, dietary supplements, or herbal supplements, taken in the past 28 days • Height and weight will be measured • Physical exam will be done • Electrocardiogram (ECG) will be collected. An ECG measures the electrical activity of the heart • You may be tested for COVID-19 o Blood tests for human immunodeficiency virus (HIV), hepatitis B, and hepatitis C o Blood tests to see how your blood clots ▪ Fibrinogen ▪ PT/INR/aPTT o Blood tests for amylase and lipase (enzymes that help with digestion, Part B only) o Blood tests for a lipid (fats) panel (Part B only) ▪ Total cholesterol ▪ Triglycerides ▪ HDL ▪ Direct HDL o Blood tests to check your thyroid function (Part B and Part C only) ▪ TSH ▪ Free T4 o Urine to test for drugs of abuse (illegal and prescription) o Urine tests to check your albumin/ creatinine ratio o Females who have not had a period for at least 12 months in a row will have a blood hormone test to confirm they cannot have children • The study investigator may decide to do an alcohol breath test • The use of proper birth control will be reviewed (males only) • You will be asked “How do you feel?” HIV, hepatitis B, and hepatitis C will be tested at screening. If anyone is exposed to your blood during the study, you will have these tests done again. If you have a positive test, you cannot be in or remain in the study. HIV is the virus that causes acquired immunodeficiency syndrome (AIDS). If your HIV test is positive, you will be told about the results. It may take weeks or months after being infected with HIV for the test to be positive. The HIV test is not always right. Having certain infections or positive test results may have to be reported to the State Department of Health. This includes results for HIV, hepatitis, and other infections. If you have any questions about what information is required to be reported, please ask the study investigator or study staff. Although this testing is meant to be private, complete privacy cannot be guaranteed. For example, it is possible for a court of law to get health or study records without your permission.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Intrusion Detection All systems involved in accessing, holding, transporting, and protecting DHCS PHI or PI that are accessible via the Internet must be protected by a comprehensive intrusion detection and prevention solution.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act. (B) All classes covered by this Agreement are designated special risk classes for drug testing purposes. Special risk means employees who are required as a condition of employment to be certified under Chapter 633 or Chapter 943, F.S. (C) An employee shall have the right to grieve any disciplinary action taken under section 112.0455, the Drug-Free Workplace Act, subject to the limitations on the grievability of disciplinary actions in Article 10. If an employee is not disciplined but is denied a demotion, reassignment, or promotion as a result of a positive confirmed drug test, the employee shall have the right to grieve such action in accordance with Article 6.

  • Subprocessing The data importer shall not subcontract any of its processing operations performed on behalf of the data exporter under the Clauses without the prior written consent of the data exporter. Where the data importer subcontracts its obligations under the Clauses, with the consent of the data exporter, it shall do so only by way of a written agreement with the subprocessor which imposes the same obligations on the subprocessor as are imposed on the data importer under the Clauses. Where the subprocessor fails to fulfil its data protection obligations under such written agreement the data importer shall remain fully liable to the data exporter for the performance of the subprocessor's obligations under such agreement.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!