GAS TURBINE. The gas turbine located on the GPS Site shall be regulated on the following basis— (a) The height of the chimney shall be not less than 10m above ground level. (b) The sulphur content of fuel oil burnt in the turbine is not to exceed 1.8% by weight.
AutoNDA by SimpleDocs
GAS TURBINE. 8.2.3.1 Utility Test shall be performed at the gas turbine manufacturer rating for continuous service which is normally designated as "base firing mode" for a dry low NO(SUB.x) combustion system without gas turbine diluent injection for NO(SUB.x) control. 8.2.3.2 Capacity corrections curves shall be provided to adjust for the effects of compressor inlet temperature and barametric pressure 8.2.3.3 The tests will be performed after the gas turbine Unit reaches steady state condition. The Unit will be considered in a steady state condition when turbine exhaust temperature does not change by more than 5 DEG.F in fifteen minutes prior to test. 8.2.3.4 The effect of relative humidity on turbine performance will be neglected, except for the effect on compressor inlet temperature. 8.2.3.5 No adjustment shall be made for inlet or exhaust pressure drop. 8.2.3.6 The measured value of barometric pressure shall be corrected for temperature if required by measuring device. The recorded pressure shall then be compared to the standard conditions for determining the capacity correction factor. Only the gas turbine output will be corrected for barometric pressure. 8.2.3.7 Compressor inlet temperature shall be measured with the permanently installed compressor inlet thermocouple or RTD's. Four (4) measuring devices shall be in service.
GAS TURBINE. General Electric Frame 7FA heavy-duty, single-shaft gas turbine generator units and auxiliary equipment as described in Exhibit H. CT stacks and silencers shall be provided by the Contractor.
GAS TURBINE. MEASUREMENT VALUE --------------------------------------------------------------------------------------------- Type Heavy duty --------------------------------------------------------------------------------------------- Stages 3 --------------------------------------------------------------------------------------------- Configuration Single shaft, 2 bearing --------------------------------------------------------------------------------------------- Operating speed 3600 rpm --------------------------------------------------------------------------------------------- Critical speeds --------------------------------------------------------------------------------------------- First rpm --------------------------------------------------------------------------------------------- Laterial 1154 --------------------------------------------------------------------------------------------- Torsional 1309 --------------------------------------------------------------------------------------------- Second rpm --------------------------------------------------------------------------------------------- Laterial 1212 --------------------------------------------------------------------------------------------- Torsional 7403 --------------------------------------------------------------------------------------------- Third rpm --------------------------------------------------------------------------------------------- Laterial 2066 --------------------------------------------------------------------------------------------- Torsional 10305 --------------------------------------------------------------------------------------------- Fourth rpm (laterial) 3044 --------------------------------------------------------------------------------------------- Fifth rpm (laterial) 3162 --------------------------------------------------------------------------------------------- Maximum tip speed 1615 fps --------------------------------------------------------------------------------------------- Trip speed --------------------------------------------------------------------------------------------- Electrical 3960 rpm --------------------------------------------------------------------------------------------- Maximum temperature 2420DEG.F --------------------------------------------------------------------------------------------- First stage rotor bucket material --------------------------------------------------------------------------------------------- Metal *DS-GTD-11...

Related to GAS TURBINE

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Gas If Customer has selected a Gas Fixed Rate, Customer’s Price will be based on the Fixed Rate(s), plus the Administration Charge, set forth in the Application, which includes RITERATE ENERGY’s compressor fuel and transportation charges, administrative and transaction costs and the Gas Balancing Amount and any Regulatory Charges (defined below).

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Water Supply The system may or may not meet state and local requirements. It is the right and responsibility of Buyer to determine the compliance of the system with state and local requirements. [For additional information on this subject, request the “Water Supply and Waste Disposal Notification” form.]

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Interconnection 2.1 This section applies to linking with suppliers providing public telecommunications transport networks or services in order to allow the users of one supplier to communicate with users of another supplier and to access services provided by another supplier, where specific commitments are undertaken.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Natural Gas 21.1 Subject to Article 21.2, the Indian domestic market shall have the first call on the utilisation of Natural Gas discovered and produced from the Contract Area. Accordingly, any proposal by the Contractor relating to Discovery and production of Natural Gas from the Contract Area shall be made in the context of the Government's policy for the utilisation of Natural Gas and shall take into account the objectives of the Government to develop its resources in the most efficient manner and to promote conservation measures. 21.2 The Contractor shall have the right to use Natural Gas produced from the Contract Area for the purpose of Petroleum Operations including reinjection for pressure maintenance in Oil Fields, gas lifting and captive power generation required for Petroleum Operations. 21.3 For the purpose of sales in the domestic market pursuant to this Article 21, the Contractor shall have freedom to market the Gas and sell its entitlement.

  • Gas Contracts No Credit Party, as of the date hereof or as disclosed to the Administrative Agent in writing, (a) is obligated in any material respect by virtue of any prepayment made under any contract containing a “take-or-pay” or “prepayment” provision or under any similar agreement to deliver Hydrocarbons produced from or allocated to any of the Borrower’s and its Subsidiaries’ Oil and Gas Properties at some future date without receiving full payment therefor at the time of delivery or (b) except as has been disclosed to the Administrative Agent, has produced gas, in any material amount, subject to balancing rights of third parties or subject to balancing duties under Legal Requirements.