GAS TURBINE Sample Clauses

GAS TURBINE. The gas turbine located on the GPS Site shall be regulated on the following basis—
AutoNDA by SimpleDocs
GAS TURBINE. Six (6) General Electric Frame 7FA heavy-duty, single-shaft gas turbine generator units and auxiliary equipment as described in Exhibit H. CT stacks and silencers shall be provided by the Contractor.
GAS TURBINE. MEASUREMENT VALUE --------------------------------------------------------------------------------------------- Type Heavy duty --------------------------------------------------------------------------------------------- Stages 3 --------------------------------------------------------------------------------------------- Configuration Single shaft, 2 bearing --------------------------------------------------------------------------------------------- Operating speed 3600 rpm --------------------------------------------------------------------------------------------- Critical speeds --------------------------------------------------------------------------------------------- First rpm --------------------------------------------------------------------------------------------- Laterial 1154 --------------------------------------------------------------------------------------------- Torsional 1309 --------------------------------------------------------------------------------------------- Second rpm --------------------------------------------------------------------------------------------- Laterial 1212 --------------------------------------------------------------------------------------------- Torsional 7403 --------------------------------------------------------------------------------------------- Third rpm --------------------------------------------------------------------------------------------- Laterial 2066 --------------------------------------------------------------------------------------------- Torsional 10305 --------------------------------------------------------------------------------------------- Fourth rpm (laterial) 3044 --------------------------------------------------------------------------------------------- Fifth rpm (laterial) 3162 --------------------------------------------------------------------------------------------- Maximum tip speed 1615 fps --------------------------------------------------------------------------------------------- Trip speed --------------------------------------------------------------------------------------------- Electrical 3960 rpm --------------------------------------------------------------------------------------------- Maximum temperature 2420DEG.F --------------------------------------------------------------------------------------------- First stage rotor bucket material --------------------------------------------------------------------------------------------- Metal *DS-GTD-11...
GAS TURBINE. 8.2.3.1 Utility Test shall be performed at the gas turbine manufacturer rating for continuous service which is normally designated as "base firing mode" for a dry low NO(SUB.x) combustion system without gas turbine diluent injection for NO(SUB.x) control.

Related to GAS TURBINE

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Gas Contracts No Credit Party, as of the date hereof or as disclosed to the Administrative Agent in writing, (a) is obligated in any material respect by virtue of any prepayment made under any contract containing a “take-or-pay” or “prepayment” provision or under any similar agreement to deliver Hydrocarbons produced from or allocated to any of the Borrower’s and its Subsidiaries’ Oil and Gas Properties at some future date without receiving full payment therefor at the time of delivery or (b) except as has been disclosed to the Administrative Agent, has produced gas, in any material amount, subject to balancing rights of third parties or subject to balancing duties under Legal Requirements.

  • Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges. Customer understands and agrees that included in the Administration Charge is the cost of the Energy Balancing Amount (defined below). Customer understands that in order for RITERATE ENERGY to be able to supply Energy to its existing and prospective customers, RITERATE ENERGY enters into supply arrangements to meet the forecasted consumption of its various groups of customers. These forecasts are based on historical data, load shapes and/or estimates. To the extent that actual pooled consumption of RITERATE ENERGY’s Energy customers varies from supply arrangements and/or Customer’s Utility delivery requirements, RITERATE ENERGY incurs a cost in balancing and settling its supply arrangements with such pooled consumption. To ensure a fixed all-inclusive Rate, RITERATE ENERGY has included in the Administration charge, the Energy Balancing Amount, to balance and settle the variance between pooled consumption and supply arrangements (the “Energy Balancing Amount”). In respect of Electricity, Customer understands that there are certain estimated pass through costs, made up of charges to RITERATE ENERGY by the PJM Interconnection (“PJM”) and/or Customer’s Utility, including but not limited to ancillary service charges, the cost of unaccounted for electricity, capacity charges and any replacement or recharacterization of these charges. In this regard, the “PJM Adjustment”, is included in the Fixed Price Rate. Customer acknowledges and agrees that by entering into this Agreement, Customer will not be eligible to receive any net metering credits and other incentives to which Customer would otherwise be entitled. Further, included in the Rate are the amounts charged or billed to RITERATE ENERGY or Customer by Customer’s Utility, the PUC or any other regulatory or government entity, including any taxes, delivery, regulated transmission, regulated distribution, pipeline, compressor fuel, uplift, congestion, locational marginal pricing, invoice market participant, service, billing, or similar or related changes and any, deposits, interest or late payment fees or other amounts in connection with the supply and delivery of Energy to the Premises (collectively, “Regulatory Charges”). Customer agrees to pay the monthly Administration charge for Energy supply (the “Administration” charge).

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

Time is Money Join Law Insider Premium to draft better contracts faster.