GMP Review Negotiation (Design-Build Sample Clauses

GMP Review Negotiation (Design-Build. The Project Management Contractor shall use its best efforts to cause the design-build contractor to submit a GMP proposal in a timely manner and in accordance with the terms of the contract between the design-build contractor and the Department. Once such proposal is submitted, the Project Management Contractor shall review the proposal for completeness and compliance with the applicable contractual requirements and submit a report outlining the results of such review. Among other things, the Contractor shall: (i) review the bid tabs for completeness, to verify that any bid leveling is consistent and appropriate, and to verify that adequate competition was achieved in the subcontracting process; (ii) review any assumptions, clarifications or exclusions contained within the GMP proposal to ensure that the GMP covers the scope contemplated by the Department and the Client Agency; and (iii) verify that pricing is consistent with then current market conditions. The Project Management Contractor shall assist the DGS Project Manager in negotiating any necessary adjustments to the GMP. The DGS Project Manager, in consultation with the Client Agency, shall determine whether the GMP is to be accepted.
AutoNDA by SimpleDocs

Related to GMP Review Negotiation (Design-Build

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • REVIEW OF WORK The Consultant shall permit the City, its agents and/or employees to review, at any time, all work performed pursuant to the terms of this Agreement at any stage of the work;

  • Project Review A. Programmatic Allowances

  • Preparatory Contract Negotiations Meetings Where operational requirements permit, the Employer will grant leave without pay to an employee to attend preparatory contract negotiations meetings.

  • Design Review At appropriate stages of design, documented reviews of the design results shall be planned and conducted. Participants at each Design Review shall include representatives of all functions concerned with the design stage being reviewed, as well as other specialist personnel, as required. Records of such reviews shall be maintained. Any computer software used to perform alternative calculations or verify clearances through the use of scale models or computer-aided design and drafting (CADD) techniques shall be validated before the use of the application, with validation documented in accordance with Section 2.2.15. In addition, at each submittal to IFA for review, Developer shall provide hand calculations that validate any calculations performed by computer software.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

Time is Money Join Law Insider Premium to draft better contracts faster.