Guardrail. When the removal and installation of guardrail is required as a part of the work the following time restrictions shall apply unless modified by the special conditions: MULTI-LANE HIGHWAYS: From the time that the existing guardrail or temporary positive barrier protection is removed the Contractor has fourteen (14) calendar days to install the new guardrail and anchors. During the interim, the location without guardrail shall be protected with drums spaced at a maximum spacing of twenty (20’) feet. The maximum length of rail that can be removed at any time without being replaced with positive barrier protection is a total of 2000 linear feet of existing rail or the total length of one run of existing rail, whichever is less. ALL OTHER HIGHWAYS: From the time that the existing guardrail is removed or from the time that temporary positive barrier protection is removed the Contractor has thirty (30) calendar days to install the new guardrail and anchors. During the interim, the location without guardrail shall be protected with drums spaced at a maximum spacing of twenty (20’) feet. The maximum length of rail that can be removed at any time without being replaced with positive barrier protection is a total of 1000 linear feet of existing rail or the total length of one run of existing rail, whichever is less. Based on existing field conditions, the Engineer may review the work and require that the guardrail be installed earlier than the maximum time allowed above by giving written notification to the Contractor via the TC-1 traffic control report. ALL HIGHWAYS: The contractor shall install new guardrail such that traffic exposure to fixed objects is minimized. Within the same work day, temporary attenuators, as defined in Subsection 150.05.B, should be installed on the approach to fixed objects that can’t be protected with guardrail. Truck mounted attenuators may be used to shield exposed fixed objects for periods not to exceed forty-eight (48) hours. No separate payment will be made for truck mounted attenuators.
AutoNDA by SimpleDocs
Guardrail. When the removal and installation of guardrail is required as a part of the work the following time restrictions shall apply unless modified by the special conditions: MULTI-LANE HIGHWAYS: From the time that the existing guardrail or temporary positive barrier protection is removed the Contractor has fourteen (14) calendar days to install the new guardrail and anchors. During the interim, the location without guardrail shall be protected with drums spaced at a maximum spacing of twenty (20’) feet. The maximum length of rail that can be removed at any time without being replaced with positive barrier protection is a total of 2000 linear feet of existing rail or the total length of one run of existing rail, whichever is less. ALL OTHER HIGHWAYS: From the time that the existing guardrail is removed or from the time that temporary positive barrier protection is removed the Contractor has thirty
Guardrail 

Related to Guardrail

  • Fencing The SPD shall Fence the demarcated boundary of the Demised Premises at the SPD’s own expense in every respect.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

  • Towing Contractor shall meet all requirements set forth in Title 46 CFR, Part 15 for Towing Assistance. Unless otherwise specified in the work request, Purchasers require a dead-ship tow plan to be approved by the Coast Guard in accordance with the Puget Sound Harbor Safety Committee for vessels over 50-feet, unless the Coast Guard deems the plan unnecessary. Contractor is responsible to obtain a tow plan and provide Purchaser with an approved copy at least one (1) business day prior to the tow. The plan is located on the Puget Sound Harbor Safety Committee’s website under the Safety Plan link on the left side of the page (xxxx://xxxxx.xxx/about). This site will have the most update version of the plan.

  • Outdoor Lighting 3.8.1 Lighting shall be directed to driveways, parking areas, loading area, building entrances and walkways and shall be arranged so as to divert the light away from streets, adjacent lots and buildings.

  • Trash Tenant shall not allow anything to be placed on the outside of the Building, nor shall anything be thrown by Tenant out of the windows or doors, or down the corridors or ventilating ducts or shafts, of the Building. All trash and refuse shall be placed in receptacles provided by Landlord for the Building or by Tenant for the Premises.

  • Toilets Papers, dust, cobwebs, peels, cans/bottles, cigarette butts, excrement on floor, bad smells, water pools, leaking sewage, rodents, animals (dead or alive), overflowing sanitary bins. 0 = NOT APPLICABLE 1 = UNACCEPTABLE (Toilets out of order. Toilets not cleaned on daily basis.) 2 = POOR (Toilets cleaned, but still visible signs of dirt, e.g. dust, cobwebs.) 3 = GOOD (Obvious sign that toilets are cleaned daily.) 4 = EXCELLENT (Extra effort is put in to ensure cleanliness, e.g. using detergents.)

  • Fences Except for establishment cost incurred by the United States and replacement cost not due to the Landowner’s negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock are the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the Easement Area are prohibited on the Easement Area, easement boundary, or on the Landowner’s land that is immediately adjacent to, and functionally related to, the Easement Area.