Impact on the System Development Pro Sample Clauses

Impact on the System Development Pro cess‌ CIF-HM-2: How do organizational procedures used in various sys- tem development life cycle processes need to be adapted when formal methods are introduced? When deploying formal methods in the automotive sector, it was really important to design a method enabling a progressive formalisation process. A large effort was devoted to designing an approach to a gradual introduction of formalism during the first pilot. This approach could extensively be reused during the second pilot with some improvement (see R-PQAM-1 on reuse). The main drivers for adapting the development procedure are the follow- ing: • Introduce formalism progressively using an intermediate semi-formal notation not requiring an expertise in formal methods. • Identify key properties early. Those will typically results in invariants and generate proof obligation at the most formal level. • Preserve traceability between the informal, the semi-formal and the formal models. • Enable teamwork on large models EM-PQAM-2: Does the use of a formal engineering model have any beneficial effect on requirements and design traceability? In the case of the automotive pilot and enhanced pilot, the answer is a clear yes.
AutoNDA by SimpleDocs

Related to Impact on the System Development Pro

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Program Development NWESD agrees that priority in the development of new applications services by XXXXX shall be in accordance with the expressed direction of the XXXXX Board of Directors operating under their bylaws.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Professional Development Program (a) The parties agree to continue a Professional Development Program for the maintenance and development of the faculty members' professional competence and effectiveness. It is agreed that maintenance of currency of subject knowledge, the improvement of performance of faculty duties, and the maintenance and improvement of professional competence, including instructional skills, are the primary professional development activities of faculty members.

  • Project Plan Development of Project Plan Upon the Authorized User’s request, the Contractor must develop a Project Plan. This Project Plan may include Implementation personnel, installation timeframes, escalation procedures and an acceptance plan as appropriate for the Services requested. Specific requirements of the plan will be defined in the RFQ. In response to the RFQ, the Contractor must agree to furnish all labor and supervision necessary to successfully perform Services procured from this Lot. Project Plan Document The Contractor will provide to the Authorized User, a Project Plan that may contain the following items: • Name of the Project Manager, Contact Phone Numbers and E-Mail Address; • Names of the Project Team Members, Contact Phone Numbers and E-Mail Address; • A list of Implementation milestones based on the Authorized User’s desired installation date; • A list of responsibilities of the Authorized User during system Implementation; • A list of designated Contractor Authorized Personnel; • Escalation procedures including management personnel contact numbers; • Full and complete documentation of all Implementation work; • Samples of knowledge transfer documentation; and • When applicable, a list of all materials and supplies required to complete the Implementation described in the RFQ. Materials and Supplies Required to Complete Implementation In the event that there are items required to complete an Implementation, the Contractor may request the items be added to its Contract if the items meet the scope of the Contract. Negotiation of Final Project Plan If the Authorized User chooses to require a full Project Plan, the State further reserves the right for Authorized Users to negotiate the final Project Plan with the apparent RFQ awardee. Such negotiation must not substantively change the scope of the RFQ plan, but can alter timeframes or other incidental factors of the final Project Plan. The Authorized User will provide the Contractor a minimum of five (5) business days’ notice of the final negotiation date. The Authorized User reserves the right to move to the next responsible and responsive bidder if Contractor negotiations are unsuccessful.

  • Development 3.3 Within twenty (20) Working Days after the Commencement Date and in accordance with paragraphs 3.10 to 3.12 (Amendment and Revision), the Contractor will prepare and deliver to the Authority for approval the full and final Security Plan which will be based on the draft Security Plan set out in Appendix B.

  • Development Period The Contractor may commence pre-construction activities like utility shifting, boundary wall construction or any other activity assigned to the Contractor by the Authority to enable construction of the Project Highway immediately after signing of the Agreement, to the extent that such work is ready for execution. The Parties agree that these works may be taken up and completed to the extent feasible by the Contractor, before declaration of the Appointed Date, but no claim against the Authority for delay shall survive during this period and that the undertaking of these works by the Contractor shall not count towards the Scheduled Construction Period of the project which starts counting only from the Appointed Date. No construction activity of the Project Highway shall be undertaken during the development period.

Time is Money Join Law Insider Premium to draft better contracts faster.