Inspection Schedule Sample Clauses

Inspection ScheduleThe Owner and General Contractor, where applicable, shall also acknowledge the following conditions applicable to Special Inspection and/or Testing.
Inspection Schedule. HydroCorp shall determine and coordinate the inspection schedule. Inspection personnel will check in/out on a daily basis with the Utility’s designated contact person. The initial check in will include a list of inspections scheduled. An exit interview will include a list of inspections completed.
Inspection Schedule a. Detailed Inspection. A detailed inspection must be performed at least once a year. If a history of recorded pavement deterioration is available, i.e. Pavement Condition Index (PCI) survey as set forth in Advisory Circular 150/5380-6, Guidelines and Procedures for Maintenance of Airport Pavements, the frequency of inspections may be extended to three years. b. Drive-by Inspection. A drive-by inspection must be performed a minimum of once per month to detect unexpected changes in the pavement condition.
Inspection Schedule. The Safety Committee will be kept informed of workplaces which are covered by this clause and will be given a tentative inspection schedule showing the quarter each particular site will be inspected.
Inspection Schedule. Project shall be inspected by Inspection Team in accordance with
Inspection Schedule. Long-Term Activities
Inspection Schedule a. Inspections shall be conducted at a frequency of: (1) At least once every five business days; or (2) At least once every 10 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted no later than the next business day. b. Where areas have been temporarily stabilized or land-disturbing activities will be suspended due to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection frequency may be reduced to once per month. If weather conditions (such as above freezing temperatures or rain or snow events) make discharges likely, the operator shall immediately resume the regular inspection frequency. c. Representative inspections may be utilized for utility line installation, pipeline construction, or other similar linear construction activities provided that: (1) Temporary or permanent soil stabilization has been installed and vehicle access may compromise the temporary or permanent soil stabilization and potentially cause additional land disturbance increasing the potential for erosion; (2) Inspections occur on the same frequency as other construction activities; (3) Control measures are inspected along the construction site 0.25 miles above and below each access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature intersects the construction activity and access does not compromise temporary or permanent soil stabilization); and (4) Inspection locations are provided in the report required by Part II F.
Inspection ScheduleResident Engineer and Subdivider shall meet and confer prior to and during construction of the Project to establish an inspection schedule for the Project.
Inspection Schedule. 8 i. All Target Properties will be subject to the Audit in accordance with the 9 following schedule: 10 ii. Within thirty (30) calendar days of the Effective Date for this CA/FO, 11 Respondent shall submit to EPA a list of Target and Non-Target Properties. 12 iii. Inspections of the Target and Non-Target Properties shall be completed by 13 April 1, 2021.
Inspection Schedule. (a) On completion of the Detailed Design, the Council will provide a schedule of inspections to be undertaken by Council of the Public Domain Works which has been prepared as a result of consultation with the Owner (Inspection Schedule) to occur at specified stages of the construction of the Public Domain Works (Inspection Stage). (b) If the Council does not provide the Inspection Schedule, the Owner must request the Inspection Schedule from the Council prior to the Public Domain Works commencing.