InsulationCoordination Sample Clauses

InsulationCoordination. The system design parameters for substations/switchyards shall be as given below: Sl No Description of parameters 400/220kV Bikaner-II PS 400kV Bhiwadi GIS S/S Extn. 400kV Khetri S/S Extn. 400 kV System 220 kV System 400 kV System 400 kV System
AutoNDA by SimpleDocs

Related to InsulationCoordination

  • Project Management and Coordination The Engineer shall coordinate all subconsultant activity to include quality of and consistency of work and administration of the invoices and monthly progress reports. The Engineer shall coordinate with necessary local entities.

  • General Coordination 5.1.1 Contractor’s Pre-Construction Phase Services team shall attend Project Team meetings with Owner, Owner representatives, and A/E at regularly scheduled intervals throughout the Pre-Construction Phase. Frequent Project Team meetings are anticipated prior to Owner acceptance of the GMP and during completion of the Construction Documents.

  • Utility Coordination Identify all potential utility conflicts and provide preliminary office check plans showing the problem locations, posted to the City’s FTP site. Plans will clearly identify specific utility company facilities by color and by name (i.e. not just “gas” or “fiber optic”). ENGINEER shall include a conflict list for each utility, also posted to the FTP site. ENGINEER shall meet with utility company representatives to review plans and utility verification forms (Attachment No. 3 to Exhibit “A”) at each milestone date and as directed by the CITY and as determined necessary by the ENGINEER. This in- formation will be compiled into a summary report (Attachment No. 4 to Exhibit “A” also available on the City’s FTP site) maintained and updated by ENGINEER as necessary to present a cohesive and reflective status of utilities, and provided to the City as necessary. ENGINEER shall maintain involvement with utility companies until all conflicts have been resolved (not just identified). When appropriate, the City Engineer will approve the identification on plans of conflicts to be resolved during construction. ENGINEER shall meet with involved utility company/ies and project contractor to resolve any conflicts with utilities that occur during construction.

  • Project Coordination The Engineer shall coordinate all subconsultant activity to include quality and consistency of deliverables and administration of the invoices and monthly progress reports. The Engineer shall coordinate with necessary local entities.

  • Donor Coordination Throughout the multi-year development of the Compact, MCC and the Government have engaged in an inclusive process that included consultations with the United States Government, Nepali communities and key private sector actors, non-government actors, and other donors as well as multilateral organizations. In particular, MCC worked closely with the World Bank and the Asian Development Bank in reviewing and agreeing on various power sector reforms required in Nepal for future programming by the two banks. MCC also consulted frequently with the United Kingdom’s Department for International Development (“DFID”) during its preparation of a political economy analysis of power sector reform.

  • Coordination The Parties shall confer regularly to coordinate the planning, scheduling and performance of preventive and corrective maintenance on the Large Generating Facility and the Interconnection Facilities.

  • COORDINATION WITH OTHER CONTRACTORS Contractor expressly acknowledges and agrees that other contractors may be performing work on other projects at the Site, while the Work is taking place, in which event Contractor shall fully cooperate with District and other contractors while performing the Work, at no additional cost to District.

  • Coordinators The contractor shall assign coordinators as needed to coordinate At-Sea Monitor deployment and provide At-Sea Monitor support services. The coordinator shall be designated as key personnel under this contract (per section H.8). All coordinators are required to maintain current At-Sea Monitor Certification. Ensure that all key personnel attend any refresher trainings for At-Sea Monitors. For a specific job description see Section J, Attachment 2, Labor Category Classifications and Job Descriptions.

  • Operation and Coordination The ISO shall direct the operation of, and coordinate the maintenance scheduling of, certain facilities of the NYS Power System, including coordination with control centers maintained by the Transmission Owners in accordance with the Reliability Rules, as follows:

  • Order Coordination and Order Coordination-Time Specific 2.1.9.1 “Order Coordination” (OC) allows BellSouth and Global Connection to coordinate the installation of the SL2 Loops, Unbundled Digital Loops (UDL) and other Loops where OC may be purchased as an option, to Global Connection’s facilities to limit end user service outage. OC is available when the Loop is provisioned over an existing circuit that is currently providing service to the end user. OC for physical conversions will be scheduled at BellSouth’s discretion during normal working hours on the committed due date. OC shall be provided in accordance with the chart set forth below.