Inverters/Isolation Transformer Combination Equipment. In addition to being listed to UL 1741, inverters must also be unused and of recent manufacture and listed on the CEC current list of Eligible Renewable Equipment. Inverters must be sized to properly accommodate the DC input from the PV panels under all expected electrical, thermal, and other operational conditions and be designed for normal unattended operation. The inverter must contain all self-protection features as stated in IEEE 929 including over and under voltage and frequency safeguards. An integral, anti-islanding protection scheme shall prevent the inverter from feeding power to the utility grid in the event of a utility outage. Inverter efficiency shall be rated at greater than or equal to 95%. The inverter shall include provisions for automatic operation including start up, shut down, self-diagnosis, and fault detection. Inverter shut off and reset toggle switches shall be provided. The DC array capacity to AC inverter capacity shall not exceed 115%. AC current distortion at rated power must be less than 5% Total Harmonic Distortion (THD) at all power output loadings. The inverters shall be interconnected to the customer’s electrical panel in a manner that meets code and utility requirements. The inverters shall be housed in an appropriately shaded, waterproof and dust proof enclosure, or in a building. The inverters shall have provisions to prevent moisture condensation and entrance of rodents into air intake or exhaust ports. The inverter enclosure shall take into consideration the effects of direct sunlight and extreme weather such that the inverters are appropriately shielded from the elements. The inverter enclosure should be well ventilated so that the inverters operate safely at or near their maximum power point (MPP). The following specific codes and standards shall apply to the inverter installation and operation: - ANSI /IEEE 519 1981 Guide for Harmonic Control of Static Power Controllers. - ANSI Test Code C57, 12.91 for Factory Tests of Dry Type Transformers.
AutoNDA by SimpleDocs

Related to Inverters/Isolation Transformer Combination Equipment

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Alternative Interconnection Arrangements 3.1 In addition to the foregoing methods of Interconnection, and subject to mutual agreement of the Parties, the Parties may agree to establish an End Point Fiber Meet arrangement, which may include a SONET backbone with an optical interface at the OC-n level in accordance with the terms of this Section. The Fiber Distribution Frame at the Reconex location shall be designated as the POI for both Parties.

  • Unbundled Network Element Combinations 4.1 For purposes of this Section, references to “Currently Combined” Network Elements shall mean that the particular Network Elements requested by NewPhone are in fact already combined by BellSouth in the BellSouth network. References to “

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

Time is Money Join Law Insider Premium to draft better contracts faster.