Irrigated Land Sample Clauses

Irrigated Land. ‌ Approximately 8,500 acres within the low-elevation area of the Ranch are flood irrigated xxxxxxx (irrigated land). The irrigated land is shown on Figure 3. The irrigated land accounts for nearly half of the annual cattle forage produced on the Ranch. Most of the forage (hay) grown under irrigation is harvested by grazing, however from time to time, portions of the irrigated land are mechanically swathed, raked and baled, and stored for winter use. Water is distributed from the Neponset Reservoir to the irrigated land via a series of canals and ditches maintained and managed/operated by DLL staff. Some forb producing field edges and ditch banks adjacent to sagebrush are used by GSG as early and late brood rearing habitat.
AutoNDA by SimpleDocs

Related to Irrigated Land

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Lots 5.1. The 1 (one) standard lot size is the measurement unit specified for each CFD. The Company may offer standard lots, micro-lots and mini-lots, in its discretion, as defined from time to time in the Contract Specifications or the Company’s Website.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Cemetery The Local Church agrees and insures that, after the Disaffiliation Date, its cemetery and/or columbarium, will continue to be maintained in substantially the same manner as presently maintained. In addition, Local Church will honor any and all contracts, deeds, and agreements for burial and/or internment in its cemetery or columbarium, as well as insuring and continued access for families and loved ones of United Methodists buried there and for burials in unfilled xxxxxx and columbarium slots (including granting an access easement to the Conference and members of the United Methodist Church for visitations, historical research, and related purposes).

Time is Money Join Law Insider Premium to draft better contracts faster.