Land Survey. All lots require fire setbacks in order to meet fire codes. In the event that this Agreement is transferred, sold or otherwise assigned, the Lessee agrees that as a condition of the Lessor’s consent to such transfer, sale or assignment, Lessee shall at its own cost obtain a survey of the leasehold including necessary fire setbacks and the Leased Premises as defined herein shall be amended in accordance with this survey to include such necessary fire setbacks if any.
Land Survey. At any time during the term of this Option, Purchaser may have prepared, at Purchaser's cost, a survey of the Premises by a registered land surveyor (the "Survey"). The Survey shall be used to compute the legal description of the real property to be purchased pursuant to this Option. In the event such Survey discloses any defects in Owner's title, Purchaser shall so notify Owner and Owner shall endeavor to cure the same within 30 days after such notice, or such other period agreed to by Purchaser and prior to closing. If such defects are not cured by the Closing Date, Purchaser shall have the same remedies as are allowed in Section 7 above for title defects disclosed in the Title Commitment.
Land Survey. OFPC will furnish a land survey of the site. In order to assist OFPC in providing the most comprehensive information from the registered professional land surveyor (RPLS) firm, the Project Manager will request the Project Architect/Engineer to recommend the scope of work for the land survey by separate correspondence. (See the Agreement, Article 2.)
Land Survey. UTH will furnish a land survey of the site. In order to assist UTH in providing the most comprehensive information from the registered professional land surveyor (RPLS) firm, the Project Manager will request the Project Architect/Engineer to recommend the scope of work for the land survey by separate correspondence. (See the Agreement, Article 2.)
Land Survey. 38 Septic Inspection .......................................... 39 Soils Inspection ........................................... 40 Well Inspection ........................................... 41 Other: N/A ............. 42 ......................................... ......................................... ......................................... ......................................... ......................................... ......................................... ......................................... ......................................... .................................. .................................. .................................. .................................. X .................................. X .................................. X .................................. X .................................. .................................. X .................................. X .................................. X .................................. .................................. .................................. .................................. .................................. X 43 D. 44 45 46 Septic .......................................................... 47 Well ............................................................. 48 Other: N/A ............. 49 ......................................... ......................................... ......................................... .................................. X .................................. X .................................. .................................. .................................. .................................. X 50 The foregoing expenses for inspections and certifications will be paid outside of Escrow unless the Parties present instructions to 51 the contrary prior to XXX (along with the applicable invoice). A certification is not a warranty. All inspections and 52 certifications are to be performed by a company licensed and bonded in Nevada. Notwithstanding the above elections, in the event 53 an inspection reveals problems with any of the foregoing, Buyer reserves the right to require a certification. This section
Land Survey a land survey of the land included within the Property prepared by a licensed engineer or registered land surveyor in accordance with the Survey Requirements.
Land Survey. Article 1 The land parcel under this Agreement (hereinafter the “Plot”) is located in Lunjiao Sub-district, Shunde District; Plot Map No. 160078-003(4), located in [REDACTED]; Land Area: 35954.38 m2 (Equivalent to about 53.93 mu); Nature of land Use: Industrial Land (New industrial land).
Land Survey. If not required to be furnished by the Design Consultant under this Agreement but required for the performance of the Design Consultant’s services, the City shall furnish an accurate land survey of the Site, giving, as applicable:
(i) Grades and lines of streets, alleys, pavements, and adjoining property.
(ii) Rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries, and contours of the Site.
(iii) Locations, dimensions, and floor elevations pertaining to existing buildings, other improvements, and trees.
(iv) Information in the City’s possession concerning available service and utility lines, both public and private.
Land Survey. Must be licensed in the State of Idaho as a Professional Land Surveyor.
Land Survey. If requested by Architect and required for the performance of this Agreement by Architect, County shall furnish a land survey of the Site and the location on the Site of Existing Improvements, prepared by a licensed surveyor, including grades and lines of streets, alleys, pavements and adjoining property and locations, dimensions and elevations of trees and Existing Improvements above the surface of the ground.