Animals and Pets 3.11.1 Not keep any animals, birds, reptiles or pets of any description in the Property without the prior written consent of the Landlord such consent not to be unreasonably withheld but can be withdrawn upon reasonable notice.
Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.
Sick and Personal Leave The Assistant Principal shall annually be entitled to twelve (12) days of sick leave and two (2) days of personal leave. Unused personal leave days will accumulate as sick leave days. Earned sick leave may accumulate to a maximum of 340 days. Every sick day that is issued for the current school year and eventually not utilized during that school year will be multiplied by 1.5 at the end of the school year (e.g., 10 unused sick days on June 30, 2022 will be converted in a credit of 15 sick days for the Assistant Principal’s use.) This unused sick day multiplier will not be in effect during the four (4) years prior to retirement.
Fixtures and Personal Property All machinery, equipment, fixtures (including, but not limited to all heating, air conditioning, plumbing, lighting, communications and elevator fixtures) and other property of every kind and nature whatsoever owned by Borrower, or in which Borrower has or shall have an interest, now or hereafter located upon the Land or the Improvements, or appurtenant thereto, and used in connection with the present or future operation and occupancy of the Land and the Improvements and all building equipment, materials and supplies of any nature whatsoever owned by Borrower, or in which Borrower has or shall have an interest, now or hereafter located upon the Land and the Improvements, or appurtenant thereto, or used in connection with the present or future operation and occupancy of the Land and the Improvements (collectively, the "Personal Property"), and the right, title and interest of Borrower in and to any of the Personal Property which may be subject to any security interests, as defined in the Uniform Commercial Code, as adopted and enacted by the state or states where any of the Property is located (the "Uniform Commercial Code"), superior in lien to the lien of this Security Instrument and all proceeds and products of the above;
Nurses Unit and Per Diem Nurses Unit This Agreement is made and entered into by and between the County of San Bernardino hereinafter referred to as the “County” and the California Nurses Association hereinafter referred to as the “Association” or “CNA”.
WATERBEDS The Tenant: (check one)
Fire Extinguishers Provide UL-listed extinguishers, cabinets and accessories from a single manufacturer such as X.X. Industries or Xxxxxx’x Manufacturing Company that comply with local fire marshal approval. 12.1 Systems Furnishings: Systems furnishings will be supplied and installed by the State. It will be the Lessor’s responsibility to complete the electrical connections from the building electrical grid to the power connections or power poles for the system furnishings (see Division 16, Electrical).
Appliances The Landlord shall: (check one) ☐ - Provide the following appliances: [ENTER APPLIANCES] ☐ - Not provide any appliances.
Musculoskeletal Injury Prevention and Control The hospital in consultation with the Joint Health and Safety Committee (JHSC) shall develop, establish and put into effect, musculoskeletal prevention and control measures, procedures, practices and training for the health and safety of employees.
Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure.