MAINTENANCE OF THE PROJECT (11-20-07) (Rev. 1-17-12) 104-10 SP1 G125 Revise the 2012 Standard Specifications as follows: Page 1-35, Article 104-10 Maintenance of the Project, line 25, add the following after the first sentence of the first paragraph: All guardrail/guiderail within the project limits shall be included in this maintenance. Page 1-35, Article 104-10 Maintenance of the Project, line 30, add the following as the last sentence of the first paragraph: The Contractor shall perform weekly inspections of guardrail and guiderail and shall report damages to the Engineer on the same day of the weekly inspection. Where damaged guardrail or guiderail is repaired or replaced as a result of maintaining the project in accordance with this article, such repair or replacement shall be performed within 7 consecutive calendar days of such inspection report. Page 1-35, Article 104-10 Maintenance of the Project, lines 42-44, replace the last sentence of the last paragraph with the following: The Contractor will not be directly compensated for any maintenance operations necessary, except for maintenance of guardrail/guiderail, as this work will be considered incidental to the work covered by the various contract items. The provisions of Article 104-7, Extra Work, and Article 104-8, Compensation and Record Keeping will apply to authorized maintenance of guardrail/guiderail. Performance of weekly inspections of guardrail/guiderail, and the damage reports required as described above, will be considered to be an incidental part of the work being paid for by the various contract items.
MAINTENANCE OF THE SAID PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project until the taking over of the maintenance of the project by the association of allottees upon the issuance of the completion certificate of the project. The cost of such maintenance has been included in the Total Price of the Xxxx.
For Product Development Projects and Project Demonstrations Published documents, including date, title, and periodical name. Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates. Greenhouse gas and criteria emissions reductions. Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits. Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project. A discussion of project product downloads from websites, and publications in technical journals. A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.
Project Maintenance The Local Government shall be responsible for maintenance of locally owned roads and locally owned facilities after completion of the work. The State shall be responsible for maintenance of the state highway system after completion of the work if the work was on the state highway system, unless otherwise provided for in existing maintenance agreements with the Local Government.
Maintenance and Warranty Service Reports The report shall include the name of the Authorized User and all of the information in Section 2.24.1 and be submitted electronically in Microsoft Excel 2010 or newer version unprotected, via e-mail to the attention of the OGS Contract Administrator.
Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.
Equipment and Materials Contractor at its sole cost and expense shall provide and furnish all tools, labor, materials, equipment, transportation services and any other items (collectively, "Equipment") which are required or necessary to perform the Services in a manner which is consistent with generally accepted standards of the profession for similar services. Notwithstanding the foregoing, District shall not be responsible for any damages to persons or property as a result of the use, misuse or failure of any Equipment used by Contractor of the Contracted Parties, even if such Equipment is furnished, rented or loaned to Contractor or the Contracted Parties by District. Furthermore, any Equipment or workmanship that does not conform to the regulations of this Agreement may be rejected by District and in such case must be promptly remedied or replaced by Contractor at no additional cost to District and subject to District’s reasonable satisfaction.
MAINTENANCE OF THE SAID BUILDING APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the association of the allottees. The cost of such maintenance has been included in the Total Price of the [Apartment/Plot]. [Insert any other clauses in relation to maintenance of project, infrastructure and equipment]
Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:
TECHNICAL SUPPORT AND MAINTENANCE If technical support and maintenance is a part of the Goods that Contractor provides under the Contract, Contractor will use commercially reasonable efforts to respond to the Department in a reasonable time when the Department makes technical support or maintenance requests regarding the Goods.