Mathematical Building Blocks Sample Clauses

Mathematical Building Blocks. A. Secrecy via Coded Cooperative Data Exchange Our approach is motivated by recent results on secret key agreement via the coded cooperative data exchange (CCDE) problem. Introduced first by El Rouayeb, et al. in [26], the CCDE problem has received significant attention (e.g., [14, 27]) and is stated as follows. Suppose that k packets are distributed among a network of t clients. What is the minimum number of transmissions M required to recover all k packets at all t clients? In [28], it was shown that if the network5 is fully connected, then the CCDE problem can be solved in polynomial time. At roughly the same time, Chan [19] and Milosavljevic, et al. [32] independently established similar results. In general, less than k transmissions are required by optimal CCDE solutions in fully-connected networks. The 5While the networks considered in this work need not be fully connected at the physical layer (PHY), cryptographic protocols are often implemented at higher layers that see an abstracted, one-hop topology. Moreover, a number of emerging wireless stacks employ cooperative flooding protocols at the PHY and present a fully-connected topology to higher layers [29–31].
AutoNDA by SimpleDocs
Mathematical Building Blocks 

Related to Mathematical Building Blocks

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Workplace adjustment An employer wishing to employ a person under the provisions of this clause shall take reasonable steps to make changes in the workplace to enhance the employee’s capacity to do the job. Changes may involve re-design of job duties, working time arrangements and work organisation in consultation with other employees in the area.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • MAINTENANCE OF THE BUILDING /APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the Association upon the issuance of the completion certificate of the Project. The cost of such maintenance has been included in the Total Extras and Deposits as mentioned in clause 1.2.

  • Building Maintenance The host facility provider shall maintain (in a state of good repair) all buildings used for the educational program. All damages made by the AGENCY’s program will be the responsibility of the AGENCY to repair.

  • Building With respect to each parcel of Real Estate, all of the buildings, structures and improvements now or hereafter located thereon. Business Day. Any day on which banking institutions located in the same city and State as the Agent’s Head Office are located are open for the transaction of banking business and, in the case of LIBOR Rate Loans, which also is a LIBOR Business Day.

  • Work Area The specific work area and/or crew an employee reports to on a daily schedule. Work areas are generally smaller divisions of a larger Bid Area.

  • CURVE WIDENING The minimum widening placed on the inside of curves is:  6 feet for curves of 50 to 79 feet radius.  4 feet for curves of 80 to 100 feet radius.

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

Time is Money Join Law Insider Premium to draft better contracts faster.